Multidisciplined Projects Engineer (Mechanical)


Last Updated: 13th December 2017 (over 4 years ago)

Address
United Kingdom

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
25 to 34

Qualification Level
HNC/HND/City & Guilds

Languages
English

Summary

I have worked in engineering for more than 11 years and have built up a wealth of knowledge and experience. My first position was with SPP Pumps where I gained the bulk of my experience and knowledge. SPP is a world leader in the design and manufacture of pumps and fluid movement/management systems. I joined the company as an apprentice and during my training I gained many qualifications and much valuable practical experience. I have worked in many aspects of the business during my apprenticeship from design engineering, product development, test engineering and rigging through to production and manufacture. Therefore, I developed a broad understanding of the operation of the whole company. My job involved me liaising between a wide range of departments and required me to develop and use communication and management skills. As my skills and knowledge developed through my career, I was able to take control of project related data and documentation, including full job specifications and costing approval to HSE requirements while complying with strict company standards.

The most enriching experience is my time spent in Sierra Leone as it taught me many things about myself. I am able to supervise/manage people and I am able to plan and organise operations in an accurate and efficient manner in order for local people to understand and undertake set tasks. When working and living in the jungle I have learnt to be resilient, self-reliant and work with a level of autonomy whilst dealing with many other factors like cultural differences, language barriers and difficult working conditions. Before accepting my position in SL I was offered and declined a Project Engineer’s role at Astrium a front runner in the European space industry.

Experience

Gaia Resources Ltd, FG Enterprises
Assistant Manager

   Feb 2017
— Current

Identify, prioritise and approach selected companies to work together on international development projects in West Africa
Compile pitch letters for selected companies
Compile letters for Expressions of Interest in development projects/Bids/Tenders funded by World Bank, EU, ADF, IDF MCC and other international funding
Costing Return on Investment calculations, cost budgeting

Omega Engineering Services
Projects Engineer

   Jan 2015
— Jul 2015

Project management and control from conception to delivery.
Compile detailed quotations for standard and one off engineered projects for tender.
Client liaison through the entire duration of the projects from quotation to manufacture.
Use of AutoCAD and SolidWorks to produce engineering drawings electrical and mechanical.
Liaison with different departments to gather relevant information to manage and plan projects.
Organise client/supplier meetings and visits to discuss current and future plans.

N/A
Travel - Worked in a wide range of positions

   Jan 2013
— Dec 2014

Manager of numerous hostels
CoreGroup – Oil Pipeline refurbishment technician
Life guard
Hospitality/catering
Other positions around New Zealand plus Japan

Developing Technologies
Voluntary Borehole Contractor

   May 2012
— Jan 2013

Manufacture of new components within the capabilities of Sierra Leone manufacturing.
Plan out all operations within the manufacturing process and address any issues before they arise
Test all components manufactured before use at drill site includes checking fits, welds and functionality.
When working in the jungle – Supervise all drilling activities, log drilling rates and soil and rock sampling
Manage food/water supplies for myself and my employees.
Manage working hours and wages.
Deal with workers medical problems.
Deal with issues within the community around the Gola forest.
Manage all drilling operations within the Gola Forest Program construction site.
Sink/construct well for construction purposes.
Compile a pump installation procedure with detailed drawings of well construction and step by step guide.

Weatherford - Smart Stabilizer Systems
Research and Development Engineer

   Feb 2011
— May 2012

To safely set up test equipment using basic hand tools and power tools.
To set up data collection equipment to ensure testing is efficient and completed in a timely manner.
To use equipment for the purpose of carrying out the test, taking clear and precise measurements that will enable analysis of the test results.
Compile detailed test file with written summary reports, including graphical representation of results, outlining test equipment used, results found and conclusions reached.
To make recommendations regarding further testing, implement changes to the test rig and redesigning and purchasing parts as necessary.
Use SAP system for raising purchase orders, creating BoM’s and organising project data
Use company truck to pickup/deliver components for assembly and/or modification.
To make sure that test equipment is maintained in full working, calibrated order to ensure accuracy of testing
To design and build new test equipment purchasing parts where necessary.

Gardner Denver - Compair
Vanes Development Technician

   Mar 2010
— Feb 2011

Build and test multiple new product developments in line with company standards
Modify new product developments using basic milling, drilling, lathe and fabrication work to improve performance
Keep project file up to date
Report any problems to line manager and/or design team and any changes to design that might be required
Use and update project plans to assist in the development process

N/A
Travel

   Oct 2008
— Dec 2009

Travel to Australia and New Zealand

SPP Pumps Ltd
Product Development and Technical Support - Apprentice

   Aug 2005
— Oct 2008

Compile design file with all technical data i.e project approval and costing, drawing work, test reports, Non Conformance Reports and full written reports with photos
Create action plans for new projects to ensure the completion of each project to a specified deadline.
Create new Autocad cross sectional/component and assembly drawings.
Ensure all data and documentation is current and correct using internal network with informal sharing of controlled and uncontrolled data filing systems linked to MRP and MPS systems
Liaise with product development and technical support team to discuss progress of projects, design changes that may need to occur and any issues/problems that may have arisen.
Ensure all components are available for builds by checking MRP/MPS (Materials Resources Planning/Master Production Schedule) system for stock availability
Analyse test rigging requirements i.e. driver(motor/engine), correct alignment of pump and driver, pipe work, test equipment and health and safety requirements
Conduct full performance tests and NPSH (Net Positive Suction Head) test on development projects to assist in the design process and produce accurate performance curves
During testing input data into test software to produce performance curves to determine a pass or fail
Liaise with subcontractor to discuss fabrication drawings/designs for test area developments; this would include custom stands for pipe work, guarding to cover health and safety and in some cases pipe work for exhaust outlets.
Use MRP/MPS to raise purchase orders for subcontracted work, Expedite orders as required.
Liaise with senior management to discuss ongoing projects progress and planning
To complete NVQ level 3, HNC and key skills while spending six months in each section of the company being engineering design, quality assurance, product development, production, procurement and the test stand
Create action plans for new projects
Update and create new BoMs
Create new component and assembly AutoCAD drawings to cover project specifications and NVQ 3 criteria
During my NVQ I was asked to work on two projects for product development with the Engineering Manager of a company based in India KBI (Kirloskar Brothers International), this involved producing chassis/skid drawings, GA’s and new component drawings and was a very valuable experience.
Compile design files with all technical data and full written reports in paper and electronic form
Research new machining jigs and fixtures for improved productivity and cost effective manufacture/machining
Create shop floor layouts for new machinery introductions
Design new tooling, jigs and fixtures for machining processes
Control Buyer/Planner code on MRP making sure stock levels are correct ordering stock as required or as forecast
Conduct full performance tests on standard products
Fill out test reports and NCR’s

Ad
Ad
Ad