Lead Instrument Designer & Smart Plant Instrumentation (SPI) Administrator


Last Updated: 5th July 2018 (over 4 years ago)

Address
Indonesia

Category

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Degree

Languages
English, Indonesian

Summary

Yayan has over 22 years’ experience in oil & gas process plant design, refineries and construction industries providing instrumentation design services for many high-profile clients and multinational contractors for EPC and large basic engineering projects both onshore and offshore.

He places a strong emphasis on team development, is flexible, accurate and adaptable to the needs of his employer and clients.
His key areas of expertise include the following:
 Instrument & Control design
 Smart Plant Instrumentation design and Administratoristration
 Smart Plant P&ID design and Administratoristration
 PDMS design
 Site investigations and surveys
 Construction management
 Smart Plant Review of SP3D

Education

Krisnadwipayana University - Jakarta
BSc. Electrical Engineering

   Aug 2000
— Nov 2006

Experience

PT. Suluh Ardhi Engineering - Indonesia
Lead Instrument Designer

   May 2016
— Current

Responsible for Manage Instrument Designer team & prepare All Instrument Layout and Fire & Gas Layouts, Connection Diagram by Smart Plant Instrumentation (SPI) and Hook-up. And also check 3D work with Smart Plant Review (SPR) & SP3D.

National Engineering and Technical Company (NETCO) - Nigeria
Principal Instrument Designer & Smart Plant Instrumentation (SPI) Administrator

   Feb 2014
— Mar 2015

Responsible for Manage Instrument Designer team & prepare All Instrument Layout, Fire & Gas Layouts and Telecom Layout. Prepare & manage also for Connection Diagram & Loop Diagram by Smart Plant Instrumentation (SPI), Hook-up, Typical Drawing, Cable Schedule and All Material Take Off.

PT. AMEC Berca Indonesia
Instrument Engineer, Lead Instrument Designer & Smart Plant P&ID Administrator

   Dec 2012
— Jan 2014

Responsible prepare for Instrument datasheet On-Off Valve & Control Valve.
Responsible prepare the Instrumentation Symbol P&ID template & Administrator activity.
Responsible for Manage Instrument Designer team & prepare All Instrument Layout, Fire & Gas Layouts and Telecom Layout. Prepare & manage also for Hook-up, Typical Drawing, Cable Schedule and All Material Take Off.

PT. KBR Engineers Indonesia
Lead Instrument Designer & Smart Plant Instrumentation (SPI) Administrator

   Feb 2011
— Nov 2012

Responsible for Manage Instrument Designer team & prepare to estimating various Junction Box (JB), Cable Block Diagram, developing of JB & Cable Tray 3D model using PDMS for PCS, PSD & F&G system for onshore process area and developing the 2D drawings by PDMS extraction for Instrument Local Equipment Room (LER). And also responsible for manage all Instrument designers & check Instrument document design.

PT. AMEC Berca Indonesia
Instrument Engineer & Smart Plant Instrumentation (SPI) Administrator

   Sep 2006
— Jan 2011

Responsible for Manage & prepare As-built drawings for Instrument Index, Instrument I/O List, Instrument JB Wiring & Instrument Trouble Shooting Loop Diagram template. And also backup data for SPI database.
Responsible for Manage & prepare for Instrument Index, Instrument I/O List, Instrument JB Wiring & template of Instrument Trouble Shooting Loop Diagram. And also create new Project by SPI & Upload SPI database and also too backup data for SPI database.

PT. Inti Karya Persada Tehnik
Instrument Designer & Instrument Supervisor

   Sep 2004
— Aug 2006

Responsible for All Layout of Instrument drawing, Hook-up Drawing by Smart Plant Instrumentation (SPI), Instrument Cable Schedule & Cable Gland Schedule, MTO Instrument Cable Gland, MTO Instrument Cable, MTO Instrument Cable Tray, MTO Instrument Wiring & Acc., MTO Instrument Air Piping & Fitting, MTO Instrument Tubing, Fitting & Acc., MTO Instrument Stanchion & Support, MTO Instrument Junction Box & Work Volume.
Responsible for Supervisor of Stanchion Location, Hook-up, Wiring, Junction Box Location, Cable Way, Air Piping and Tubing, Wiring Test, Leak Test for Impulse Line, Air Supply & Air Signal, Gas Turbine Generator Package Include Waste Heat Recovery Unit Package for Unit A, B & C, & Water Treatment Package.

PT. Rekayasa Engineering
Instrument Designer

   Mar 2003
— Aug 2004

Responsible for All Instrument Layouts, Cable Schedule, Cable Drum Schedule, Loop Diagram, Connection Diagram, Termination Diagram, Hook-up, & All Material Take Off.

PT. Rekayasa Industri
Instrument Designer

   Jun 1998
— Feb 2003

Responsible for All Instrument Layouts, Cable Schedule, Cable Drum Schedule, Loop Diagram, Connection Diagram, Termination Diagram & Hook-up

PT. Total Bangun Persada
Field Engineering Civil Cad Drafter

   Aug 1997
— May 1998

Responsible for Prepare Building Layout for Cold Storage Building

PT. PP-Taisei Indonesia Construction
Field Engineering Civil Cad Drafter

   Feb 1997
— Aug 1997

Responsible for Prepare Building Layout for Wisma Building, Auditorium Building, & Diklat Building.

PT. Fast Food Indonesia
Interior and M/E Cad Draftman

   Jan 1996
— Feb 1997

Responsible for Prepare All Interior, Mechanical & Electrical Layout.

Ad
Ad
Ad