Summary

To
The HR Manager

Objective: Application for Planning Engineer.

I am looking to expand my experience in multinational company. I have done BSC in Electrical Engineering and MSC in Engineering Project Management form Middlesex University London, UK. I have got nearly five years experience in the field of construction. I have worked as main contractor with companies like ARAMCO, Saudi Oger and STC,BACS,FAST,

• STC- Data Center Project Riyadh (2012-15) - Construction of Data Center including Civil, Architectural, Mechanical & Electrical Work.
Contract Amount Phase 1 & 2: 270 Million SR
Duration: 3 Years Project.
Classification Tier 3 Data Center (99.982%)
Dual Main Power Feed including Redundant or Backup Power Supplies.
Generators, Transformers, ATS’s, Sync Panels, Batteries (15 min Backup time.)

• Saudi Aramco Projects: (2013- 2015)

1) King Abdullah Petroleum Studies & Research Center Projects Department,
Adhiyafah Hall- Civil & Electro Mechanical Works

2) Shaybah NGL Projects Saudi Aramco - Electro Mechanical Works

• TAV Construction: (2015-2017)

Aircraft Maintenance Hangers Project, Jeddah.
Electro Mechanical Work includes Power, Lighting, low Current work, LV & MV Cable Work, Installation of LV & MV Equipments and Panels, Duct Work, Plumbing & Pipe Works, Installation of Electrical & Mechanical Equipments etc.

• Riyadh Metro Projects-RMP : (2017-Present)

CJV/Samsung: MEP work for Line 4 - Stations 4G1 & 4C2 and Tunnels 4.1 & 4.2.’

Electro Mechanical Work includes Power, Lighting, low Current work, LV & MV Cable Work, Installation of LV & MV Equipments and Panels, HVAC Work, Plumbing & Pipe Works, Installation of Electrical & Mechanical Equipments etc.

BACS: (2017-Present) MEP Planning Engineer for 1B3 Deep Under Ground Station (Olaya Station), 2A3 & 2B1 Surface Stations

I have got good technical grasp in Electrical Field .I have got experience in making schedules, updating and monitoring them for Civil and Electromechanical work. I believe in improving myself by attending workshops and different certifications.
I see to complement my qualifications and work experience with a placement in a challenging and professional environment to enhance my credibility as an individual who has strived hard to achieve the best for his professional development. I believe that my motivation and desire to excel will make me an asset for your Company and will help me enhance my professional skills to a whole new level.

I look forward to a positive reply from your kind self. Thank you very much for your time and consideration.
Thanks
With regards
Engr Umair Mushtaq
Contact no: 0508210848

Education

TEN SIX Consulting
Primavera Professional Certification

   Aug 2015
— Mar 2016

• The Chartered Institution of Building Services Engineers (CIBSE)
Low Voltage Distribution Certification

   Jul 2014
— Jun 2016

Middlesex University Hendon Campus London United Kingdom
MSC Engineering Project Management

   Jul 2009
— Jun 2011

National University Of Computer and Emerging Sciences (FAST)
BSC Electrical Engineering

   Jun 2004
— Jun 2009

Experience

Saudi Technical Group
Planning Engineer

   Mar 2012
— Current

Preparing Site execution and supervision
*Following and coordinating all of the Electrical, Mechanical and Civil work
*Planning & Controlling EM work including Power, Lighting, low Current work, LV & MV Cable Work, Installation of LV & MV Equipments and Panels, Duct Work, Plumbing & Pipe Works, Installation of Mechanical Equipments 
*Studying the Electrical shop drawings and working on the power supply from the dual Main feeder with the backup power supplies (Generators) to the IT servers.  *Working and following the power supply to the HVAC and the other lighting and security systems. 
* Working in Dialux software for the planning of the lighting system. 
* Making Master Plan and detailed WBS for construction Projects on MS Project and Primavera. (P6 & P3) 
* Managing Earned Value Analysis (BCWP,BCWS,ACWP) 
*Developing PMS (Progress Management System) for the different Projects.  *Studying of the Shop Drawings to better implement the Planning of the project.  *Preparing Weekly Reports and giving presentation on the analysis of the project to the Client. 
*Managing Project Management Plan and Analysing the Cost, Quality Schedules of a Project. 
*Managing man power at site, allocating task and monitoring site productivity.  *Managing scheduled tasks and monitoring the site progress. 
*Tracking delivery of materials versus site requirements to ensure proper plan execution. 
*Conduct meeting between all parties to ensure smooth understanding and proper coordination with all trades.