Field Piping Engineering, Senior Design Supervisor - Piping


Last Updated: 10th February 2019 (over 3 years ago)

Address
United States

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
55 to 64

Qualification Level
Degree

Languages
English

Summary

Forty four years of Process, Chemical, Utility piping design engineering / construction experience in several industries including refineries, petrochemical, chemical, acrylic acid polymers and monomers, nuclear, automotive, and manufacturing facilities.

Managing/supervising / executing projects in the home office or in the field.
Personnel supervision and mentoring.
Development/executing budgets and schedules for Personnel, Engineering Deliverables, and Work Plans.
Interpersonal skills interface effectively with co-workers, Project Management, Construction Contractors, and Clients.
Highly organized in prioritizing work, identifying problems, and implementing solutions. Consistently meeting Client expectations and schedule.

Roles and responsibilities include Field Piping Engineering Lead,Piping Technical Adviser on overseas assignments, Pre-Commissioning Lead for reinstatement and Client walk downs, PMC, Piping Construction Superintendent.

Software Training and Utilization
AutoCAD to version 2017  Microstation 2D/3D  Intergraph PDS Equipment Modeling/Piping Design/Design Review Smart Plant Review  SP3D – limited experience  Microsoft Word/Excel/PowerPoint/Access  Adobe Professional Miscellaneous software/programs used in communication and production of engineering documents

Education

ITT Technical Institute
Associate Degree in Engineering Technology

   Jun 1972
— Jun 1974

Experience

Fluor
Senior Design Supervisor – Expat Piping Coordination Marathon Star, Manila, Philippines

   Mar 2018
— Current

Piping Technical Advisor and Coordinator for Marathon Star Project – Pipe Stills 3B Area - Fluor Manila with interface responsibilities and coordination to Houston office on piping design/engineering issues in Manila and the execution of the work between both offices.
• Engaged in model reviews, review model comments, peer reviews of the model, and issued documents to keep rework to a minimum.
• Perform quality audits on isometrics prior to being issued, ensure all procedures, design methodology, and instructions are followed.
• Provide input in Change Management – identification and definition of change in the baseline. Work with the Piping Designers and Management concerning FDCN’s, RFIC’s, Stress, and Equipment Holds that delay issuance of drawings and delay impacts on schedules.
• Provide support for Construction Work Packages (CWP) and for the PAU (pre-assembled units) on the project.
• Mentor and coach Piping Designers with general layout, pipe routing, and checking of their documents.

Fluor
CP Chem USGC Ethylene Project Fluor/JDC Joint Venture Chevron Phillips, Baytown, Texas

   Feb 2017
— Mar 2018

One of five Field Piping Engineering Leads directing and overseeing walk downs for hydro tests and Final Reinstatement of systems.
• Assigned Construction personnel and General Foremen to complete piping systems and/or require final items completed for restoration.
• Ensure sub systems reinstated/restorations are complete with no open items or Construction and Pre Commissioning open punches.
• To have the correct material verified for reinstatement and assist in leading the Construction crews in preforming reinstatement.
• Release sub systems and systems to Client for their walk down and sign-off. Final walk down with Client to completeness of systems.
• Assessing the line break lists and blinds on all sub systems while working with the Pre-Commissioning System Lead.
• Developed a tracking system for packages that were to be walked and signed with daily reports to Management and the Client.

Fluor
SASOL Zeigler Lake Charles, Louisiana / Manila, Philippines

   Jun 2016
— Feb 2017

Field Piping Engineering Lead for a 30 day turnaround to give assistance to the Contractor and SASOL site personal in resolving piping and engineering issues during the construction and installation of the piping systems.
• Did walk downs of piping systems before and after their installation, red line drawings where changes occurred.
• Interfaced with Fluor Piping, Client Site Management, and Fluor Houston Management concerning changes and progress of the work.

• Piping Technical Advisor for SASOL Zeigler project – Fluor Manila with interface responsibilities and coordination with Houston office on piping design/engineering issues in Manila and the execution of the work between both offices.
• Engaged in model reviews, review model comments, peer reviews of the model, and issued documents to keep rework to a minimum.
• Perform quality audits on isometrics prior to issuing. Ensure all procedures, design methodology, and instructions are followed.
• Provide input in Change Management – identification and definition of change in the baseline. Work with the Piping Designers and upper Management concerning FDCN’s, RFIC’s, Stress, and Equipment Holds that delay issuance of drawings and delay impacts on schedules.
• I worked/assisted the Overall Lead of project in schedules and tracking of rework, staffing, and isometric issuance.
• Mentor and coach Piping Designers with general layout, pipe routing, and checking of their documents.

Fluor
Sadara Project - UPI – Pre Commissioning Saudi Aramco/Dow, Jubail, Kingdom of Saudi Arabia

   Jul 2015
— Jun 2016

Pre Commissioning Lead for Reinstatement Final Walk Downs and IP Reinstatement – ICF Pipe Rack and Waste Water Treatment.
• Creation of Final Reinstatement - Final Walk Down Packages for sign off.
• Ensured sub systems reinstated are complete with no open items or Construction and Pre Commissioning open punches.
• Ensured all QVD’s are complete and resolve any open QVD open issues or documentation.
• Creation of IP Reinstatement Packages for positive isolation of N2 padding.
• Assessed the line break lists and blinds on all sub systems while working with the Pre-Commissioning System Lead.
• Released sub systems to Turnover Group for Client turnover MC.

Fluor
SABUCO Syngas/Butanol Project Tasnee – Jubail, Kingdom of Saudi Arabia

   Sep 2014
— Jul 2015

On site assignment in a PMC role as a Construction Manager and Night Shift Coordinator of 275-325 workers with oversight of the Engineering Contractor and sub-contractors for the construction and completion of a Syngas/Butanol plant.
• Reviewed and monitored the nightly activities of the sub-contractors and progress of work per Construction and prioritized schedule.
• Reviewed technical data and documents, reviewed and commented on Variation Notices and Concession Requests.
• Monitored and reported on Construction Schedule milestones and impacts. Reviewed and countersigned work permits.
• Provided quality appraisal and oversight of the activities of project participants.
• Worked closely and interfaced with Construction Management, QA/QC, and Field Supervisors and Foremen in the field.
• Involved with Safety protocols and Safety walk downs reporting directly to the Safety Director.

Fluor
Sadara Project - UPI Saudi Aramco/Dow Chemical, Jubail, Kingdom of Saudi Arabia

   Jan 2014
— Sep 2014

On site assignment in a PMC role as a Piping Construction Superintendent to supervise and have direct oversight of the Contractor for the construction and the testing of the piping inside the 2.3 kilometer IC pipe rack and the 66 interface points.
• Supervised/monitored 626 hydro test packages within the IC Pipe Rack. My direct oversight and supervision began after air drying process or service test – Post Punch and Reinstatement of line, painting, electric trace, and insulation of lines required.
• Monitored and directed Contractor per Construction Schedule and priorities for completion of the Post Punch and Reinstatement of line.
• Tracked and reported progress of Contractor in completing all test packages for turn over to Engineering then to Commissioning team.
• Approved and managed the schedule of electric trace and insulation of lines per priorities.
• Interfaced with Contractor to resolve engineering and material issues within IC pipe rack and the 66 interface points with other assets.
• Coordinate and manage Operation’s final punch for completion and sign-off to the Contractor.

Fluor
Fluor Arabia Limited Office Khobar, Kingdom of Saudi Arabia

   Nov 2012
— Jan 2014

Piping Technical Advisor/Trainer for the office and projects for Fluor Arabia Limited office.
• Supervised projects as per engineering schedule in the progress of the detail design and deliverables.
• Worked directly with the Piping Leads in developing their managing of the work and schedule for issuing deliverables.
• Scheduled/tracked progress for design/issuing of deliverables. Development/managed of Engineering and Construction Schedules.
• Piping Lead for the Department in estimating for new project proposals/writing of Scope of Services and Scope of Facilities documents.
• Developed teaching curriculum in Piping Discipline for eight weeks Internship Program for senior college students chosen to participate in.
• Work directly for the Piping Department Manager and assisted him in his duties in running and managing the Department.

Search Jobs by Industry

Ad
Ad
Ad