Oil and Gas Construction Professional
Last Updated: 23rd February 2020 (over 2 years ago)
Summary
I worked in different countries like Kazakhstan, Oman, Angola, Nigeria, Yemen & Myanmar and I also worked with different operators like British Gas, Chevron, ENI, Lukoil, ExxonMobil, Petroleum Development of Oman, Oman Gas Company and TOTAL.
I would like also to bring to your company a broad range of skills, including:
1- Computer Skills
2- Team work skills
3- Organization skills
4- Communication skills
Education
Master of Science in Mechanical Engineering
Sep 1988
— Jun 1994
Experience
Hook Up Lead
May 2018
— Jun 2018
• To have knowledge of Project technical referential and international standards related to area of responsibility.
• To ensure proper answer (in coordination with Company’s engineering team when appropriated) to Contractor technical Site Queries related to hook-up.
• To lead and support in daily works the Superintendent placed under his responsibility.
• To ensure all along offshore construction that the FPSO Contractor is enforcing his contractual commitments, is implementing properly his construction plan and objectives, and is performing safely his activities as per project specifications, design and codes.
As such:
- Participate to KOM with contractor/subcontractor discipline matters.
- Monitor and control the implementation on site of the approved drawings and plans.
- Ensure that the works are closely inspected by Contractor’s QC inspection team.
• To ensure the tracking of anomalies and non-conformities related to disciplines performed by the FPSO contractor and ensure correct follow-up activities in the relevant Topside construction site.
• In General:
- To assist the Hook Up Manager as and when required.
- To provide technical support and assistance to company personnel and also to contractor’s and subcontractor’s personnel if needed.
- Analyse and resolve issues and problems encountered and make necessary arbitration between different disciplines.
- To maintain good relationships with Contraction, but being strict to achieve the project objectives.
• Report to the Hook up Leader and in particular when deviations to work are detected.
• To ensure confidentiality of all the documentation issued under the area of responsibility.
Offshore Construction Superintendent
Nov 2015
— Aug 2017
• Champion on-site safety awareness and safe performance with contractor and among Project Team members.
• Serve as day-to-day interface with contractor and craft labour during the Construction Phase, providing a focus on safety, quality, cost, and schedule
• Provide on-site support to the Construction Site Manager / Construction Site Lead as required
• Provide support to pre-commissioning/mechanical completion/systems completion as required
• Coordinate Quality Audits and other site surveillance activities and monitor environmental compliance and safety procedures
• Provide oversight of contractors materials management/verification systems
• Ensure compliance with specifications, procedures, and plans
• Interface with contractor for field level changes, e.g., scope, costs, etc.
Company Site Representative
Oct 2012
— Sep 2014
• Manage and Control the construction activities and work performed by the contractor in close relation with his contractor counterpart at supervision level.
• Issue field instructions to the contractor when required, with the approval of the Project Manager& Engineering manager based in Pau, and to record facts related to potential or issued VORs.
• Ensure that contractor HSEand quality practices are acceptable, that proper measures and procedures are being implemented by everyone concerned, and that all risks are evaluated and planned for by the contractor.
• Coordinate with other projects, operations, commissioning, in order to ensure that work is performed as per the Project requirements
• Ensure that area planning is compatible with project objectives and that progress achieved is in line with the plan.
• To ensure that the contractor’s construction equipment, personnel and other resources are sufficient and are mobilised and demobilised in good time.
• To focus on the early identification of potential problems and to propose appropriate solutions to Project Manager &project site management.
Hook-Up and Engineering Lead
Jul 2011
— Jul 2012
• Preparation of project procedures.
• Follow up the preparation site scan surveys done by subcontractor.
• Follow up the preparation of Job cards.
• Follow up the material preparation and take off.
• Follow up all the engineering discrepancies from site on daily basis.
Hook Up Manager
Dec 2008
— Feb 2011
• Supervising and interfacing with the Construction teams, during the execution of construction activities, ensuring quality, time and cost control of the work according to contractual requirements, and in compliance with specifications and standards established.
• Reviewing and commenting on documentation (e.g. technical reports, specifications, procedures, drawings, etc.) ensuring implementation of established procedures and good engineering practice.
• Coordinating of monitoring and reporting technical progress.
• Performing technical assessment of the works performed by the construction teams and reporting on the findings.
• Coordinating the review and approval of the "As Built" and "As Installed" documentation.
• Providing technical support for the closing stages and activities of the whole project.
• Supervise and correctly direct Construction and Management Service relating to pertinent area.
• Managing all contract aspects, in respect of quality, timing and cost.
• Ensuring smooth and effective transfer of data, communication and interfaces between the client and the construction teams.
Project Engineer
May 2007
— May 2008
Section Engineer
Dec 2005
— Jun 2006
• Preparation of shop drawings.
• Preparation of all QA/QC procedures as dictated by ISO and in accordance with client requirements.
• Preparation of construction and mobilization schedules to ensure the availability of required plant, equipment manpower and material.
• Directing, supervising and co-coordinating of the project ensuring that work was executed in conformity with approved drawings, specifications cost and QA/QC procedures.
Mechanical Engineer
Jan 2005
— Dec 2005
• Preparation of all QA/QC procedures as dictated by ISO and in accordance with client requirements.
• Preparation of construction and mobilization schedules to ensure the availability of required plant, equipment, manpower and material.
• Directing, supervising and co-coordinating of the pipeline ensuring that work was executed in conformity with approved drawings, specifications cost and QA/QC procedures.
Fabrication Shops Section Head
Jul 2003
— Dec 2004
• Schedule the timing and execution of the fabrication of the Underground and aboveground piping scope in accordance to the instruction provided by the project manager.
• Endow with effective leadership in providing the overall direction to subordinates in the execution of operations in my area as per execution schedule.
• Provide regular reports to Planning / progress monitoring department on the conduct of operations in my area.
Mechanical Engineer
Mar 2000
— May 2003
• Liaison with client field management to assist smooth transition of systems handover.
• Investigation with client field management to assist smooth transition of handover systems.
• Investigation and resolving construction, material, engineering constraints and site queries.
• Supervision of piping hydro test activities
• Monitoring of the project schedule and the progress accordingly.
• Piping and mechanical progress reporting.
Technical instructor Technical drawing
May 1995
— Feb 2000
• Fellow teachers and trainees in AutoCAD and associated systems.