11+ years experience in EPC Mechanical Design Engineer in Simple & Combined cycle Power Plant


Last Updated: 1st February 2018 (over 4 years ago)

Address
Saudi Arabia

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
25 to 34

Qualification Level
Degree

Languages
English, Hindi

Summary

I am a Mechanical Engineer with 11+ Years of Experience in EPC Based Mechanical Engineering design in Simple & Combined Cycle power plant. Please find attached my updated resume and given below my current job details.

Name : Vijayasekar Sugumaran
Age : 32
Qualification : B.E. Mechanical Engineering
Current company : M/s. National Contracting Company Ltd (NCC)
Job location : Al Khobar, Kingdom of Saudi Arabia
Designation : Senior Engineer
Total Experience : 11 years + 9 months
Job title : Mechanical Design Engineering in Simple & Combined cycle power plant design (EPC)
Nationality : Indian
Marital Status : Married and having 1 kid.
Skype ID : vijayasekar123

Education

RVS COLLEGE OF ENGINEERING AND TECHNOLOGY, ANNA UNIVERSITY, CHENNAI, INDIA
B.E. MECHANICAL ENGINEERING

   Jul 2002
— May 2006

Experience

M/s. NATIONAL CONTRACTING COMPANY LIMITED
SENIOR ENGINEER

   May 2015
— Current

• Evaluation of tender documents, preparation of technical deviation/clarification and attending pre-bid & post bid customer meeting with Client/Consultant for technical resolution
• Preparing cost comparison & pricing sheet for supply and sub contractor bought out items
• Execution of project as per the contractual agreement,
• Preparation of overall power plant layout & TG hall layout based on Client Contract requirements
• Preparation of General Arrangement Drawings of Power Plant equipments & tanks,
• Preparation of design basis report for power plant equipments, System descriptions of major systems
• Preparing pipe line Sizing calculations for steam and water piping
• Preparing Pressure drop calculation for Steam piping
• Attending Customer / Consultant meeting for technical discussions.
• Coordination with inter departments for interference and completeness of the system.
• Preparation of Civil input drawings, wetting the civil drawings and coordination with civil department for completing the project.
• Preparation of Water balance drawings,
• Preparation of P & ID’s for HP Steam system with bleed lines, LP Steam system, Feed Water system, Condensate system, Extraction Steam system, Closed Cooling water system, CPH Drain System, Steam drain system, Waste water system, PRDS system (Deaerator pegging, Ejector & gland Sealing and Dumping system), Water system (Intake water, Raw Water, DM water, Boiler Initial filling water, Potable Water and Service Water), Sanitary system, Bulk Gas system and Instrument & Conveying / Service air compressor system. Review of above drawings / documents prepared by Engineering Consultant in present company.
• Preparation of Technical specification for Power plant equipment’s (like HRSG, Gas Turbine, Turbo – Generator with its auxiliaries, Fuel Gas Treatment System, Water Treatment plant, Coal handling system, Bagasse Handling system, Submerged ash handling system, Air Cooled condenser, Dense phase ash handling system, EOT Crane, Cooling tower, Closed Cooling Water system, Air Compressors, Pumps, Air Conditioning system, Pressurization & Ventilation system, Fire Fighting system, Online Side Stream filter, Gas Chlorination system, Bulk Gas system, Pipe specialties, Valves (Manual, Motorised, Relief, Safety and Control valves), Strainer, Sight Flow Indicators, Metallic and Rubber Expansion joint, Orifice Plate Assembly and etc.
• Technical evaluation of technical offers received from vendor, interaction with vendor, review of contractual and vendor drawings, giving comments / Approval on vendor documents / Drawings.
• Preparation of Steam composite pipe routing from Boiler Main steam stop valve (MSSV) to turbine inlet, turbine bleed piping to HP heater, Deaerator and LP heater with it’s drain, Feed Water Piping, Condensate System piping, Condensate Preheater Drain piping, LP Steam Piping, Steam drain piping, STG Drain & Vent system piping, Equipment drain and vent piping, Closed Cooling Water System piping, Potable Water piping, Service Water Piping, DM water System Piping, Waste Water system piping
• Preparation of Composite routing and detailed engineering of Non IBR Cooling water system piping.
• Preparing & Review of Isometric drawing for pipe spool fabrication based on piping layout drawings
• Preparing & Ordering of Bill of Materials (BOM) for pipes and Fittings as per Piping Isometric drawings
• Co-ordination with Site team for Mechanical / Piping related queries
• Co-ordination with Sub contractor for Mechanical / Piping related queries during Manufacturing / fabrication / erection activities.
• Preparing Hydrotest circuit for major piping systems
• Preparing Steam Blowing scheme for HP & LP Piping system
• Reviewing the fabrication drawings for all the Mechanical bought out items and reviewing the interference and completeness of the project.

Ms/ .ISGEC HEAVY ENGINEERING LIMITED
ASSISTANT MANAGER

   Jan 2010
— Apr 2015

• Evaluation of tender documents, preparation of technical deviation/clarification and attending pre-bid & post bid customer meeting with Client/Consultant for technical resolution
• Preparing cost comparison & pricing sheet for supply and sub contractor bought out items
• Execution of project as per the contractual agreement,
• Preparation of overall power plant layout & TG hall layout based on Client Contract requirements
• Preparation of General Arrangement Drawings of Power Plant equipments & tanks,
• Preparation of design basis report for power plant equipments, System descriptions of major systems
• Preparing pipe line Sizing calculations for steam and water piping
• Preparing Pressure drop calculation for Steam piping
• Attending Customer / Consultant meeting for technical discussions.
• Coordination with inter departments for interference and completeness of the system.
• Preparation of Civil input drawings, wetting the civil drawings and coordination with civil department for completing the project.
• Preparation of Water balance drawings,
• Preparation of P & ID’s for HP Steam system with bleed lines, LP Steam system, Feed Water system, Condensate system, Extraction Steam system, Closed Cooling water system, CPH Drain System, Steam drain system, Waste water system, PRDS system (Deaerator pegging, Ejector & gland Sealing and Dumping system), Water system (Intake water, Raw Water, DM water, Boiler Initial filling water, Potable Water and Service Water), Sanitary system, Bulk Gas system and Instrument & Conveying / Service air compressor system. Review of above drawings / documents prepared by Engineering Consultant in present company.
• Preparation of Technical specification for Power plant equipment’s (like HRSG, Gas Turbine, Turbo – Generator with its auxiliaries, Fuel Gas Treatment System, Water Treatment plant, Coal handling system, Bagasse Handling system, Submerged ash handling system, Air Cooled condenser, Dense phase ash handling system, EOT Crane, Cooling tower, Closed Cooling Water system, Air Compressors, Pumps, Air Conditioning system, Pressurization & Ventilation system, Fire Fighting system, Online Side Stream filter, Gas Chlorination system, Bulk Gas system, Pipe specialties, Valves (Manual, Motorised, Relief, Safety and Control valves), Strainer, Sight Flow Indicators, Metallic and Rubber Expansion joint, Orifice Plate Assembly and etc.
• Technical evaluation of technical offers received from vendor, interaction with vendor, review of contractual and vendor drawings, giving comments / Approval on vendor documents / Drawings.
• Preparation of Steam composite pipe routing from Boiler Main steam stop valve (MSSV) to turbine inlet, turbine bleed piping to HP heater, Deaerator and LP heater with it’s drain, Feed Water Piping, Condensate System piping, Condensate Preheater Drain piping, LP Steam Piping, Steam drain piping, STG Drain & Vent system piping, Equipment drain and vent piping, Closed Cooling Water System piping, Potable Water piping, Service Water Piping, DM water System Piping, Waste Water system piping
• Preparation of Composite routing and detailed engineering of Non IBR Cooling water system piping.
• Preparing & Review of Isometric drawing for pipe spool fabrication based on piping layout drawings
• Preparing & Ordering of Bill of Materials (BOM) for pipes and Fittings as per Piping Isometric drawings
• Co-ordination with Site team for Mechanical / Piping related queries
• Co-ordination with Sub contractor for Mechanical / Piping related queries during Manufacturing / fabrication / erection activities.
• Preparing Hydrotest circuit for major piping systems
• Preparing Steam Blowing scheme for HP & LP Piping system
• Reviewing the fabrication drawings for all the Mechanical bought out items and reviewing the interference and completeness of the project.

M/s. CETHAR LIMITED
SENIOR EXECUTIVE

   Apr 2007
— Jan 2010

• Evaluation of tender documents, preparation of technical deviation/clarification and attending pre-bid & post bid customer meeting with Client/Consultant for technical resolution
• Preparing cost comparison & pricing sheet for supply and sub contractor bought out items
• Execution of project as per the contractual agreement,
• Preparation of overall power plant layout & TG hall layout based on Client Contract requirements
• Preparation of General Arrangement Drawings of Power Plant equipments & tanks,
• Preparation of design basis report for power plant equipments, System descriptions of major systems
• Preparing pipe line Sizing calculations for steam and water piping
• Preparing Pressure drop calculation for Steam piping
• Attending Customer / Consultant meeting for technical discussions.
• Coordination with inter departments for interference and completeness of the system.
• Preparation of Civil input drawings, wetting the civil drawings and coordination with civil department for completing the project.
• Preparation of Water balance drawings,
• Preparation of P & ID’s for HP Steam system with bleed lines, LP Steam system, Feed Water system, Condensate system, Extraction Steam system, Closed Cooling water system, CPH Drain System, Steam drain system, Waste water system, PRDS system (Deaerator pegging, Ejector & gland Sealing and Dumping system), Water system (Intake water, Raw Water, DM water, Boiler Initial filling water, Potable Water and Service Water), Sanitary system, Bulk Gas system and Instrument & Conveying / Service air compressor system. Review of above drawings / documents prepared by Engineering Consultant in present company.
• Preparation of Technical specification for Power plant equipment’s (like HRSG, Gas Turbine, Turbo – Generator with its auxiliaries, Fuel Gas Treatment System, Water Treatment plant, Coal handling system, Bagasse Handling system, Submerged ash handling system, Air Cooled condenser, Dense phase ash handling system, EOT Crane, Cooling tower, Closed Cooling Water system, Air Compressors, Pumps, Air Conditioning system, Pressurization & Ventilation system, Fire Fighting system, Online Side Stream filter, Gas Chlorination system, Bulk Gas system, Pipe specialties, Valves (Manual, Motorised, Relief, Safety and Control valves), Strainer, Sight Flow Indicators, Metallic and Rubber Expansion joint, Orifice Plate Assembly and etc.
• Technical evaluation of technical offers received from vendor, interaction with vendor, review of contractual and vendor drawings, giving comments / Approval on vendor documents / Drawings.
• Preparation of Steam composite pipe routing from Boiler Main steam stop valve (MSSV) to turbine inlet, turbine bleed piping to HP heater, Deaerator and LP heater with it’s drain, Feed Water Piping, Condensate System piping, Condensate Preheater Drain piping, LP Steam Piping, Steam drain piping, STG Drain & Vent system piping, Equipment drain and vent piping, Closed Cooling Water System piping, Potable Water piping, Service Water Piping, DM water System Piping, Waste Water system piping
• Preparation of Composite routing and detailed engineering of Non IBR Cooling water system piping.
• Preparing & Review of Isometric drawing for pipe spool fabrication based on piping layout drawings
• Preparing & Ordering of Bill of Materials (BOM) for pipes and Fittings as per Piping Isometric drawings
• Co-ordination with Site team for Mechanical / Piping related queries
• Co-ordination with Sub contractor for Mechanical / Piping related queries during Manufacturing / fabrication / erection activities.
• Preparing Hydrotest circuit for major piping systems
• Preparing Steam Blowing scheme for HP & LP Piping system
• Reviewing the fabrication drawings for all the Mechanical bought out items and reviewing the interference and completeness of the project.

M/s. YURVITECH HEAVY INDUSTRIES LIMITED
GRADUATE ENGINEER TRAINEE

   May 2006
— Mar 2007

Ad
Ad
Ad