EnerMech wins Curtis Island LNG deal
Mechanical engineering group, EnerMech, said it has been awarded multi-million dollar contracts for the air drying and nitrogen purging of all six gas storage tanks at Queensland’s Curtis Island LNG developments in Australia.
Three LNG process plants are currently under construction, with train 1 commissioning phases now complete at one of the plants and well underway at the other two, the company said in a statement.
The three plants, located off the coast of Gladstone on Curtis Island, are part of AUD$ 70 billion upstream and downstream facilities projects which will provide 8% of the world’s global LNG production and annually produce 24.5 million metric tons of LNG converted from coal seam gas.
Aberdeen-headquartered EnerMech has been engaged by Bechtel to provide pre-engineering, supervision, labour and equipment for the air drying and nitrogen purging of the LNG storage tanks on the three projects, namely Queensland Curtis LNG, Australia Pacific LNG and GLNG.
Tank capacities range between 140,000 m3 and 160,000 m3 of LNG and is roughly the equivalent volume of 56 Olympic-size swimming pools per tank.
In addition to the air drying and nitrogen purging, EnerMech has now been engaged by Bechtel to undertake pre-commissioning work across the three Curtis Island projects, with services including lube oil flushing, chemical cleaning, nitrogen purging and pressure testing, high-pressure water jetting, painting and blasting, rope access, valve testing and repair, and blowing and drying.
Source: LNG World News