Sr. Electrical Engineer


Last Updated: 28th August 2018 (over 4 years ago)

Address
India

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Degree

Languages
English, Hindi

Summary

I have more than 20 Years of international experience (out of which 14 years in EPC projects including Infrastructure, oil & gas etc) in electro-mechanical engineering execution including supervision of installation, inspection & testing, and commissioning as well as Quality Assurance activities and liaison with design consultants, contractors, third parties and regulatory authorities to ensure that the Topsides Modules & Utility skids installations meet client, company and authority requirements.

My Experience below.

• Singapore & Ghana Experience - 7 Years - Oil & Gas Construction
• UAE Exp - 8 Years (Drake & Scull Int, Thermo & WSP) - Power / Oil & Gas / Infrastructure Construction.
• Indian Exp - Around 7 Years.
Nature of Experience:
• PMT: 12 Years (Modec Intl., Bumiarmada Singapore, WSP ME.
• Contracting (EPC) & Others:8 Years.

Education

BMC International College, Singapore / University of Hertfordshire
BE in Electrical & Electronic Engineering

   Apr 2013
— Aug 2015

S A Raja Ploytechnics / Board of Technical Education, Govt of Tamilnadu
Diploma in Electronics & Communication

   May 1991
— Aug 1994

Experience

Modec Intl (Ghana)
Project Engineer

   Mar 2017
— Jun 2018

 Fully responsible for the Fabrication & Loadout of the Electrical modules.
 Planning & Organising the day to day activities to achieve the targets
 Implement, maintain & monitor the Company HSC / QC policy in the project.
 Coordinate the Engineering related issues with Design Consultant and the Contractor.
 Monitor the work progress and report to the Top Management.
 Coordinate the Inspections, FATs etc in coordination with Company QA / Commissioning Team and the Vendors
 Coordinate the load out / handover activities.

Bumi Armada, Singapore
Lead Engineer & Instrumentation Engineer

   Mar 2012
— Oct 2016

  Lead the site electrical construction team / EPC contractor for the timely delivery of the FPSO.
 Plan and Organise the construction activities for the topside’s modules & skids of FPSO including CSU, Water Injection, Utility, Power Generation & E House / Substation Modules.
 Implement & Monitor the Company HSC / QC policy in the project.
 Coordinate the procurement activities for the timely completion of the modules.
 Coordinate the Engineering related issues with Design Consultant and the Contractor.
 Responding to the Technical Quires submitted by the Contractor.
 Monitor the work progress and report to the Top Management.
 Coordinate the Inspections, FATs etc in coordination with Company QA / Commissioning Team and the Vendors.

WSP Middle East
Sr. Electrical Engineer

   Apr 2007
— Feb 2012

Management responsibilities:
 Fully responsible for the Electrical Works (HV /,LV & ELV) undertaken by the MEP Contractors at Site.

Duties & Responsibility:
 Subcontractor Audits as per Project / Client requirements.
 Supervise the Contractors at site and monitor the site progress.
 Review and approval of Shop Drawings and other technical documents like Method Statements, Material Submittal etc.
 Review, Witness and Accept the HV, LV & ELV Equipment & Systems at Factory - FAT
 Solve the site technical issues by coordinating the design team and contractors.
 Supervise, approve and enhance the quality of work at site. (Installation & Commissioning)

Drake & Scull Intl. Abudhabi & Thermo LLC Dubai
Electrical Engineer QC

   May 2003
— Mar 2007

 Preparation of Material Submittals, Method statement, Inspection and Test Procedure (ITP) & other Quality Operated Documents as per the project requirements.
 Review of shop drawings in conjunction with design, project specification and local and international regulations
 Review sub contractor’s Quality Operated Documents.
 Supervise the Installation Testing and Commissioning activities of MEP Systems including HVAC.
 Coordinating the Site activities with Client, Consultant, Sub Contractor and our Design Dept.
 Maintain ISO 9000 System

Different Companies
Engineer

   Apr 1994
— May 2003

Worked with different Companies with Different Positions

Search Jobs by Industry

Ad
Ad
Ad