Senior Engineer - Instrumentation


Last Updated: 9th October 2017 (over 4 years ago)

Address
India

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Degree

Languages
English, Hindi

Summary

 Project Management and Coordination for FEED/EPIC projects.
 Development of design basis, System Architecture diagram, Scope of work and technical specification documents for engineering contractor, vendor and consultants. Identify/ quantify/review engineering deliverables, man-hour allocation, and format of delivery, time schedules and other requirements for execution of the work for the relevant discipline work.
 Review the engineering/design work of contractors, consultants, vendors and junior engineers to ensure that these are in accordance with the company’s project standards, procedures and business objective.
 Preparation of Technical query & Concession requisition.
 Preparation of Material Requisitions, Purchase Requisitions, Material Take Off. review & commenting vendor data and incorporation of the details in engineering deliverables and Preparation Technical bid Evaluations (TBE)
 Review of Civil / Piping General arrangement drawing, overall plot plan, equipment and piping layout, plot plan, underground services drawings, electrical cable routing, piping isometric, P&ID’s, PFD’s and process datasheets, Hazard Area Calcification.
 Third party interface’s and Packages for various subsystems including HIPPS, MOV Control system, Compressor package, Flow metering system.
 Responsible for all technical and discipline co-ordination activities related to the assigned projects from conception to handover to operations. This includes supporting cost estimation & control schedule, materials, design, compliance with company procedures & policies.
 Well conversant with International regulatory codes & standards, engineering practices including API, NFPA, ISO standards, Qatar Petroleum, Shell DEP and KNPC Standards.
 Extensively involved in onshore/offshore commissioning activities.
 Actively participated various risk management process like HAZOP, SIL studies, with client and representatives of other engineering disciplines.
 Experience in various Fire and Gas detectors including HSSD and Handled Fire and Gas mapping, zone segregation for addressable and non-addressable detector.
 Knowledge in Ethernet Communication systems, Fiber optic communication network, required for oil & gas processing plants and terminals.
 Actively participated various FAT and SAT activities for Instrumentation and control, Telecommunication systems

Experience

Consolidated Gulf Company WLL Qatar
Senior Engineer - Instrumentation

   May 2012
— Current

Handled Various Onshore & Offshore Projects as given below:
FEED Projects (Front End Engineering Design):

 FEED Study Package for Installation of Fiscal Metering Skid at Laffan Refinery-1 – Qatar Gas
 FEED for Process Analyzers and other Miscellaneous SORs & RTS in Dukhan fields – Qatar Petroleum
 FEED Study for Replacing H2S Analyser in AGE 1 & 2, Qatar Gas
 FEED for Upgrade of F&G/Smoke Detection & Monitoring System in PD Maintenance Workshop at KAHM, KAHN, FAHM, FHSP, FHGL, JALM and PW01 in Dukhan Fields – Qatar Petroleum
 ECS for Upgrade of F&G, RTU and Telecommunication System in LBV1, LBV2 at QP Dukhan and NGL 4 Mesaieed – Qatar Petroleum
 FEED for Upgrading of Treated Sewage Effluent (TSE) Network and Storage in MIC – Qatar Petroleum
EPIC Projects:

 EPIC for Upgrade of Turbine Control Systems at PS-2 & PS-3 (Offshore Platform)- Qatar Petroleum
 EPIC for Implementation of Instrumentation PCRs at Halul, PS-2 & PS-3 (Offshore Platform) – Qatar Petroleum
 EPIC for Replacement of Ethane Gas Chromatograph at Gas Distribution Station A-21, Gas Operations, Ras Laffan – Qatar Petroleum
 EPIC for Conversion of Flow Computer for Fiscal Metering of Naphtha Terminal Operations – Mesaieed – Qatar Petroleum
 EPIC for Continuous Emission Monitoring System at QP Refinery Mesaieed – Qatar Petroleum
 EPIC for Upgrade of Instrument Air Compressor at Gas Distribution Station-W1, Gas Operations – Qatar Petroleum
 EPIC for Integration of Stand Alone Instruments and FIS with Waternet SCADA within Dukhan Fields – Qatar Petroleum
 EPIC for MPGs FT-110, F&G Detection, Vibration Systems Upgrade at North Field Alfa (Offshore Platform – PS-4) – Qatar Petroleum
 EPIC for Online Condition Monitoring System for Rotating Equipments at North Field Alfa (Offshore Platform – PS-4) – Qatar Petroleum
 EPIC for New Desalination Plant and Potable Water Storage Tank at Halul Island (Offshore Platform) – Qatar Petroleum

Gulf Spic Contracting Company WLL - Kuwait
Instrumentation Engineer

   Jun 2007
— Feb 2012

 Responsible include leading a team of engineers preparing schedule and resource planning, co-ordinate with the Client / Project and the team members including other engineering disciplines, production team, construction team, pre-commissioning & commissioning team from execution of project until project completion.
 Responsibilities include identifying Design conflicts, raising technical queries, ensuring the deliverables meet project
 Review various vendor’s documentation and drawings including PLC, DCS, ESD, F&G and VMS provide all necessary comments in order to meet the scope of the project.
 Review of all Instrument Loop Diagram, Cable Block diagram, Cable schedule and Junction box wiring diagram, Interconnection Wiring Diagram
 Responsible for carrying out SAT activities at site.
 Support Construction and Commissioning department throughout the project execution phase.
 Strong coordination with end user for all technical and construction issues.
 Responsible for As-built Engineering deliverables

Ad
Ad
Ad