CURRICULAM VITAE
VISHNU U GOPAL
Mob No: +919567562944
E-Mail: vishnu.ug@gmail.com

CAREER OBJECTIVE:

To obtain a position as an electrical engineer in a reputable organization where I can further enhance my technical skills, abilities and experience to ensure the company's success and offers professional growth.

EDUCATIONAL QUALIFICATION:

• B.E in Electrical & Electronics Engineering from National College of Engineering, Anna University, Tamil Nadu, India (2003-2007).
• Professional in Electrical CADD certification from CADD Centre, Kerala, India.

SOFTWARE & COMPUTER PROFICIENCY:
AutoCAD, MS Office (Word, Excel, PowerPoint)

SUMMARY OF EXPERIENCE: (9+ years’ experience as Electrical Engineer in EPC and EMC Projects).

• Installation of H.V & L.V Electrical systems, Transformers, DG, Power cables, switchgears and electrical panels.
• Construction, Installation, Operation and Maintenance of 132kV/33kV/113.8kV GIS and other indoor/outdoor substation works.
• Assignments were including of overall construction activities, planning, monitoring, reporting, coordination with clients & management.
• Preparation of the As-built drawings, load schedules.
• Electrical Designing of substations, industrial and commercial projects.
• Expert in computer/office works as well as conversant in site works.
• National Gird Approved Electrical Engineer
• RC approved Electrical Engineer

PROFESSIONAL EXPERIENCE:

Company : HADI HIDER COMPANY (KSA)
PERIOD : JUNE 2016 to Till Date
Client : Royal Commission & National Gird (SA)
Designation : Electrical Engineer (Senior Engineer)

TYPE OF JOB:
Project 1:

Project is to install five (5) 115/13.8 kV Transformers, 13.8kV Capacitor Banks, five (5) , 115kV GIS of fourteen (14) bays in "double bus single breaker" configuration and 13.8kV switchgears of eighty nine (89) bays at MARDUMHA 20BD 115/13.8kV substation in JUBAIL( RC ) area.

RESPONSIBILITIES:
Site in charge for overall construction activities, planning, monitoring, reporting & coordination with clients & management.
• Construction and installation of the 115kV/ 13.8kV GIS.
• Preparation of method of statement for all Electrical construction work
• Reviewing all Electrical drawing and coordinates with Civil and Mechanical Team.
• Review all vendor drawing (GIS, Switchgear ,Control panels ,Protection panels, DC system DCDB and ACDC) and coordinate with Designer and Clint .
• Closely monitor Implementation of the electrical design of projects including (Lighting, Power, Substation building, Switch Yard & Process Plant, HV/LV Switchgears and Panels) at site coordinate with site Engineer and Q/A Q/C.
• Verification of the electrical SLDs, As-built drawings and load schedules.
• Supervise all the control cable routing and termination and coordinate with testing team for pre check and full testing of overall system up to the commissioning
• Laying and Termination of HV/LV cable and grounding system.
• Cable routes, cable tray layouts and cable trench layouts as per site.
• Manpower analyzing as per site requirement and manpower allocation.
• Review the electrical material of projects to match the project specifications.
• Preparation & timely execution of Major Shut Down work in Process Facilities & 115/13.8kV
• Substation To ensure that all the works are being carried out as per SOW and PTS.(SOW-Scope of Work)
• Inspects electrical installations to verify conformance with safety laws and ordinances

PROFESSIONAL EXPERIENCE:

Company : AL- MASHARIQ COMPANY (KSA)
PERIOD : APRIL2014 to APRIL 2016
Client : National Gird (SA)
Designation : Electrical Engineer (Site Engineer)

TYPE OF JOB:
Project 1:

Project is to install three (3) 132/13.8 kV Transformers, two (2) 132/33kV Transformers, three (3) 13.8kV Capacitor Banks, four (4) 33KV Capacitor Banks, 132kV GIS of fourteen (14) bays in "double bus single breaker" configuration, 33kV switchgears of twenty three (23) bays and 13.8kV switchgears of forty four (44) bays at MOKHTARAH 132/33/13.8kV substation in the JIZAN area.

RESPONSIBILITIES:
Site in charge for overall Electrical construction activities, planning, monitoring, reporting & coordination with Electrical Q/C Senior Electrical Engineer, construction Manager, Project Manager and Management.
• Construction and installation of the 132kV/ 33kV/ 13.8kV GIS.
• Installation of the electrical lighting, power layouts and DBs.
• Supervise the electrical works executing in the site to be as per Electrical Q/C, Senior Electrical Engineer, and Design and to match the client requirements.
• Implement the electrical design of projects including (Lighting, Power, Substation building, Switch Yard & Process Plant, HV/LV Switchgears and Panels) at site.
• Supervise Erection of Transformer, DG set, cable, circuit breakers etc.
• Supervise Laying and Termination of HV/LV cable and grounding system.
• Supervise Cable routes, cable tray layouts and cable trench layouts as per site.
• Manpower analyzing as per site requirement and Request for manpower allocation.
• Review the electrical material of projects to match the project specifications.
• Preparation & timely execution of Major Shut Down work in Process Facilities & 33/13.8kV
• Substation To ensure that all the works are being carried out as per SOW and PTS.(SOW-Scope of Work)
• Inspects electrical installations to verify conformance with safety laws and ordinances

Company : Powertech Engineering L.L.C, Muscat, Oman
PERIOD : JULY 2010 to JAN 2014
Client : Petroleum Development Oman (PDO)
Designation : Electrical Engineer (Site in Charge)

TYPE OF JOB:

Project 1:
Marmull Central Power Station 132/33/11 KV Substation
•132 kV Sub Station with Four (4) 60 MVA 132/33 kV ,Four (4) 40 MVA 33/11kV Power Transformers, Twenty four (24) Double Transfer Bus 132 kV Bays, Fifty Six (56) 11 kV bays with ABB SF6 Circuit Breakers and connected Electrical equipment’s Control & protection systems.

RESPONSIBILITIES:
Site in charge for overall construction activities, planning, monitoring, reporting & coordination with clients & management.
• Construction and installation of the 132kV/ 33kV/ 11kV GIS.
• Installation of the electrical lighting, power layouts and DBs.
• Supervise the electrical works executing in the site to be as per the design and to match the client requirements.
• Implement the electrical design of projects including (Lighting, Power, Substation building, Switch Yard & Process Plant, HV/LV Switchgears and Panels) at site.
• Verification of the electrical SLDs, As-built drawings and load schedules.
• Erection of Transformer, DG set, cable, circuit breakers etc.
• Laying and Termination of HV/LV cable and earthing system.
• Cable routes, cable tray layouts and cable trench layouts as per site.
• Manpower analyzing as per site requirement and manpower allocation.
• Review the electrical material of projects to match the project specifications.
• Preparation & timely execution of Major Shut Down work in Process Facilities & 33/11kV Sub station
• Inspects electrical installations to verify conformance with safety laws and ordinances

Project # 2
Reinforcement of 132/11 KV S/S, SOHAR South and Its Distribution that includes Installation of LT transformers, RMUs, Feeder pillars etc

• Three (3) 50/67 MVA, ONAN/ONAF (OA/FA), Dyn1, 132/11kV, 3-phase, 60 Hz, 22% impedance @ 50 MVA base, oil immersed power transformers with +10% to -20% OLTC, with 132kV bushing CTs(for metering) and three (NER) neutral grounding (800A/10Ώ) complete with RTCC cabinets, all accessories. The transformers have bushing type, 2-core CT (one core with single ratio and the other core with multi-ratio) mounted at 13.8kV neutral
• Six (6) outdoor station class arresters rating 120 kV for D/C- T/L
• 132 kV, indoor, (GIS), 2000A, 1Sec, 40KA, switching devices and other associated electrical equipment, consisting of the following:
1. Eight (8)-132kV, 2000A, 1 sec, 40kA, peak withstand current 2.6 times short circuit rating (104KA), 3-phase, 60 Hz, indoor, SF6 circuit breakers.
2. Twenty three (23) 132 kV, 2000A, 1sec, 40kA, l04kA peak momentary current, 3-pole, 60 Hz, disconnect and grounding switches.
3. Eighteen (18) 132 kV, 1-phase voltage transformers (VT) for two (2) lines & four (4) buses.
4. 132 kV, 2000/1A current transformer with multi-ratio taps (MRCT), Five (5) cores minimum for each C.B.
• Three (3) 13.8kV, 7MVAR shunt capacitor banks with 2 mH series detuning reactor. Each capacitor bank designed to attain a "net" value of 7MVAR@ 1.0 p.u. at the 13.8kV bus.
1. Detuning Reactors
Installation of nine (9) numbers air cored detuning reactors of 2mH, three (3) for each capacitor bank, complete in all respects and installed in naturally ventilated.
2. Capacitor units
• Installation of rack mounted, capacitor units in 3x13.8kV banks, each bank of 7Mvar capacity at 13.8kV, arranged in Y-Y arrangement with ungrounded neutral, with free standing neutral CT
• 11kV, 25kA, 1sec, peak withstand current 2.6 times short circuit rating (65KA), indoor switchgear with SF6 or vacuum circuit breakers with ABTS consisting of the following:
1. Three (3) 3600A breaker cubicles for incoming circuits from power transformers T1, T2 and T3, with nine (9) single phase 11kV PTs for three (3) 11kV incomers.
2. Thirty four (34) 630A breaker cubicles for outgoing feeder circuits.
3. Two (2) 630A breaker cubicles for station service transformers.
4. Two (2) 3600A breaker cubicles for bus tie circuit breaker.
5. Three (3) 630A breaker cubicles for capacitor banks
• Two (2) 500kVA, 11kV/220-127V ONAN, Dyn11 station service transformers with all accessories.
• Termination of 11 KV, 25KA, 1 sec XLPE cable (5x1cx630sqmm/phase) between Power Transformer & 11 KV Switchgear.
• Termination of 132 KV, 40 KA, 1 sec XLPE cable (1cx630sqmm/phase) between Power Transformer and GIS.
• 220/127V AC power system with auto transfer scheme.
• 125/48V DC auxiliary power system with the fol6lowing:

1. One (1) set of Battery Bank 600AH (minimum) on 8-hour basis for125V.
2. Two (2) units of chargers with 100A (minimum) rating for125V.
3. One (1) set of Battery Bank with capacity of 250AH for 48V DC system.
4. Two (2) chargers with 50A rating (for 48V).
DC distribution panel boards (125-48V) complete with breaker

RESPONSIBILITIES:

• Three weekly site activities schedule program shall be prepared with the APPROVED PROJECT SCHEDULE PROGRAM and try to follow up and achieve the Target of the project.
• To arrange proper Manpower and Materials at site in time.
• To co-ordinate with PE and PM to arrange all approved IFC drawings and documents at site timely.
• To arrange and issue RFI for materials and equipment delivered at site and RFI issued for each site activity of the project.
• To prepare daily, weekly and monthly progress report and submit before PE/PM.
• To conduct weekly progress review meeting with all Engineers & Supervisors to evaluate the progress of work and to maintain good support to all Engineers (Civil, Mechanical) to carry out their work to achieve the progress in time and reported before PE / PM promptly.(such as shortage of unskilled, semi- skilled, skilled workers, shortage of Materials, Tools and Equipment etc)
• To conduct weekly progress review meeting with Client / Consultant to analyze the progress of work, if necessary.
• To attend the Bi-weekly progress review meeting with Client / Consultant at site office to resolve the pending issues if any and expedite the progress of work as per the directions issued by Client.
• If Site Instruction received from Client / Consultant, ensure proper action to rectify the defects/suggestion in short period.
• To follow up with all approved Subcontractors (If work awarded) to complete the project in time.
• If there is any delay, difficulties and critical problem arrived at site, the same shall be informed to PM for settling the issues.
• All facilities shall be arranged for contractor’s Testing Team and Client’s for Testing and Commissioning of the project.
• All Punch List received from the Consultant/Client shall be promptly/timely attended and nullified.
• All approved IFC drawings and Marked-up drawings finally will be sorted out according to category wise (Civil, Electrical, Mechanical, SCADA and Communication etc) and submitted along with STR and FTR before PM for making As-Built drawing. (STR-Site Test Results, FTR-Factory Test Results)
• Beware of Safety and Security of Staff, Materials, Vehicles and Equipment.
• Finally arrange demobilization on completion of the PROJECT.
.

COMPANY: QUILON CONSULTANCY SERVICES (Kollam, Kerala)
PERIOD: MAY 2007 to MAY 2010
JOB TITLE: SITE ENGINEER

TYPE OF JOB:
Project # 1

Construction of 220/110KV Pothencode S/S (Thiruvananthapuram)
• 220 kV Sub Station with Two (2) 40 MVA 220/110 kV ,Two (2) 20 MVA 110/11kV Power Transformers, Twelve (12) Double Transfer Bus 220 kV Bays, Twenty eight(28) 110 kV bays with ABB outdoor SF6 Circuit Breakers and connected Electrical equipments ( Pantographs Isolators, CT CVT Lighting arrestors communication equipments etc), Control & protection systems.

Project # 2
Construction of 110 K.V SUBSTATION CSEZ (Kakkanadu, Kochi)
• 110 KV Substation with (3) 20 MVA 110/11 KV Power Transformers,15 outgoing 11KV feeders with Control and Protection Relays and all other connected equipment accessories.

RESPONSIBILITIES:

• Installation of all electrical equipments and monitor project quality and progress compliance with IEC Standards for the following.
• Formation of main earth mate (mesh grounding), safety and system grounding.
• Erection of Power Transformers, Circuit breakers, CVTs, CTs, Post insulators, Lightning Arrester,SF6 HBCBs, Disconnecting switches, Earth switches, Gantries, equipment structures and torque tightening.
• Erection of earthing transformers, OIL/AIR bushing.
• Erection and Installation of LV SWGR’s (Vaccum/SF6).
• HV and LV power cable pulling, laying, glanding, and terminations.
• Substation Building shielding system.
• AC/DC auxiliary power supply system, auxiliary transformers, protection panels, local control panels installation and termination,
• Indoor ac/dc lighting ,Outdoor yard lighting, security fence lighting, lighting pole mounting, concealed and exposed wirings,
• Installation of 125Volt and 48 volt. Battery bank and Battery charger including cable termination.

TRAININGS UNDERGONE:

• H2S Awareness and Escape.
• HSE Induction Course.
• Initial Fire Response (IFR).
• Job Hazard Analysis (JHA).
• Safety Leadership Skills for Supervisors (SLS).
• HSE Tools and Skills.
• Coaching Monitoring and Competency Assessment (CMC).
• Registered in Saudi Engineering Council Associate Engineer

PERSONAL DETAILS:

Father’s Name : P.N Venugopal

Date of Birth : 01.06.1983

Sex & Marital Status : Male, Single

Nationality : Indian

Languages Known : English, Hindi and Malayalam (Read, Write and Speak)

Driving License : Oman, Saudi Arabia and India

Passport Number : N9881961

Availability : Immediately
Permanent Address : Archana Pattathanam, VNR-58, Kollam,
Kerala, INDIA, PIN – 691021,
Mob: +919567562944

DECLARATION:

I hereby declare that the information given above is true to the best of my knowledge and belief.
VISHNU U GOPAL

Ad
Ad
Ad