Oil and Gas Construction Professional


Last Updated: 23rd February 2020 (over 2 years ago)

Address
United Kingdom

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
45 to 54

Qualification Level
Masters

Languages
Arabic, English, Russian

Summary

I have 18 years' experience in Oil and Gas field. My major experience is in Management, engineering and construction. I have the experience of onshore, offshore and pipeline construction. I also have the experience of working in both brown, green fields and fabrication skills.
I worked in different countries like Kazakhstan, Oman, Angola, Nigeria, Yemen & Myanmar and I also worked with different operators like British Gas, Chevron, ENI, Lukoil, ExxonMobil, Petroleum Development of Oman, Oman Gas Company and TOTAL.
I would like also to bring to your company a broad range of skills, including:
1- Computer Skills
2- Team work skills
3- Organization skills
4- Communication skills

Education

National Technical University "Khakiv Polytechnic Institute"
Master of Science in Mechanical Engineering

   Sep 1988
— Jun 1994

Master of Science in Mechanical Engineering

Experience

TOTAL E and P Angola/EMATYS
Hook Up Lead

   May 2018
— Jun 2018

• To adopt and to demonstrate an exemplary behaviour with regard to Company Ethics and “Code of Induct” policy and HSSE rules and regulations.
• To have knowledge of Project technical referential and international standards related to area of responsibility.
• To ensure proper answer (in coordination with Company’s engineering team when appropriated) to Contractor technical Site Queries related to hook-up.
• To lead and support in daily works the Superintendent placed under his responsibility.
• To ensure all along offshore construction that the FPSO Contractor is enforcing his contractual commitments, is implementing properly his construction plan and objectives, and is performing safely his activities as per project specifications, design and codes.
As such:
- Participate to KOM with contractor/subcontractor discipline matters.
- Monitor and control the implementation on site of the approved drawings and plans.
- Ensure that the works are closely inspected by Contractor’s QC inspection team.
• To ensure the tracking of anomalies and non-conformities related to disciplines performed by the FPSO contractor and ensure correct follow-up activities in the relevant Topside construction site.
• In General:
- To assist the Hook Up Manager as and when required.
- To provide technical support and assistance to company personnel and also to contractor’s and subcontractor’s personnel if needed.
- Analyse and resolve issues and problems encountered and make necessary arbitration between different disciplines.
- To maintain good relationships with Contraction, but being strict to achieve the project objectives.
• Report to the Hook up Leader and in particular when deviations to work are detected.
• To ensure confidentiality of all the documentation issued under the area of responsibility.

TOTAL E and P Myanmar
Offshore Construction Superintendent

   Nov 2015
— Aug 2017

• Oversee site contractor fabrication, construction, and hook-up work activities during Execution Phase.
• Champion on-site safety awareness and safe performance with contractor and among Project Team members.
• Serve as day-to-day interface with contractor and craft labour during the Construction Phase, providing a focus on safety, quality, cost, and schedule
• Provide on-site support to the Construction Site Manager / Construction Site Lead as required
• Provide support to pre-commissioning/mechanical completion/systems completion as required
• Coordinate Quality Audits and other site surveillance activities and monitor environmental compliance and safety procedures
• Provide oversight of contractors materials management/verification systems
• Ensure compliance with specifications, procedures, and plans
• Interface with contractor for field level changes, e.g., scope, costs, etc.

TOTAL E and P Yemen/IOTA
Company Site Representative

   Oct 2012
— Sep 2014

• Check that the work is performed in compliance with the contract specifications, schedule and assess any deviations requested by the contractor.
• Manage and Control the construction activities and work performed by the contractor in close relation with his contractor counterpart at supervision level.
• Issue field instructions to the contractor when required, with the approval of the Project Manager& Engineering manager based in Pau, and to record facts related to potential or issued VORs.
• Ensure that contractor HSEand quality practices are acceptable, that proper measures and procedures are being implemented by everyone concerned, and that all risks are evaluated and planned for by the contractor.
• Coordinate with other projects, operations, commissioning, in order to ensure that work is performed as per the Project requirements
• Ensure that area planning is compatible with project objectives and that progress achieved is in line with the plan.
• To ensure that the contractor’s construction equipment, personnel and other resources are sufficient and are mobilised and demobilised in good time.
• To focus on the early identification of potential problems and to propose appropriate solutions to Project Manager &project site management.

Subsea7 Nigeria Lagos
Hook-Up and Engineering Lead

   Jul 2011
— Jul 2012

• Engineering of Topside scope of work.
• Preparation of project procedures.
• Follow up the preparation site scan surveys done by subcontractor.
• Follow up the preparation of Job cards.
• Follow up the material preparation and take off.
• Follow up all the engineering discrepancies from site on daily basis.

Saipem SA, Angola Cabinda Province
Hook Up Manager

   Dec 2008
— Feb 2011

• Leading the identification, adoption of appropriate HSE standards, in line with Company’s policy.
• Supervising and interfacing with the Construction teams, during the execution of construction activities, ensuring quality, time and cost control of the work according to contractual requirements, and in compliance with specifications and standards established.
• Reviewing and commenting on documentation (e.g. technical reports, specifications, procedures, drawings, etc.) ensuring implementation of established procedures and good engineering practice.
• Coordinating of monitoring and reporting technical progress.
• Performing technical assessment of the works performed by the construction teams and reporting on the findings.
• Coordinating the review and approval of the "As Built" and "As Installed" documentation.
• Providing technical support for the closing stages and activities of the whole project.
• Supervise and correctly direct Construction and Management Service relating to pertinent area.
• Managing all contract aspects, in respect of quality, timing and cost.
• Ensuring smooth and effective transfer of data, communication and interfaces between the client and the construction teams.

Saipem SA, Petromar Lda Angola Soyo Kwanda Base
Project Engineer

   May 2007
— May 2008

Controls & guarantees the availability of technical, human and functional recourses and information needed to achieve the project targets in terms of safety, costs, time and quality requested. Act as yard representative in front of yard project management and client. Ensure that all project disciplines are properly managed by subordinate staff for the successful execution of the yard production.

Hani Archirodon- Consolidated Contractors Company JV
Section Engineer

   Dec 2005
— Jun 2006

• Engineering of the electro-mechanical scope.
• Preparation of shop drawings.
• Preparation of all QA/QC procedures as dictated by ISO and in accordance with client requirements.
• Preparation of construction and mobilization schedules to ensure the availability of required plant, equipment manpower and material.
• Directing, supervising and co-coordinating of the project ensuring that work was executed in conformity with approved drawings, specifications cost and QA/QC procedures.

SAIPEM-CCIC JV
Mechanical Engineer

   Jan 2005
— Dec 2005

• Engineering of the whole scope, procurement and construction of the pipeline.
• Preparation of all QA/QC procedures as dictated by ISO and in accordance with client requirements.
• Preparation of construction and mobilization schedules to ensure the availability of required plant, equipment, manpower and material.
• Directing, supervising and co-coordinating of the pipeline ensuring that work was executed in conformity with approved drawings, specifications cost and QA/QC procedures.

CCIC Oman
Fabrication Shops Section Head

   Jul 2003
— Dec 2004

• Engineering of 7250 tons of piping, 1500 tons of pipe supports and 800 tons of structural steel and civil structural.
• Schedule the timing and execution of the fabrication of the Underground and aboveground piping scope in accordance to the instruction provided by the project manager.
• Endow with effective leadership in providing the overall direction to subordinates in the execution of operations in my area as per execution schedule.
• Provide regular reports to Planning / progress monitoring department on the conduct of operations in my area.

CCIC – Saipem JV
Mechanical Engineer

   Mar 2000
— May 2003

• Supervision of mechanical and piping construction and pre-commissioning activities.
• Liaison with client field management to assist smooth transition of systems handover.
• Investigation with client field management to assist smooth transition of handover systems.
• Investigation and resolving construction, material, engineering constraints and site queries.
• Supervision of piping hydro test activities
• Monitoring of the project schedule and the progress accordingly.
• Piping and mechanical progress reporting.

United Nations and Relief Works Agency (Lebanon)
Technical instructor Technical drawing

   May 1995
— Feb 2000

• Principal instructor for engineering drawing.
• Fellow teachers and trainees in AutoCAD and associated systems.

Ad
Ad
Ad