Summary

I am having around 24 years of extensive experience in Boiler (Like PF fired, CFBC, HRSG, Oil Fired, Gas Fired etc.) & Power Plant (Conventional & Combined Cycle both including WSC) commissioning as well.
I can do the Boiler (All type including PF & CFB) tuning by doing fine adjustment of air & fuel, I can guide Boiler Operating personnel for safe & smooth operation of Boiler Plant, can impart training to them, can handle client, can make proper report etc.
Apart from the above I have clear idea about Commissioning Manual Making, SOP writing and was involved in so many projects

Education

KSOU
Degree In Mechanical Engineering

   Jan 2012
— Aug 2014

Passed lateral Entry Degree course in Mechanical Engineering with First Class

Central Calcutta Polytechnic
Diploma In Mechanical Engineering

   Jul 1989
— Aug 1992

Passed Diploma in Mechanical Engineering

Experience

Thyssen Krupp Industry India Pvt. Ltd.
GM-BOILER & POWER PLANT DIVISION

   Mar 2015
— Current

1.Looking after enhancement/improvement of Older Boiler Units
2. Critical trouble shooting of Power Plant
3. Review of Drawings,Operational Logic etc.

BCPL
Commissioning Co-ordinator

   Apr 2012
— Jan 2015

ONGOING PROJECTS/ UNDER COMMISSIONING
ONE NO. CFBC BOILER PROJECT IN INDIA
ONE NO. EPC (WHICH INCLUDES WSC) COAL (CFBC) BASED POWER PROJECT IN INDIA
COMMISSIONING COMPLETED
ONE NO. COMBINED CYCLE EPC (WHICH INCLUDES WSC) POWER
PROJECT IN UAE
ONE NO.COAL BASED EPC (WHICH INCLUDES WSC) POWER PROJECTS IN INDIA
THREE NOS. CFBC BOILER PROJECT IN INDIA

BCPL
Commissioning In Charge

   Jul 2004
— Mar 2012

TOOK LEAD ROLE TO COMPLETE COMMISSIONING ALONG WITH PGT OF THE FOLLOWINGS

TWO NOS. COAL BASED EPC(WHICH INCLUDES WSC) POWER
PROJECT IN INDIA
SIX NOS. CFBC BOILER PROJECT IN INDIA

Mitsui Babcock Energy India Pvt. Ltd.
Sr. Commissioning Engineer

   Oct 2002
— Jun 2004

PLAYED MAJOR ROLE TO COMPLETE COMMISSIONING ALONG WITH
PGT

THREE NOS. PC FIRED BOILER (ALONG WITH WSC) PROJECT IN
INDIA

ALSTOM BOILER SERVICES LTD
Commissioning Engineer

   Jan 2002
— Jan 2002

PLAYED MAJOR ROLE TO COMPLETE COMMISSIONING ALONG WITH
PGT OF THE FOLLOWINGS
ONE NO.OIL FIRED BOILER,
ONE NO.HRSG
ONE NO. AUXILIARY BOILER

Powermax/GRI
Project Engineer

   Jan 2001
— Jan 2001

PLAYED MAJOR ROLE IN BUDGETARY ESTIMATION AND PROMOTION OF PC TO CFBC REVAMPING PROJECT

Mitsui Babcock Energy India Pvt. Ltd.
Commissioning Engineer

   Jul 2000
— Oct 2000

PLAYED MAJOR ROLE TO COMPLETE COMMISSIONING ALONG WITH
PGT
ONE NO. PC FIRED BOILER PROJECT(WHICH
INCLUDES WSC) IN INDIA

ABB ABL PROJECTS LTD.
Service Engineer

   Jan 1993
— Jan 2000

INVOLVED IN COMMISSIONING OF
4 NOS. PC FIRED BOILER ALONG WITH WSC
1 NO. OIL FIRED BOILER ALONG WITH WSC
1 NO. SODA RECOVERY BOILER ALONG WITH
WSC