Facade manager


Last Updated: 20th January 2019 (over 3 years ago)

Address
Russian Federation

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
25 to 34

Qualification Level
Masters

Languages
English, Italian, Portuguese, Russian

Summary

Strong multidiscipline skills and transversal analytic vision.
Ability to work under stress developed in the foreign experiences, especially in Africa. Strong propensity towards work scheduling for the control and analysis of time and cost (Earned Value Method, S curve of production, work scheduling with critical path and chain methods). Superb organizational skills and attention to detail given by architectural and management study, implemented by years of work in extreme condition such as in Mozambique, and with the maximum quality of works as in Moscow. Excellent problem solving skills and continuous improving and innovation.

Education

universita' degli studi di Udine
Master in project management

   Jan 2015
— Dec 2015

universita' IUAV di Venezia
Bachelor in construction management

   Sep 2008
— Mar 2012

ISSIS M Casagande
Surveyor

   Sep 2002
— Jun 2008

Experience

Rizzani de Eccher
Facade Manager

   Jun 2015
— Dec 2018

The Polyanka Residential Complex, worth $ 70.000.000, is located in the city center of Moscow. I’m in charge for the restauration of two historical buildings and the construction of the façade of five new buildings.
I had to compute all quantities regarding the facades works, such as stone curtain wall on metal structure, windows, illumination, plastering demolition and reconstruction, façade decorations.
The second phase, which I had to follow, was the development of the design through surveys of the heritage buildings, working documentation, material specification approval, windows details study. This phase was strongly connected to the Client and Engineering, with whom I had several meetings in order to achieve all design milestones on time.
In the current phase I’m managing all subcontractors concerning façade, checking method statement, procurement plan, work progress, making schedule of works.

CMC
Site manager

   Oct 2012
— Oct 2014

Assisting the TO in the design and build process.
Undertaking day to day delivery of projects
Responsible for overall project planning and scheduling, resource allocation, project accounting, and control, while providing technical direction and ensuring compliance with quality standards
Reviewing of the project plans and specifications and comment on the building design, scheduling, possible cost savings measures and potential construction problems
Controlling and monitoring labour, material and equipment expenses.
Prepare monthly cost forecasting summaries
Managing and supervising construction project from its conceptual development stage through final construction within schedule and budget.
Producing work progress monthly reports.

Search Jobs by Industry

Ad
Ad
Ad