Seeking new challenges, which effectively utilize my professional experiences of 5 years as lead engineer in handling automation and control system engineering such as DCS/PLC/SCADA ABB, Siemens, Rockwell Allen Bradley, Mitsubishi and 6 years as supervisor in handling electrical and instrument works for constructions, commissioning and maintenance. Having experiences working in pulp and paper, steel manufacturing and oil refining industry, familiar with ARAMCO standards SAES, DCS, PLC, SCADA, instrument, electrical, compressors, automation and control system, EPC, maintenance and reliability, SAP PM, supervising electrician, instrument, machinist and field metal crafts for daily maintenance. Mostly experiences are supervising team of multi cultures, multi countries in executing construction works, pre-commissioning, walkthrough, commissioning, start-up and performance testing.

Education

North Sumatera University
Bachelor Degree in Electrical Engineering

   Aug 2000
— Jul 2006

Experience

Yanbu Aramco Sinopec Refining (YASREF) Co., Ltd.
E&I Crafts Supervisor

   Sep 2013
— Current

E&I Crafts Supervisor
02 September 2013 – Mid of June 2018 (resigned)
Responsibility :
1. Manage and oversee the day-to-day electrical and instrument preventive and corrective maintenance work to maintain electrical and instrument process equipment.
2. Manage craftsman man power and coordinate with operation to perform corrective maintenance by requested work order in case of emergency, urgent and normal case.
3. Update history of preventive and corrective maintenance completion and man power capacity through SAP Plant Maintenance to maintain good KPI accomplishment.
4. Communicate and arrange engineering or vendor support due to problem solving are related to maintenance.
5. Perform mid yearly and yearly performance appraisals for direct reports.
6. Ensure the performance of various assigned responsibilities and the conduct of the staff is in accordance with YASREF’s safety policies and procedures.
7. Provide the necessary support to the respective OME team member before/after daily meetings to ensure high level of safety performance and comply with health, safety and environmental standards.
8. Report any abnormal or malfunction tools and material to be purchased to ensure the availability and proper operation.
9. Update daily activity report that covering each discipline to maintenance unit head.
10. Report all electrical and instrument outstanding work that will be executed during planned shutdown.
11. Covering maintenance unit head job role while him on vacation or off duty.
Reliability Engineering Support Team
01 June 2017 – April 2018 (expected)
Responsibility :
1. Assigned as Support Team in Reliability Engineering Unit to proceed the Preventive Maintenance Optimization (PMO) Project.
2. Support any idea are related to maintenance plan developing as part of PMO Project.
3. Define equipment of 2300 tags those are to be included in the PMO.
4. Develop taxonomy for each tag out of 2300 tags to identify the equipment which required PM, not required PM or turnaround.
5. Review the technical documentation, P&ID and datasheets.
Maintenance Shift Coordinator
26 August 2017 – 25 September 2017
Responsibility :
1. Assigned as Shift Coordinator while covering a leave time of the Coordinator in Charge.
2. Coordinate to the related Operation Shift Supervisors to solve any issues are related to field metal, electrical and instrumentation maintenance emergency works as instructed by Refinery Shift Manager.
3. Supervise and lead the shift crews in executing any works during silent hours.
4. Coordinate to the related on-call person in charges and additional external support (man power, tools, heavy equipment, scaffolding) once they are needed.
5. Follow up any notifications to the related Operation Shift Supervisors for any works had been done and confirming it in SAP.
6. Update concerned shift report to all related persons in the end of shift time.
E&I Turnaround Execution Team Leader
10 November 2016 – 09 December 2016
Responsibility :
1. Supervise and lead electrical instrument team in executing planned turnaround job lists.
2. Supervise electrical and instrument team in assisting operation during start up covering Diesel Process Complex.
3. Manage and coordinate with planner for daily turnaround jobs to be done and provide daily reporting to complex turnaround leader.
E&I Commissioning Supervisor
02 September 2013 – 31 January 2015
Responsibility :
1. Supervise and lead electrical and instrument team in performing instrument loop checking, SAT, electrical motor solo run, pre-commissioning, commissioning and startup are related to DCS, ESD, FGS, ENMCS, VMS.
2. Supervise and lead electrical and instrument team in performing walkthrough and mechanical completion for each plant sub system and packages then update the punch items closing in MPCS system.
3. Follow up with project management team (PMT) and main contractor of any outstanding project works and punch items for Yanbu Export Refinery Project (YERP).
4. Provide electrical and instrument support during mechanical running test (MRT).
5. Update daily activity report are related to project execution to Distillate Hydro treating area commissioning leader.
6. Follow up to any related discipline of all project work to success Distillate Hydro treating commissioning and start up target.

BlueScope Steel Limited
Electrical Supervisor & Automation Engineer

   Nov 2011
— Aug 2013

Electrical Supervisor
03 November 2011 – 26 August 2013
Responsibility :
1. Supervise and lead maintenance, reliability and process control optimization of the electrical, instrument and control assets.
2. Set up work instruction for preventive maintenance activity.
3. Assist and lead troubleshooting as corrective jobs for complex problem.
4. Manage and execute compliance and corrective active request for critical equipment.
5. Develop training package and deliver to electrical personnel.
6. Set up maintenance plan as preventive jobs to complete maintenance strategy.
7. Plan shutdown job for planned or unplanned jobs.
8. Provide equipment parts and spares to reduce delay time in breakdown.
9. Lead the continuous improvement, defect elimination and root cause failure analysis regarding to instrument and control failure.
10. Provide root cause investigation report and 5Why for any breakdown and report it to operation and maintenance manager.
11. Involve and participate in process hazard and operability studies (HAZOP), incident investigation analysis methodology (ICAM), and problem solving and decision making using Kepner-Tregoe method.
Automation Engineer
03 November 2011 – 26 August 2013
Responsibility :
1. Ensure equipment and installation meet the technical specification during project.
2. Execute the approved control system modification request, provide the documents and ensure the implementation is succeed then report it to engineering manager.
4. Maintain accountability and configuration for the DCS, PLC and programmable devices Siemens PCS7/S7/WinCC and Sinamics drives.

Endress Hauser
System Engineer

   Sep 2011
— Oct 2011

1. Design instrumentation within plant engineering project including programming of PLCs (Mitsubishi) and SCADA.
2. Manage and setup automation and control equipment of designing, monitoring, commissioning, start up, performance testing and reporting to engineering manager.

Asia Pulp and Paper
Automation Engineering Supervisor

   Dec 2006
— Sep 2011

Automation & Control Engineering Supervisor
01 April 2010 – 08 September 2011
Responsibility:
1. Lead project execution, installation, jobs planning, man power distributing, completion scheduling, commissioning, start up, performance testing, and project documentation.
2. Follow up and ensure project and modification request along with E&I and operation team to be done safely and based on company rules.
3. Manage maintenance and engineering accountability control system of hardware and software for the assigned area wood yard, pulp making and pulp machine plant.
4. Provide documentation and report project execution update to automation head section.
5. Supervise day to day automation engineer team preventive and corrective works.
6. Maintain and provide detail specification of spare parts to be purchased to planner.
7. Plan turnaround job list for any malfunction hardware and software.
8. Maintain yearly KPI.
9. Set up and develop automation training and learning center to be utilized by newly engineer or testing purpose.
10. Report daily jobs, breakdown and safety issues to automation section head and plan the ahead job for engineers.
Automation & Control Engineer
14 December 2006 – 31 March 2010
Responsibility :
1. Perform installation, wiring, loop diagram updating, loop testing and loop checking before project start-up.
2. Input and upload databases are related to IO’s devices of new control system project or new modification/upgrade.
3. Do programming FBD/Ladder/STL/IT and interlocking set up based on PFD or process engineer request, upload it in the DCS/PLC controller.
4. Create process display based on P&ID then upload it to the SCADA system and train the operator how it is works.
5. Perform pre-commissioning and commissioning work along with E&I and operation team and supporting during project start-up.
6. Perform day to day automation preventive and corrective maintenance and report it to automation engineering supervisor.
7. Involve in turnaround job and project upgrading along with the vendor.
8. Reporting any abnormal finding, maintain accountability and configuration for the DCS ABB/AC450/AC800M, PLC Rockwell/SLC500/SLC5000, Siemens S5/S7 devices and archiving data and program for ABB/IT 800xA, Allen Bradley/RsLogix/RsView, Siemens/ Simatic STEP7/WinCC soft wares of the assigned area.