 Dedicated, resourceful and innovative Electrical Engineer offering an experience of 4+ years in handling Construction, Erection, Testing, Commissioning, Operation & Maintenance of a wide range of Electrical and Mechanical instruments/ equipments/ systems in Solar PV, Hydro, Thermal and Wind sector; best knowledge of Solar PV, Solar CSP, Hydro, Thermal and Wind Power Plants & Substations.
 Currently spearheading efforts as a Substation SCADA Controller (O&M) and Project Engineer (construction) in 200 MW (260MWp) SHUAA Solar PV power plant (Mohammed Bin Rashid Al Maktoum Solar Park Phase II) with NOMAC, Dubai. Previously work as a Senior Electrical Engineer (Plant In-charge) and Project Engineer (construction) with Prodigy Hydro Power (P) Limited, Bangalore.
 Adept in Engineering Design, Construction, Erection, Testing & Commissioning, Operation and Maintenance of Power System for Hydro Power (Turbine, Generator, Power house, Dam, 6.6/33 KV switchyard and 33/132KV substation, 33KV transmission line, etc.), 200MW Solar PV power plant (PV Module, PV Module Structure, 33/132KV GIS substation, RMU, Solar Inverter, Combiner Box, 0.375/33KV substation, etc.) and 12.1 MW Wind Power Plant (Maintenance of 11KV,22KV,33KV substation, Turbine Generator, etc.).
o Performed all pre-commissioning test of Turbine, Generator, Inverter, RMU, Power transformer, CTs, PTs, Relays, panels etc.
o Experience in preparation of cable schedule, cable sizing, and cable tray layout drawings and detailed lighting design.
 Proficient in swiftly ramping up projects with competent cross-functional skills and ensuring on time deliverables within pre-set cost parameters. Expertise in project planning, scheduling, budgeting & performing cost-benefit analysis as per the client’s requirements.
 Ensure compliance with safety requirements and standards procedure in the plant; having an innovative and analytical approach to the work with an eye for detail.

Education

Indian School of Business Management & Administration
Masters of Business Administration (M.B.A)

   Jul 2014
— May 2016

Masters of Business Administration (M.B.A) in Energy Management and Project Management.

National Power Training Institute (NPTI, PSTI),
Post Graduate Diploma in Operation & Maintenance of Transmission & Distribution Systems

   Jan 2013
— Jul 2013

Post Graduate Diploma in Operation & Maintenance of Transmission & Distribution Systems

Dr. M.G.R. University
Bachelor of Technology (B.Tech.)

   Aug 2008
— May 2012

Bachelor of Technology (B.Tech.) in Electrical & Electronics Engineering.

Experience

NOMAC Gulf Solar Energy LLC
Substation SCADA Controller (O&M)

   Jan 2017
— Current

 Presently (after COD of plant) working as a Substation SCADA Controller (Operation & Maintenance) of 200 MW (260MWp) SHUAA Solar PV power plant (Mohammed Bin Rashid Al Maktoum Solar Park Phase II) with NOMAC, Dubai, along with looking after Maintenance and Troubleshooting work of 33/132KV GIS substation, Power Transformer, RMU, Solar Inverters, Combiner Box etc.
 Working with GPM (Green power Monitor) SCADA Software for Monitoring and Troubleshooting the 200MW Solar PV plant and doing analysis to give best performance of the plant. Preparing and generating several reports for monitoring and analysis of the plant and equipments for better performance.
 Working and Troubleshooting for Siemens SCADA WinCC HMI software for substation, troubleshooting for Siemens relay (SIPROTEC-4 and SIPROTEC-5) and SEL relay.
 Ensuring finalization of monthly generation bill, communicating & submitting the bill to DEWA Govt. in the desired form.
 Before 30th March 2017 worked as a Project Engineer in construction of 200 MW (260MWp) SHUAA Solar PV power plant (Mohammed Bin Rashid Al Maktoum Solar Park Phase II).
 As a Project Engineer work with EPC contractor and successfully carried out commissioning work of 2X100MVA Power Transformer, 33/132 KVA GIS substation, 0.375/33KV substation, RMU, Solar Inverter.
 Responsible for execution of PV panel installation.
 Handling product documentation work, report preparation & punch list preparation work.

Prodigy Hydro Power (P) Limited,
Senior Electrical Engineer (Plant In-charge)

   Jul 2013
— Jan 2017

 Worked as a Plant In-charge (Operation & Maintenance) of 2X3 MW Baner II Small Hydro Project and Project Engineer in construction of 2X3 MW Baner II Small Hydro Project, also work in wind and solar project.
 Initiating all the responsibilities pertaining to construction and maintenance work of turbine, generator, hydraulic & lubrication system, panels, Power Transformer, CTs, PTs and Transmission line.
 Preparing shift schedule for the team, which includes 26 members of the Shift team & 3 members from the maintenance team.
 Responsible for execution of electrical project e.g. construction, erection, testing & commission. Supervising execution of all jobs for project like routing of cable trays, cable laying, bill checking of contractor, creating cable schedule, creating control scheme for various operations and installation of Earthing system etc.
 Designing & planning procurement for different kind of equipments for smooth execution of projects at different stages. Handling of switchyard protection system.
 Maintaining proper spares inventory and consumption records of electrical items; maintaining history cards and up-to-date documentations & records of electrical equipments.
 Accountable for maintenance & troubleshooting of all electrical and mechanical parts and replace the faulty parts.
 Carrying out Preventive Maintenance, Corrective Maintenance and Predictive Maintenance jobs in the field as per the planning and record keeping for the same.
 Handling product documentation work & report preparation; coordinating projects with other departments, outside agencies, contractor and consultants.
 Ensuring finalization of monthly generation bill, communicating & submitting the bill to HPSEB Govt. in the desired form; attending meetings with Resident Engineer, Superintendent Engineer of HPSEB Govt. for Project related Issue.