Construction Manager / Project Manager


Last Updated: 26th April 2018 (over 4 years ago)

Address
Vanderbjilpark, South Africa

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Trade Qualification

Languages
Afrikaan, English

Summary

I am a well organized multi skilled Construction Professional with over 15 years experience working in Construction Supervisory field covering the following areas; Hydrocarbons (Pipelines and associated Facilities), Gas Lines (onshore and off-shore), Gas Processing Plants, Tank Construction and General Construction Management. Full knowledge of NEC Contracts;Project planning,resource allocation and monitoring; Estimating and Budget management.

I am currently working as a Construction Manager for Worley Parsons and is looking for a position as a Construction Manager, Construction Supervisor where I will be able to utilize my skills and knowledge to further advance in my career.

Education

Project Manager Acadamy Bridgit Africa
Project Management Professional Preparetory Course

   Mar 2018
— Mar 2018

The concrete Institute
Certificate of Achievement

   Sep 2017
— Sep 2017

Introduction to concrete

Legricon
Construction Regulations

   Apr 2017
— Current

Need of Contractor management
Basic Employer OHS responsibilities
Construction Regulations 2014

Leading Edge
Microsoft Projects 2013

   Jul 2016
— Aug 2016

The South African Institute Of Welding
Fabrication/Welding Inspector Level 2

   Sep 2004
— Dec 2004

Quality Control

Vaal Triangle University ( Previously Vaal Technicon)
AEB Certification

   Jan 1995
— Jan 1995

Radiographic Testing

School Of Applied Non-Destructive Testing Examination
Non-Destructive Testing

   Nov 1994
— Dec 1994

Magnetic Particle Inspection
Liquid Penetrant Inspection

Experience

Worley Parsons
Projet Manager / Construction Manager

   Oct 2016
— Jan 2018

This role encompassed both Project Management and Construction Management
Seconded to Natcos (Joint Venture Bulk Storage Facility between Sasol, Total and Natref)
Tank Restoration Project (2 off 55m floating roof tanks).
Replacing floors and demolishing existing floating roof
Installing geodesic dome and deck
Installing new mixers and recoat entire tank
Replace all existing underground piping and new oily water and rain water pits.
Project documentation and reports
Project planning,resource allocation and monotoring
Estimate and budget management
Project communications and meetings.
Risk and issues management

Worley Parsons
Construction Manager

   Oct 2015
— Oct 2016

Appointed as the Construction Manager to work on Sasolburg Denim Maintenance Redundancy Project
Appointed as the Construction Manager to work on Sasol Power Station 2 which included new substations, installation of pipe racks and various other pumps
Appointed as the Construction Manager to work on carbon and stainless steel piping
Overall planning, coordination and control of the project
Conducted potential deviation analysis meetings for critical activities

Worley Parsons
Construction Superintendent

   Jun 2015
— Oct 2015

Appointed as a Construction Superintendent to work on the Tanzania Natural Gas Processing Plant and Transportation Pipeline, 550km pipeline from Dar Es Salaam to Mtwara and Songa Island.
Setting up of Construction Execution Plans

Worley Parsons
Construction Superintendent

   Jan 2015
— Jun 2015

Appointed as a Construction Superintendent to work on KAXU Centralised Solar Power Plant. Consisted out of 100 solar facility spanning 2718 acres
Responsible for the performance run of the plant and turbine unit
Approving of all repair and test procedures
Remove and reinstall defective bearings on the turbine unit

Worley Parsons
Construction Manager

   Jun 2014
— Dec 2014

Overall Planning, coordination and control of the project.
-Monitors subcontractor’s labor force and performance.
-Ensures that construction procedures are adhered to
-Coordinating schedules and activities between the different disciplines.
-Instructs subcontractors on day to day matters.
-Liase between Engineering and Construction on delays and schedule impacts.
-Meeting the clients requirements to produce a functionally and viable project.
- Setting up of Construction Execution Plans
-Constructability Reviews
-Construction readiness review

Worley Parsons
Construction Superintendent

   Mar 2012
— Jun 2014

-Responsible for total scope off work for all disciplines.
-Monitors subcontractor’s labor force and performance.
-Fully familiar with drawings & specifications applicable to the project.
-Ensures that construction procedures are adhered to and the contractor is fully familiar with the quality control systems.
-Coordinating schedules and activities between the different disciplines.
-Instructs subcontractors on day to day matters.
-Checks and recommends subcontractors change orders.
-Coordinating between client and sub-contractors.
-Coordinating between Engineering and Construction on delays and schedule impacts.
-Planning and executing all shutdown tie-in’s and shut down scope.

Worley Parsons
Tank Superintendent

   Aug 2011
— Mar 2012

Appointed as a Tank Superintendent to work on the Transnet New Multi Product Pipeline from Johannesburg to Durban.
Responsible for the erection of 10 off storage tanks on site and on workshops
Monitor all tank activities on site in respect of safety, quality, schedule, and cost

Worley Parsons
Piping & Mechanical Lead

   Feb 2011
— Aug 2011

Appointed as the Piping and Mechanical Lead to work on the Transnet new Multi Product Pipeline from Johannesburg to Durban
Responsible for all piping and mechanical works

Worley Parsons -Singapore
Piping Supervisor

   Aug 2010
— Dec 2010

Responsible for the overall piping works.
-All piping activities on site in respect of Safety.
-Monitors subcontractors labor force for the piping discipline.
-Fully familiar with drawings & specifications applicable to the project.
-Ensures that construction procedures are adhered to and is fully familiar with the quality
Control procedures applicable to the discipline.
-Instructs subcontractors on day to day matters.

Royal Haskoning
Piping Lead

   May 2009
— Jul 2010

-Responsible for the overall piping works on the project including all underground pipe work.
-All piping activities on site in respect of Safety, Quality, Schedule and cost.
-Monitors subcontractors labor force for the piping discipline.
-Fully familiar with drawings & specifications applicable to the project.
-Ensures that construction procedures are adhered to and is fully familiar with the quality
Control procedures applicable to the discipline.
-Instructs subcontractors on day to day matters.
-Checks and recommends subcontractors change orders. Reports to the Construction Manager.

Uhde
Site Supervisor

   Jul 2006
— May 2009

Accommodating 3 Plants for gas pipeline from Mozambique
-Installation of pumps, vessels, filters and pipelines between different plants.
-Shutdown tie-ins, modifications to existing pressure vessels
And column replacements.
-All piping activities on site in respect of Safety, Quality, Schedule and cost

Uhde
Piping Supervisor

   Oct 2004
— Jul 2006

Responsible for the overall piping works.
-All piping activities on site in respect of Safety.
-Monitors subcontractors labor force for the piping discipline.
-Fully familiar with drawings & specifications applicable to the project.
-Ensures that construction procedures are adhered to and is fully familiar with the quality
Control ones applicable to the discipline.

Search Jobs by Industry

Ad
Ad
Ad