EPC Project Lead-Electrical


Last Updated: 15th November 2017 (over 4 years ago)

Address
India

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Other Post Graduate

Languages
English, Hindi

Summary

A trained electrical engineer having specialized in Thermal Power Plant Engineering enriched with more than 19 years of experience particularly in EPC project management, Erection,Commissioning & Troubleshooting, Engineering Procurement, Project Coordination etc. mostly in power & process industries & also took part in O & M activities in Power Plant operation for various process industries ( Steel,Sugar, Tyre etc.)

Education

JALPAIGURI GOVT. ENGG. COLLEGE
BACHELOR OF ELECTRICAL ENGINEERING

   May 1990
— Aug 1994

• B.E. (ELECTRICAL), From GEC JALPAIGURI, UNIVERSITY OF NORTH BENGAL, JALPAIGURI. 1994.
• P.G.DIPLOMA (THERMAL POWER PLANT ENGG.), from NATIONAL POWER TRAINING INSTITUTE, BADARPUR-NEW DELHI 1997

Experience

M/s Sukhbir Agro Energy Limited
Manager-Project Coordination

   Feb 2017
— Current

At present, primarily involved in initial stages of Project management related to Engineering, Procurement & Construction activities for 8 x 18 MW Biomass based Power Plants in various locations in the state of Punjab.

• EPC Project Management includes BTG, BOP, Switchyard & Sub Station, and Linking Transmission Line up to PSPCTL Sub Station.
• Performing detailed engineering on Electrical, Instrument and Control System.
• Engaged in Vendor development, E & C Contractor finalization, Product selection
• Supports Sales and proposals team in providing design inputs regarding all electrical and instrument requirements
• Managing co-ordination of the partners and working groups engaged in project work.
• Recording and managing project related issues and escalating where necessary.
• Putting decade long expertise in Electrical & Instrumentation (SLDs, Schematics, Datasheets, Instrument Index, I/O List, Cable Block Diagram, Cable Schedule, review of Vendor data etc.)
• Creating a task list, delegate work to others and keep on top of progress.
• Managing competing deadlines and prioritizing workload in a busy environment
• Taking Lead to plan ahead, factor multiple variables, use own initiative in planning tasks
• Initiating steps to work effectively within a team, setting clear goals, coordinating work with colleagues; with flexibility, negotiation and providing advice to other members of the team
• Committed to ensure Performance of equipment supplied and complains handling.
• Responsible for monitoring and reviewing flow of documents and drawings limited to the discipline.
• Utilizing excellent interpersonal skills to lead team members with Business insight and commercial awareness thus restricting budget to the minimum possible.
• Floating enquiries to vendors & negotiate rates with them.
• Site visit & preparation of site investigation report
• Preparation of Construction methodology based on the drawings & detail engineering
• Responsible for overseeing, auditing & implementation of the Site execution / quality / HSE Plans.

Apart from the above assigned jobs, myself is also privileged to tasked with O & M activities for E & I related to day to day commercial running of Biomass based Power Plants including enhancement of efficiency & innovating more economical ways of plant operation besides Spares procurement.

a) 1 x 15 MW Biomass based Power Plant in Ghazipur(U.P.)
b) 1 x 14.5 MW Biomass based Power Plant in Channu(Punjab)

M/s ISGEC HEAVY ENGINEERING LIMITED
DEPUTY MANAGER

   Mar 2014
— Jan 2017

• Liaison with Operations, Pre-commissioning, Design, Engineering and Quality groups to obtain full scope understanding.
• Contribute and actively participates in constructability reviews, plans to drive design optimisations.
• Review and assist with the development of implementation Hook-up estimates.
• Prepare project execution sequence and logic (WBS).
• Identify carry over works and escalate to line management.
• Support and contribute the development of construction work packs.
• Provide 3C experience and support during the implementation phase.
• Identify and support the timely delivery of documentation, fabrication, materials, personnel and vendors aligned to Project delivery schedule.
• Responsible for overseeing, auditing & implementation of the Site execution / quality / HSE Plans.
• Liaises with, and update progress to client / project board / company senior management.
• Monitor and report implementation related changes and growth during the course of the project.
• Support site surveys during the engineering development phase.
• Travel to facilities to assist project team and coordinate execution aligned to project schedule.
• Co-ordinate pre-commissioning activities with effective use of site personnel to help achieve further handover post MC.
• Liaise with Functional Management / PMT to ensure best practice and innovations to optimize delivery against schedule milestones are being achieved.
• Monitor and record punch list status and escalate accordingly to line management.
• Maintain accurate documentation against procedural compliance. (Daily Reports / As built)
• Participate with asset incidents / hazards investigations and communicate findings to PMT or line manager.
• Ensure execution risk and mitigations are identified within work pack.
• Support day-to-day HSE performance during construction to ensure leading indicators are achieved.
• Recording and managing project related issues and escalating where necessary.

Successfully completed EPC Power projects (Green field).

A) 1x16 MW Co-generation Power Plants, GPSL, Vaduj (Maharashtra)
B) 1x50 MW Coal based Power Plant, SCPL, Korba (Chhattisgarh)
C) 1x 20 MW Captive Power Plants, BIL, Bhuj (Gujarat)