Lead Planning and Scheduling Engineer


Last Updated: 27th March 2018 (over 4 years ago)

Address
India

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
45 to 54

Qualification Level
Degree

Languages
English, Hindi

Summary

I am a Mechanical Engineer with overall 25 years of experience in onshore Oil & Gas construction projects including 15 years in Project Planning, Scheduling, Monitoring and Control.
I am proficient in developing and maintaining schedule of EPC Project in Primavera P6 by CPM Planning Method and procedures for planning & project control, coordination, progress measurement and Invoicing.
Skilled in Creating EPC Registers for progress measurement, well conversant with Project Risk; Familiar with Primavera Risk Analysis software Monte Carlo and Acumen Risk.
Acquired certifications of Primavera P6, Primavera Risk, Acumen Fuse & Acumen 360 & Acumen Risk.
Holds the merit of handling various projects in UAE:
 ESI Carbon Capture and Storage, Abu Dhabi
 Shah Gas Development Package 2 & 3 Abu Dhabi
 JVS-3 Villa Const. Project Dubai
 FWTS-2, 131kM, ø 64” Water Transmission Pipeline Fujairah
 Refurbishing & Building of New Land Rigs (Nabors, Ensign, WDI, and LTI)
 ADCO Flow Line Construction and Wellhead Piping Installation
I am a team player with excellent problem solving & analytical skills
Currently worked for a Multi-National EPC Company based in UAE in the capacity of Lead Planning and Scheduling Engineer for a clean energy project undertaken by ADNOC and MASDAR (ESI Carbon Capture and Storage Project). This assignment encompassed leading the project control teams from inception to hand-over stage of the project.
I am looking for new opportunities.

Education

CMCS, Dubai
Acumen Risk

   Nov 2014
— Nov 2014

Acumen Risk

CMCS, Dubai
Acumen Fuse & Acumen 360

   Nov 2014
— Nov 2014

Acumen Fuse & Acumen 360

CMCS, Dubai
Primavera Risk Workshop

   May 2013
— May 2013

Primavera Risk Workshop Monte Carlo

CMCS, Dubai
Primavera P6

   Mar 2008
— Mar 2008

Primavera P6 Project Management Module

Cambridge Educational Institute
Primavera P3

   Oct 2007
— Oct 2007

Primavera P3

Navabharath Educational Research Foundation
BTech Mechanical

   Apr 1986
— Apr 1989

Mechanical Engineering

Government Polytechnic Durg MP
DME

   Jun 1982
— Jun 1985

Diploma in Mechanical Engineering

Experience

Dodsal Engineering & Construction Pte Ltd.
Lead Planning & Scheduling Engineer

   Mar 2009
— Feb 2017

Projects completed:
1) ESI Carbon Capture and Storage Project Mussafah, Abu Dhabi, UAE
2) Shah Gas Development Package 2 & 3 Sulphur Rec., Process and Power Gen., Abu Dhabi, UAE
3) JVS-3 Villa Construction Project Dubai, UAE
4) Phase2 Fresh Water Transmission System, Fujairah, UAE
Responsibilities:
• Developing Baseline schedule (level-4) by CPM Planning Method with
budgeted cost weightage (CBS) in Primavera P6
• Preparation of Project Overall and Discipline wise Baseline Planned S Curve
• Preparation of Project Invoicing S Curve
• Identify and prepare manpower requirements in-line with the size and duration
of the project
• Developing of Procedures for planning & project control, project coordination,
progress measurement and invoicing
• Conduct Project Risk Workshop and preparation of Project Risk Register
• Preparation of Engineering Document Deliverable Register (EDDR),
Procurement Service Register (PSR) and Manufacturing & Delivery Document
Register (MDDR) for Progress measurement
• Tracking of Project progress on day to day basis from a planning perspective
to resolve any conflicts.
• Ensuring active engagement of team members by delegation of tasks to the
appropriate person
• Liaison with project stakeholders to collect accurate weekly project progress
• Maintain and update overall schedule progress S-curve, cost S-curve, invoice
S-curve.
• Prepare and issue Monthly, Weekly and 90 days Lookahead plan and follow-
up in line with project requirements
• Weekly Presentation of Programme and Project Critical path with
Management and Company for analysing new risks
• Attend and record Project Meetings and circulate minutes. Follows up on
action plans until closure.
• Monthly Project Invoicing
• Conduct Project Risk Register meeting quarterly for evaluating and Mitigating
Project Risk
• Providing guidance to the planning engineers for preparing daily, weekly &
monthly progress reports
• Setting progress target for discipline engineers in line with planned progress
• Updating progress on EDDR, PSR and MDDR
• Support and engage with Contract team for the preparation of Delay analysis
and EOT.
• Preparation of Project Closeout Report

Lamprell energy, Dubai
Planning Engineer

   Feb 2008
— Feb 2009

Project Title: Refurbishing & Building of New Land Rigs (Nabors, Ensign, WDI, and LTI)
Responsibilities:
• Preparation of Baseline schedule (level-4) with budgeted man-hours in
Primavera P6
• Preparation of Project Baseline S Curve for Overall and Discipline wise S
Curve
• Preparation of Project Invoicing S Curve
• Preparation of Project Risk Register
• Tracking of Project progress on day to day basis
• Updating overall schedule, progress and cost S curve, project performance
trend.
• Weekly Presentation of Programme and Project Critical path with
Management for analysing new risks
• Attending weekly & monthly project review meeting

Punj Lloyd Ltd., Abu Dhabi
Planning Engineer

   Jun 2005
— Jan 2008

Projects Title: ADCO Flow Line Construction and Wellhead Piping Installation
Responsibilities:
• Preparation of Baseline schedule (level-4) in MS Project / Primavera P3
• Preparation of Project Baseline overall progress S Curve
• Prioritise Flow Line and Wellhead material take over from ADCO (Bab13)
store as per the Rig sequence
• Prioritise the wellhead piping prefabrication as per the Rig sequence
• Preparation of Project Invoicing S Curve
• Preparation of Procedures for planning & project control, project coordination,
progress measurement and invoicing
• Preparation of Tracking of Project progress on day to day basis
• Progress measurement and updating overall schedule, progress and cost S
curve, project performance trend.
• Monthly Project Invoicing

Al Turki Enterprises LLC, Oman
Planning Engineer

   Sep 1997
— Jun 2005

Projects Title: DCME&I Engineering Service Contract:- Flow Line Construction, Wellhead Piping Installation and Field Expansion Project for Petroleum Development Oman
Projects completed:-
1) Yibal A Gathering Station Bypass Line
2) Nimr T-4819 (15,000 M³) Tank Piping Project
3) Mussallim Phase I & II Field Expansion Project
4) Mussallim & Burhaan Facilities Construction Project

Roles:- Construction Engineer > Project Coordinator > Planning Engineer,

Responsibilities:
• Preparation of Baseline schedule in MS Project
• Preparation of Project Baseline overall progress S Curve
• Prioritise the wellhead piping prefabrication as per the Rig Sequence
• Preparation of Project Invoicing S Curve
• Tracking of Project progress on day to day basis
• Progress measurement and updating overall schedule, progress and cost S
curve, project performance trend.
• Monthly Project Invoicing

Al Hassan Engineering and Contracting LLC, Oman
Construction Engineer

   Oct 1992
— Dec 1995

Project Title: Mechanical Engineering Service Contract Flow Line Construction and Wellhead Piping Installation Contract for Petroleum Development Oman

Role:- Construction Engineer
Responsibilities:

• Construction of Flow Line from well side to nearest remote manifold or
Gathering Station & Testing (Oil, Gas & W Injection)
• Pre-fabrication, Installation and Testing of wellhead hook-up piping, station
piping & Manifold Piping
• Installation of Road Crossing sections and modification of existing Flow lines
• Attending Emergency works in oil facilities

Al Hugayet, KSA
Mechanical inspector

   Jun 1989
— Jun 1991

Project Title: Engineering & Technical Services Contract with Arabian Oil Company Ltd., KSA

Responsibilities:
• Inspection of the Corrosion Protection activities carried out by contractors in
Onshore and Offshore Oil Installations
• Assessment of Corrosion Monitoring and Reporting the status of Oil Installations.
• Prepare and Issue work order for the corrosion protection activities for Onshore
and Offshore Oil Installations