Summary

Master of Science of Civil Engineering & Building Constructions specialized in: International Development Projects Implementation, Consulting Supervision, Project Management; Contract Administration under FIDIC Conditions of Contract; Construction Supervision lead based on EN Standards; Training, supervision & guidance of Construction Supervisors, Engineer’s Resident & Site Engineers; Superintendence of the Supervision Consultants; quality control, testing and commissioning of water supplying, transmission & waste water systems, water collecting & retaining RC structures, water & wastewater Treatment Plants. Engaged on Projects worth from EUR € 12m – USD $ 1.8billion.

Serbian national, living in Austria, interested in new opportunities on international projects worldwide as well as in Austria, contract & permanent positions.

Education

European Federation of National Engineering Associations (FEANI)
Engineering Card

   Jan 2015
— Current

Engineering Card ID: SER-1500003, issued 21.01.2015 by "UETS-Serbia"

Univeristy of Nis, Faculty of Civil Engineering and Architecture, Republic of Serbia
Master of Science of Civil Engineering, Building Constructions

   Oct 1991
— Nov 2000

Master of Science of Civil Engineering (Diploma No.352).
Completed 2nd level of master academic studies with 300ECTS credits.

University of Nis, Faculty of Civil Engineering and Architecture, Republic of Serbia
Graduated Civil Engineer

   Oct 1991
— Nov 2000

Graduated Civil Engineer (Diploma Nr.468, issued 13.09.2001);
National Vocational Qualification – NVQ level 7, ISCED -7 (758)

Principal subjects/occupational skills covered:
General: Mathematics 1 & 2, English Language, National Defence, Fundamentals of Social Sciences, Technical Physics, Computer Programming

Occupational:
Descriptive Geometry 1 & 2, Technical Mechanics 1 & 2, Building Structures with Technical Drawing, Geodesy, Building Materials 1 & 2, Fundamentals of Designing, Strength of Materials, Building Structures 1 & 2, Soil Mechanics, Timer Structures and Scaffolds, Foundation Engineering, Construction Systems, Industrial Facilities Designing, Structural Statics, Theory of Surface Girders, Civil Engineering Development, Concrete Structures, Structure Stability and Dynamics, Housing Buildings Designing, Town Planning, Public Buildings Designing, Metal Structures, Public Utilities, Building Works Organization, Prefabricated Buildings, Installations Utilities in Buildings, Professional Training, Project Elaboration

Experience

CES Consulting Engineers Salzgitter
Key Expert - PM Lead Construction Supervisor

   Jun 2018
— May 2019

• Main responsibilities:
Programme Management Consulting services; Superintendence of the Supervision Consultants' performance; Contract Administration of 27 Service Consulting Contracts and 49 Works FIDIC Contracts, Project & Construction Management, Claim & Risk Management, Variation Orders management, Construction Supervision Quality Control); Physical & Financial Progress monitoring & reporting; Superintendence of the Construction Works, Quality Control, Quantity Assurance and Contractual monitoring.
• Activities and projects:
IWSP - Improved Water and Wastewater Services Programme (IWSP I) – Phase II, Egypt (TA Component BMZ no. 2006 70 356 and the Investment Component BMZ no. 2006 66 008).
Projects Details: Programme works in stated period of engagement including 15nr Phase 1 & 34nr Phase 2 Projects in 4 Nile Delta Governorates, foreseeing rehabilitation, upgrade and construction of 12 WTP, 3 WWTP, 33 WW NTW, 1 WS TM. Population served ~8mill.

Funded by 70% by the European Development Partner (EDPs: KfW, AFD, EC, EIB) and approx. 30% by the Egyptian Government (GoE), Work Contracts based on FIDIC Red-harmonized ed.2010 & Yellow Books. Total worth of Programme ~ EUR € 295m.

Egis Eau
Key Expert – Resident Engineer

   Mar 2016
— Aug 2017

• Main responsibilities:
Consulting Supervision, Project Management, Risk & Claim Management, Construction Supervision, Site Management, Design review, Review, Control of Contractor’s Invoices and Budget Control, Verification of measurement (values and method), Quality assurance, Testing & commissioning, Coordination and control over Engineer’s Inspectors in construction supervision works, Coordination of Works, preparation of Reports.
• Activities and projects:
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi - Phase III (KfW/BMZ 2011 66 719/Batumi/PH-III/C-1: Package 1, Contract 1 - Regular Works, Parts 1.A; 1.B; 1.C); (KfW/BMZ 2011 66 719/Batumi/PH-III/C-1: Contract Agreement 4.1, (Package 1, Lot 4-1)).
Consulting services and construction supervision over two separate projects (Lot 1,3,5 & Lot 4-1).
Project Details: Water-Supply component: 78km of wellfield piping, transmission mains, networks DN90 to DN800 (steel, HDPE), 1,900nr house connections, RC reservoir (Q=1,800m3) with treatment / disinfection facilities for NaOCL based treatment with min. production of 6,75L/h. Wellfield bore-holes with associated well-pumps (Q=126m3/h @ 50.4m).
Waste Water component: 60km of pumping mains, trunk collectors, city network DN200 to DN1000 (Steel, GRP, PP), 3,100nr house connections, 1,130nr manholes, 2nr RC pumping stations (Q1 = 3x360m3/h @ 12.58m; Q2 = 3x252m3/h @ 9.83m), one WW “Back Pull-Out” Pumping Station (Q3= 2x57.3l/s @ 6,4m), with integrated bar screens, el.mag. flow meters, Transformers 160kWA, 0.4/10kW, emergency el.-generators 80&100kVA, automatic control systems.

KfW, EC, Local Budget financed, based on FIDIC Red Book, ed.1999. Total worth of Project ~ EUR € 45m

Egis Eau
Key Expert – Lead Construction Supervisor

   Jun 2015
— Mar 2016

• Main responsibilities:
Superintendence of the Construction Works, Quality Control, Quantity Assurance and Contractual monitoring, Risk Management. Superintendence of the Supervision Consultants, Control over the Quality of the Construction Supervision, Physical & Financial Progress monitoring & reporting. Verification of the payment certificates of the Contractors and Supervisors and proceeding the payment; Review & approval of Variation Orders; Supervisor's Monthly Progress Reports; Training of Employer’s Engineers; Support during Defect Notification Period.
• Activities and projects:
IWSP - Improved Water and Wastewater Services Programme (IWSP I) – Phase II, Egypt (TA Component BMZ no. 2006 70 356 and the Investment Component BMZ no. 2006 66 008).
Projects Details: Programme includes 41nr Phase 1 & 140nr Phase 2 Projects in 4 Nile Delta Governorates (Gharbia, Damietta, Sharkia & Baheira), foreseeing rehabilitation, upgrade and construction of 14 WTP, 19 WWTP, 145 WW NTW, 5 WS NTW, Population served ~8mill.

Funded by 70% by the European Development Partner (EDPs: KfW, AFD, EC, EIB) and 30% by the Egyptian Government (GoE), Work Contracts based on FIDIC Red Harmonized & Yellow Books. Total worth of Programme ~ EUR € 245m.

ILF Consulting Engineers
Key Expert - FIDIC Engineer

   Apr 2012
— Jun 2014

• Main activities
and responsibilities:
Project Management and control, Claim Management, Time Program (Construction Schedule) monitoring, Construction Supervision, Site Management, Design review, Feasibility Studies for utilization of remaining Budget, Review, Control of Contractor’s Invoices and Budget Control, Verification of measurement (values and method), Quality assurance, Testing & commissioning, Coordination and control over Engineer’s Resident Engineers in construction supervision works, Coordination of Works, preparation of Reports.
• Activities and projects:
Supervision of Water Supply Systems Rehabilitation Works for 17 (21) Towns Under WIMP (EIB/WIMP/C/QCBS/03) (Georgia, former Soviet Union), engaged on 5nr Project-Cities: Lanchkhuti, Ozurgeti, Vani, Chokhatauri, Ureki.
Project Scope - Installation of Distribution PE100, PN(8-12.5) Pipeline OD(32-450mm), Steel d(76/3.5 – 325/6mm) L=74,885m with 3,291nr PE100, PN(8-10) House Connections OD(20-75mm) L=35,647m; SCADA System including Flow Measurement, Chlorine Residual Monitoring & Flow Control; Chlorine Gas & Sodium Hypochlorite Generation Equipment installation; construction of 2nr new RC Water Reservoirs (Q1=1,900m3, Q2=500m3); 2nr Water Treatment Plants (WTP1 – Chlorine Gas, Q=11.5l/s; WTP2 - Sodium Hypochlorite, Q=29l/s); rehabilitation of 1nr existing Headwork Capitation Area; construction of 1nr new Headwork Capitation Area (perforated collection pipe, steel delivery pipe & 2nr rapid gravity filters) with Automatic Pumping Station (3nr Booster Pumps 70m3/h @ 54.4m) and associated structures. Construction of 2nr new Chlorinator Buildings; rehabilitation Works to 3nr Pump Stations with installation of 8nr new Pumps (Q=165-360m3/h), electrical Works with 3nr new Power Transformers (630kVA, 400kVA, 250kVA).
EIB financed, based on FIDIC conditions of contract (FIDIC Red Book MDB 2006). Total worth of Project ~ EUR € 16.7m

ILF Consulting Engineers
Key Expert - Chief Resident Engineer

   Jul 2009
— Apr 2012

• Main activities
and responsibilities:
Project management and control, Claim Management, Time Program (Construction Schedule) monitoring, Construction Supervision, Quality assurance, Coordination of Contractors activities, Testing & commissioning; Financial control over Projects construction phase; Feasibility Studies for utilization of remaining Budget; Guidance, coordination and control over Engineer’s Site Engineers in construction supervision works.
• Activities and projects:
Rehabilitation of the Urban Water Supply and Sanitation in the Sava River Basin in Bosnia and Herzegovina, (BMZ ID 2002 65 876). Projects implemented in 4 cities in Bosnia & Herzegovina - Bihac, Kostajnica, Derventa & Kakanj.
Project Scope: Drinking water supply network, total capacity: 61,600 m³/d, total number of inhabitants: 150,000, total length (transport mains and network): 45km of pipe main (ductile, PE), 1.500nr house connections; reinforced concrete water reservoir Q=700m3, SCADA System.
Sewage system works: 2nr of pump stations, 30km of network (HDPE), 800nr of house connections
KfW Bank financed, based on FIDIC conditions of contract (Red Book + Green Book). Total worth of Project – EUR € 12m

Brown & Root NA Ltd
Lead Consulting Site Civil Engineer

   May 2007
— Jun 2009

• Main activities
and responsibilities:
Consulting & Construction supervision, Quality Assurance, Quality Control, Testing & Commissioning, Training of local civil engineering staff in supervision works. Ensuring Project execution in accordance to the Contract, Project Manual, Approved Plans, Procedures, Specifications, and Drawings.
• Activities and projects:
Great Man Made River Project, IV Phase - Ghadames Project (extraction, treatment & transport of Sahara Nubian Sandstone Aquifer System water).
The aim of the system was conveying 90 MCMY from Ghadames basin to the coastal regions of Jaffara area to meet the domestic water requirements of the growing population in the area.
The system consists of the 144nr wells (900 - 1,100m depth), 208km well field collector pipeline, 1nr (CO2) Water Treatment Plant (Q=250,000m3/d), 622km main conveyance and distribution line, 4nr pump stations (PS#1: 4+2 Pumps, 0,72m3/s/Pump @ 153mlc; PS#2: 4+2 Pumps, 0,72m3/s/Pump @ 164mlc; PS#3: 4+2 Pumps, 0,72m3/s/Pump @ 164mlc, PS#4: 2+1 Pumps, 0,11m3/s/Pump @ 177mlc) & 3nr pressure breaking tanks (3x20,000m3), 1nr elevating tank (70,000m3), 1nr flow control tank (70,000m3), 25nr turnouts, Communication and Control System, 3nr Operation and Maintenance Centers, Electrical distribution system for the well field. Pipelines used for transport of water with main diameter 1,600mm, PCCP (Pre-stressed Concrete Cylinder Pipes), Glass Reinforced, Polyethylene & Steel Pipelines.
Project executed under especially written conditions of Contract based on ICE conditions of Contract. Total worth of Ghadames - Zuwarah - Al Zawia Project is USD $ 1.8 billion.

PUC Naissus
Site Engineer / Construction Supervisor

   Jan 2002
— Jan 2005

• Main activities
and responsibilities:
Feasibility Studies; Water Supplying Systems Design; Tender documentation preparation, (Civil Works Tender and Tender for Material); Consulting and Construction Supervision; Testing, Commissioning & Taking Over Inspections;
• Activities and projects:
Program of Rehabilitation of Urban Water Supplies and Sanitation in Novi Sad, Belgrade and Nis (Phase I - BMZ ID 2001 40 475, Phase II - BMZ ID 2001 40 624
Main goals – rehabilitation of WS Network, improvement of organisational structures, feasibility studies for further investments.
Two project phases:
Phase 1 (June 2002 - November 2004, City of Nis, Serbia) - Objectives:
Plan: replacement of existing main distribution pipelines & service lines increasing the pipeline diameter and improving water supply of urban public consumers, installation of bulk flow meters on distributive magisterial pipelines. New Pipelines in 43nr Streets within 10nr City sectors in urban city areas, total length of ~ 15 km water distributive main pipeline (PE 90-160; DCI 200-400), 1.000nr service-lines (house and industrial connections). Network Sectoring with 14nr flow-meters

Phase 2 (March 2005 - October 2005, City of Nis, Serbia) - Objectives:
Reconstruction of existing pipelines, replacement of old gate valves, water meters and service lines (new pipelines in 17nr Streets in 5 sectors). Removal of existing water (mains) pipelines and service lines, new pipelines in 6nr Streets in 3nr City sectors, (PE 160, DCI 200-400) pipelines, (PE 1”-Ø110) service lines.
KfW Bank financed, Based on FIDIC conditions of contract (Red Book), total worth of project: EUR € 20m.

Antares Com
Executive marketing manager

   Oct 1998
— Mar 2000

Public Relations, Marketing, exploration and development of new markets, distribution network setting for physical medical equipment (lasers, magnets, vacuums, etc).

Kamini-Popovic
Construction Manager

   Oct 1993
— Mar 1996

• Main responsibilities:
Feasibility Studies, Design, Project & Construction Management, Supervision and Testing, available budget control. Reconstruction of individual residential buildings, development of individual holiday resorts.
• Activities and projects:
Development of local camping sites and partial regulation of Nisava River-side; thermal spring regulation & development of local thermal Spa in Sicevo gorge, South-East Serbia.