Piping Engineer - Onshore / Offshore - 18 Years


Last Updated: 8th June 2019 (over 3 years ago)

Address
Geoje, Korea, Republic of

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Degree

Languages
English, Gujarati, Hindi, Korean

Summary

Piping Engineer with nearly 18 years’ experience in Engineering, Procurement, Construction & Commissioning (EPCC) & technical support for Greenfield/maintenance/Revamp modification work predominantly in the international Upstream & Downstream oil and gas projects , Refinery/Petrochemical complex/FPSO/Fixed Platform etc

Education

Maharaja Sayajirao Univercity of Vadodara
B E Chemical

   Apr 1997
— May 2001

Experience

Wood
Lead Engineer

   Feb 2018
— Current

Project : Various Feed/Detail Engineering field projects inside Gas Company
 Feb-2018 to Till date : Basra Gas Company - Iraq
Detail Engineering contractor : Wood
Client : BGC / SHELL
Position : Asset Lead Engineer
Job Responsibilities:

Job Responsibilities:

• Act as deputy to the Piping Head, Single point responsibility for all piping design related queries. Organise, assign and control discipline staff, such that work is progressed efficiently without compromising on quality.
• Estimate Man-hours for Work order, Execute discipline detailed design input to engineering projects & technical support studies as requested.
• Check piping & equipment layout with respect to P&ID, Piping design basis, Operation, Maintenance requirement. Check all piping deliverable to ensure adherence with quality policy.
• Ensure effective communication and interface definition between all disciplines for design development, review and check processes.

LINDE Engineering India
Principal Engineer - Piping

   Mar 2016
— Jul 2017

• Act as deputy to the Lead Piping Engineer, Single point responsibility for all piping design related queries. Organise, assign and control discipline staff, such that work is progressed efficiently without compromising on quality.
• Execute discipline detailed design input to engineering projects & technical support studies as requested.
• Check piping & equipment layout with respect to P&ID, Piping design basis, Operation, Maintenance requirement. Check all piping deliverable to ensure adherence with quality policy.
• Ensure effective communication and interface definition between all disciplines for design development, review and check processes

Samsung Heavy Industries
Manager - Piping Dept

   Sep 2011
— Feb 2016

• Lead functional engineer onsite for Piping Field Engineering disciplines.
• Responsible for managing various design queries / Execution issues, sets goals and objectives for subordinates. Carries out technical evaluations of piping field engineers; purview identifies gaps and works with Detail Engineering contractor/Client to develop plans to mitigate gaps identified.
• Establishes procedures on testing of piping systems like Hydro test, Post weld heat treatment , Chemical cleaning & oil flushing , Colour coding etc. responsible for verifying and witnessing Pneumatic and hydro test acceptance.
• Provides liaison with the design engineering group. This includes preparing and ensuring dispositioning of Site Technical Queries.
• Executes field take offs from IFC drawings and provides input for quantity tracking. Verifies installed quantities and reports weekly installed quantities to Project Controls. Manage isometrics availability to ensure isometrics are available before construction as per plan.
• Assists the Subcontract Administrator and Project Field Engineer in the quality control and final check out of Subcontractor piping work.

AMEC FOSTERWHEELER
Senior Engineer - Piping

   Sep 2009
— Aug 2011

• Prepare/Review project piping material specification, piping design standards, technical design instructions and discipline work practices / procedures and ensure they are produced to the correct level of quality and in accordance with the project plans
• Assemble and supervise a piping engineering group capable of executing a project. Create project piping engineering organisation chart, including a specification for the various roles and responsibilities defined. Compile / develop plans for the production and issuing of the piping deliverables
• Undertake all matters related to planning, progressing, reporting, manpower, man-hour and general administration.

FLUOR
Senior Engineer - Piping

   Jul 2008
— May 2009

• Controls and authorises piping discipline activities & deliverables to ensure Completion of safe and operable design in accordance with project requirements and codes. Reviews job scope and provides estimates. Prepares detailed schedules for applicable piping activities. Ensures the distribution of technical data and piping work instruction within group.
• Prepare/review equipment layout and piping routing. Route critical lines in coordination with stress. Review and approves all relevant vendor data.
• Participates in engineering co-ordination & progress meetings. Ensures compliance with prescribed quality plan and participates in quality assurance audits.

BECHTEL
Senior Engineer - Piping

   May 2006
— Jul 2008

• Act as deputy to the Lead Piping Engineer, Single point responsibility for all piping design related queries. Organise, assign and control discipline staff, such that work is progressed efficiently without compromising on quality.
• Execute discipline detailed design input to engineering projects & technical support studies as requested. Provide engineering support to the construction and commissioning phases as necessary.
• Check piping & equipment layout with respect to P&ID, Piping design basis, Operation, Maintenance requirement. Check all piping deliverable to ensure adherence with Bechtel quality policy.
• Ensure effective communication and interface definition between all disciplines for design development, review and check processes.

UHDE
Piping Engineer

   Dec 2004
— Dec 2005

• Prepare Individual Design Plan at start of project & Assists the Lead Piping Engineer in the management of Piping Group’s day to day activities / deliverables. Prepares Scope of Work (SOW), Work Demarcation Table, Work Schedule and Man-hour Estimation for the above mentioned purpose.
• Prepares the execution plan for piping design and engineering with the Lead Piping Engineer. Layout & Modelling of piping & equipment routine, Finalisation Equipment nozzle orientation, Preparation of stress package & resolve queries by other disciplines & model review comments.

RELIANCE INDUSTRIES LIMITED
Piping Engineer

   Dec 2003
— Dec 2004

• Oversee Piping bulk material aspects, bulk take-offs, quantification & allocation in material management system
• Design and review piping and equipment layout documents, drawings and 3D models with consideration to all relevant disciplines
• Effectively co-ordinate piping engineering activities with the project/ Operation/Maintenance group. Attend and contribute to design / construction reviews.

Chemietech Projects Ltd
Process / Piping engineer

   May 2001
— Dec 2003

• Carry out preliminary, basic, and detailed piping engineering studies and produce associated deliverables, e.g. MTOs, valve datasheets, isometrics, piping plans, etc. Issue piping engineering deliverables to ensure technical quality.
• Prepare various design deliverables and reports e.g. PFD/P&ID, wall thickness calculation, Pressure drop calculation etc

Chemietech Projects Ltd
Process / Piping engineer

   May 2001
— Dec 2003

• Carry out preliminary, basic, and detailed piping engineering studies and produce associated deliverables, e.g. MTOs, valve datasheets, isometrics, piping plans, etc. Issue piping engineering deliverables to ensure technical quality.
• Prepare various design deliverables and reports e.g. PFD/P&ID, wall thickness calculation, Pressure drop calculation etc

Search Jobs by Industry

Ad
Ad
Ad