SURVEY MANAGER - EARTHWORKS SITE MANAGER


Last Updated: 9th January 2019 (over 3 years ago)

Address
Ankara, Turkey

E-mail
Locked

Phone Number
Locked

Qualification Level
Degree

Languages
English, Romanian, Turkish

Summary

Positive thinking
Highway construction Experiences
Highly self-motivated person, flexible and responsible
Honest and trustworthy, positive attitude
High leadership skill and effective at team building
Exceptional communication skills
Versatility and accept to change
Proven or demonstrated leading abilities

Education

YILDIZ TECHNICAL UNIVERSITY
Geodezy and Photogrametri Engineering (SURVEY ENGINEERING)

   Sep 2000
— Jun 2005

BACHELOR DEGREE OF Geodezy and Photogrametri Engineering, FACULTY OF CIVIL ENGINEERING

Experience

B.L HARBERT INTERNATIONAL
FIELD SURVEY ENGINEER

   Jul 2017
— Current

NEW EMBASSY BUILDING IN ANKARA
SURVEY ACTIVITY
AERIAL SURVEY
3D MODELLING
FIELD ENGINEERING

HMP CONSTRUCTION
SURVEY MANAGER

   Jul 2015
— Current

SEVERAL DAM PROJECT ALL AROUND THE COUNTRY

TUANA CO LTD
MANAGING DIRECTOR

   Oct 2013
— Jul 2015

• Issara Resort Phuket
• M-Narina Hotel Phuket
• YK Patong Resort Phuket
• Narina Kitchen

www.tuanahotels.com

BECHTEL - ENKA JOINT VENTURE
EARTHWORKS SITE MANAGER

   Jan 2013
— Oct 2013

• EW Superintendent for Kosova Motorway project, deal with all kind of EW activities and related activities, as the leader of the site crews
• Following equipment and man power organizations
• In charge with Design, Quantity and Quality issues
• Cost and planning
• I also took place in the safety walk downs

ASTALDI - ICTAS JOINT VENTURE
EARTHWORKS CHIEF

   Apr 2012
— Aug 2012

• EW Chief for WHSD project, deal with all kind of EW activities and related activities, as leader of the department
• Construction camp mobilization.
• Organize and follow sub-contractor activities
• Following equipment and man power organizations
• In charge with Design, Quantity and Quality issues
• Cost and planning
• I also took place in the safety walk downs

BECHTEL - ENKA JOINT VENTURE
EARTHWORKS SUPERINTENDENT

   May 2008
— Mar 2011

• Worked at AutoStrada Transilvania Project for the Becthel-Enka JV
• Responsible a section with all kind of eartwork activities (cut,fill,improvement,slope protections,pipe&surface drainage,hydrotechnical works and culverts)
• Following the material and transportation issues
• Following equipment and man power organizations
• In charge with Design, Quantity and Quality issues
• Cost and planning
• I also took place in the safety walk downs
• In charge with all guard rail activities of highway

BECHTEL - ENKA JOINT VENTURE
SURVEY SUPERINTENDENT

   Apr 2007
— May 2008

• Worked at AutoStrada Transilvania Project for the Becthel-Enka JV
• I got involved in producing and placing piles, foundations, elevation of bridges and viaducts, also box culverts
• I also took place in the safety walk downs to check site
• I review all the design about SOP,OGL,SGL
• I prepared RFI’s where is necessary, contact to designer to get FCR and DCNs
• I was in charge for all kind of handover receptions to controler

CADDELL - ENKA JOINT VENTURE
SURVEY SUPERINTENDENT

   Dec 2005
— Mar 2007

• Worked at the NEC (New Embassy Compound) Project for the Caddell-Enka corporation
• I got involved in producing and placing piles for the project
• I also took place in the safety team to apply the rules on the site
• I compared all the structural drawings and shop drawings with architectural drawings
• I located all buildings depends on the UTM local coordinate on the site
• I controled all the concrete job about alightment,elevations and details…
• I followed site utilıties jobs including mechanical and electrical lines and their as-builts datas
• I worked on site landscape, civil, architectural, final grading projects…

Ad
Ad
Ad