Project Director
May 2018
— Nov 2018
The investment has been divided into two stages:
• Stage I covers the connection of the Lwówek, Kotowo and Krobia nodes (about 114 km).
• Stage II covers the connection of Krobia and Odolanów nodes (about 54 km).
The contractor for the construction works of the first stage of the investment is the Consortium of PORR Polska Infrastructure S.A. and O.T. Industries-KVV Contractor CO. LTD.
A project of Community interest
In October 2013, the European Commission awarded the investment status as "Project of Common Interest".
Project Manager / Senior Surveyor / IVB / PED Branch expert
Jul 2012
— Dec 2017
Martin Linge Topside Project, Senior Surveyor / Deputy Project Manager,
DNV GL SHI Offshore Office, Geoje, Rep.of Korea
Recent projects:
Total E&P Norge, Martin Linge Topsides Project (PED Certification and Verification (IVB))
Cooperation between DNV GL Korea and NB2099 2014-05, 2017-12
Teekay PJ Knarr FPSO 2014-04, 2014-06
N-notation related training
96K Type Drillships for PDC 2013-10, 2014-05
SHI Hull no.:2015/2057/2075
96K Type Drillships for Ocean Rig 2012-07, 2013-10
SHI Hull no.:1979/2013
General experience:
Experienced Class Surveyor
Very well experienced as Project Manager, Risk Manager, Troubleshooter and Coordinator of design as well as classification and verification processess.
Monitoring and advising on the performance of the quality management system, producing data and reports which were measured against set standards. Advising on changes and how to implement them whilst providing training, tools and techniques to enable others to achieve quality standards.
Updating and maintaning of all documented systems and procedures, including the Project Quality Plan. Ensuring all project processes are compliant with the statutory requirements and project specification.
Planning and monitoring internal and external audits in accordance with the statutory requirements and project specification, providing feedback to implement improvement.
Ensuring the management of the NCR issues and follow-ups, quality alerting and Root & Cause Analysis to prevent re-occurrence of the problems.
Coordinating, directly supervising and instructing the subcontractors.
Very well experienced as Manager/Supervisor of construction process from design, commissioning, classification and quality point of view. Managing all technical, statutory and quality aspects of many classification/verification/certification orders with regards to new building projects, as well as fleet in service. (EN, BS, ASTM, ASME, API, MODU, SOLAS, MARPOL, Load Line, US Coast Guard Regulations, national shelf regulations, EN ISO and NORSOK standards, etc.)
Performing Welder’s Qualification Tests followed by certification in accordance with recognized standards
(ex.EN ISO 9606).
Witnessing development and confirming WPSs, in accordance with the statutory requirements and project specification.
Acting as PED Branch expert to Notified Body, performing audits, surveys and conformity assessment in general.
Performing Independent Third Party Verification, commissioning, technical expertise, operation tests and certification on board of the offshore installations and vessels, regarding:
1. Steel Structure Fabrication
2. Metallurgy and Manufacture
3. Welding Technology
4. Non-Destructive Testing
5. Production Plant
6. Hydrocarbon Systems Integrity
7. Drain Systems
8. Process Safety
9. Process Relief and Depressurization Systems
10. Active Fire Control
11. Passive Fire Protection and Explosion Barriers
12. Fire & Gas Detection Systems
13. Escape and Evacuation Systems
14. Lifesaving Appliances
15. Offshore drilling equipment (drilling package)
16. Machinery items (propulsion – main engines, shafting, auxiliary machinery, pressure vessels, piping systems etc.)
17. Electric items (cable network, high and low voltage installations, etc.),
18. Power generation (Main and Emergency Diesel-Generator Sets),
19. Automation (safety devices, alarm control and monitoring systems, power management systems, switchboards, protection settings, fire alarm systems, etc.)
20. Elevators
21. Structural Fire Protection
22. Statutory items (flag state & national shelf state regulations)
Project Manager / Senior Surveyor / Team Leader / Surveyor’s Coach
Feb 2005
— Jun 2012
"Santa Ursula" (IMO no.9430387) 2011-05, 2012-03
Container carrier 7800 TEU
"Santa Rita" (IMO no.9425382) 2010-03, 2011-05
Container carrier 7154 TEU
"Cap Isabel" (IMO no.9484558) 2009-06, 2010-03
Container carrier 4600 TEU
"Cap Ines" (IMO no.9484546) 2009-03, 2010-01
Container carrier 4600 TEU
"MSC Danit" (IMO no.9404649) 2008-10, 2009-03
Container carrier 14000 TEU
"CMA CGM Vela" (IMO no.9354923) 2008-06, 2008-10
Container carrier 11040 TEU
"Rio de Janeiro" (IMO no.9357963) 2007-06, 2008-06
Container carrier 5905 TEU
Experienced Class Surveyor
Very well experienced as Project Manager, Risk Manager, Troubleshooter and Coordinator of design as well as classification process.
Very well experienced as Supervisor of construction process from design, commissioning, classification and quality point of view.
Managed all technical and statutory aspects of many classification orders with regards to new building projects, as well as fleet in service. (SOLAS, MARPOL, Load Line, US Coast Guard Regulations, etc.)
Leading the group of technical experts
Performing technical expertise, operation tests and certification on board of the vessels, regarding:
1.Machinery items (propulsion – main engines, shafting, auxiliary machinery, pressure vessels, piping systems etc.)
2.Electric items (cable network, medium and low voltage installations, etc.),
3.Power generation (Main and Emergency Diesel-Generator Sets),
4.Automation (safety devices, alarm control and monitoring systems, power management systems, switchboards, protection settings, fire alarm systems, etc.)
5.Safety equipment.
6.Fire extinguishing systems (CO2, water fog, water spraying, sprinkler, fire & deck wash, etc.)
7.Lifting Appliances & Elevators
8.Structural Fire Protection
9.Statutory items (flag state related matters)
10.Structural (hull) – welding, NDT, prefabrication & erection processes.
Experienced as Surveyor’s Coach, being the trainer and mentor for company’s new comers
Experienced as Survey Monitor, being responsible for periodical monitoring of Surveyor’s performance with regards to company and international standards and regulations (assessment based on professional knowledge, preparation to survey, performance as well as attitude in front of company customers).
Project / Design Engineer
Jan 2002
— Jan 2005
Very good knowledge about various CAD systems as Autocad, Tribon, Catia etc. Large projects for:
Meyer Werft, Papenburg, Germany
Lloyd’s Werft, Bremerhaven, Germany
Managed private design company, being involved in large and challenging design projects.
Project / Design Engineer
Apr 1998
— Nov 2001
Very good knowledge about various CAD systems as Autocad, Tribon, Catia etc.