
Civil Engineer- Site Execution
Last Updated: 30th June 2019 (over 3 years ago)
Summary
B.E in Civil Engineering degree and competency in use computer aided softwares. Looking to leverage any knowledge and experience into a challenging role.
Posses following skills with certifications:
Primavera P6, Microsoft Project, Autocad and HSE Management System.
Driving License:
United Arab Emirates & Pakistan
Education
Licensed Registered Engineer
Feb 2013
— Jun 2019
ERASMUS MUNDUS- Exchange Program
Dec 2011
— Mar 2012
B.E in Civil Engineering
Jan 2009
— Dec 2012
with 60%/ 2.8 GPA on comparison of Pakistani education to international standards.
Experience
Civil Engineer
Oct 2018
— Current
• Scheduling on MS Project/ Primavera.
• Site layout and leveling.
• Preparation of shop drawings
• Material submittals preparation.
• Management of material supply chain.
• Preparation of bar bending schedules reinforcement detailing.
• Manpower and other resources allocation.
• To conduct field density test of backfilling layers.
• Inspection of formwork and safety check.
• Supervision of concrete pouring with temperature and slump check.
• Preparation of Interim Payment Certificates.
Project Engineer
Jul 2017
— Sep 2018
Preparation of schedules and adhering to strict schedule requirements on Microsoft Project software.
Planning and allocation of resources.
To generate weekly and monthly progress reports.
Interpretation of drawings and designs.
To ensure coordination between contract agreement and construction activities.
Preparation of submittals for necessary approvals.
Preparation of shop drawings.
Take lead on construction issues and monitor work performance of sub-staff and sub-
contractors.
Coordination with vendors and sub-contractors. Mentoring and motivating team members to ensure maximum productivity.
Observance of safety requirements.
Junior Engineer
Jan 2013
— Dec 2016
To ensure performance of the work in strict accordance with the drawings and specification.
Supervision and Inspection of 'additional works’ and 'out of scope works’ carried out by contractor.
Process the joint measurement forms and maintain the records of their status.
Maintain records of completed works for interim and final payment and as-built plans.
Make special notes and document the contractor’s activities that may lead to claims.
Check temperature, compaction, joints and surface of asphalt.
Check all form works, temp. and reinforcement etc before concrete pouring.
Check the alignment and levels, sand cushion thickness of sewers.
Co-ordinate and co-operate with Contractors site Foreman for all the activities.
Adhere to safe working methods and report to Executive Engineer for any accidents on site.
Maintain a detailed diary of the day’s work activities, issues, work approved or rejected, hours of operation, labor and equipment used etc.
Coordinate with the laboratory technician and arrange for sampling and testing of satisfactorily completed work and quality assurance testing of suspect materials.
Checking the 'Day work records’ submitted by contractor.
Supervision and Inspection of all construction activities carried out by contractor on site.
Maintaining records of site resources, daily progress of work, inspections, construction
and workshop drawings, method statements and ITPs (Inspector Testing Plans). Making special notes and document the contract activities that may lead to claims.