Summary

EPC MECHANICAL DESIGN FOR SIMPLE AND COMBINED CYCLE POWER PLANTS, PREPARATION OF TECHNICAL SPECIFICATION FOR PIPING DESIGN, CHECKING OF PIPING LAYOUT, PREPARATION & CHECKING OF PIPE SPOOL FABRICATION DRAWINGS, ORDERING OF PIPES AND FITTINGS AS PER ISOMETRIC DRAWINGS, PREPARATION OF TECHNICAL SPECIFICATION & ORDERING OF PIPE SPECIALTIES LIKE VALVES (MANUAL, MOV, RELIEF, PRV, SAFETY & CONTROL), STRAINER, SIGHT FLOW INDICATOR, FLOW ELEMENTS, EXPANSION JOINT, HYDROTEST CIRCUIT PREPARATION, SCHEME PREPARATION OF STEAM BLOWING, WATER BALANCE DIAGRAM, ETC,

Education

Institution of Engineers, Kolkata (India)
Associate Member of Institution of Engineers (AMIE)- Mechanical Engineering

   Jun 2015
— Current

Studying Distance education

GMS-MAVMM Polytechnic college, Madurai (India)
Diploma in Mechanical Engineering

   Jun 2005
— Apr 2008

Finished with First class with honours

Experience

M/s. National contracting company -Power Plant Division, Rezayat Group, Dammam (Saudi Arabia)
Junior Design engineer-Mechanical

   Apr 2013
— Current

▪ Preparation of overall plot plan for combined cycle, Fuel conversion and simple cycle power plant projects (Existing and New).
▪ Preparation of P&IDs for systems like Steam, Water, Oil and Air as per Tender document.
▪ Preparation of heat balance diagrams based on software output for the commercial bid submission in simple and combined cycle projects.
▪ Preparation of water balance diagram and water treat plant layout for simple and combined cycle projects.
▪ Checking and correcting the P&IDs, isometric and Layout drawings of piping for systems like Steam, water, air & oil from consultant in order to match with the system requirements and contract document of owner.
▪ Preparation of solar with combined cycle power plant steam & water circuit schemes and P&IDs.
▪ Preparation of Equipment layout drawing like STG Building layout, WTP Building layout, Air Compressor room building layouts, CCW Area and BFP & Deaerator structure
▪ Preparation of civil input drawing for all mechanical equipment’s
▪ Preparation of Tank GA drawings for Raw water, DM Water, Service water, Potable water and Filtered feed water storage tank
▪ Preparation of pipe size calculation to arrive the pipe size and selection of material based on system of piping and contract requirement for overall systems in the power plant.
▪ Selection of valves and types of valves suitable for the respective system of piping based of contract requirement and system description.
▪ Preparation of Pipe rack, Pipe Trench and Pipe sleepers drawing for combined cycle and simple cycle power plant projects.
▪ Preparation of composite piping layout for overall systems in the power plant.
▪ Preparation of fire piping layout for combined cycle, Fuel conversion and simple cycle power plant projects (Existing and New).
▪ Preparation of pipe spool drawings (steam, water, air and oil systems) with all the details required for shop and construction site.
▪ Preparation of Modification layouts for piping.
▪ Preparation of instruments list for piping in all the systems in the power plant.
▪ Preparation of Insulation details for piping in all the systems in the power plant.
▪ Preparation of shop and field welds quantity list for piping in all the systems in the power plant.
▪ Preparation of Inch dia calculation list for piping in all the systems in the power plant.
▪ Preparation of Hydro test circuit scheme and list by using P&IDs for all required systems in the power plant.
▪ Preparation of water holding capacity calculation list for required piping systems in the power plant for the purpose hydro-test and steam blowing operation at site.
▪ Preparation of material BOQ for piping in all the systems in the power plant.
▪ Preparation of Valves (normal, motorized, relief &control) list for all the systems in the power plant.
▪ Preparation of pipe support list (spring hangers) for all the systems in the power plant.
▪ Preparation of pipe support list (U bolts, clamps, support members) for all the systems in the power plant.
▪ Preparation of special items (strainers, steam traps, flow orifice, flow indicator, filter, utility hose, etc.,) for all the systems in the power plant.
▪ Preparation of Piping and piping supports costing for all the systems in the power plant for commercial Bid Submission.
▪ Preparation of Pipe post and sleepers foundation details drawing to give input for the civil department.
▪ Preparation of Pressure pocket and Thermowell list for required piping system.
▪ Preparation of Steam water analysis system tubing layout and tube tray layout.
▪ Making the list for all the drawings and vendor documents and maintaining the good register to access the needed information at ease.
▪ Clarification of issues about piping from the shop and site with help of my superior authorities.

M/s. Cethar Limited, Tiruchirapalli (India)
Junior Executive - Piping Design Department

   Apr 2010
— Apr 2013

▪ Preparation of Composite piping layouts for integral piping based on Approved P & ID's, boiler GA drawing, TG hall layout, connecting equipment drawings, structural drawings.
▪ Preparation pipe size calculation to arrive the pipe size and selection of material based on system of piping and contract requirement for overall systems in the power plant.
▪ Preparation of Isometric drawing including support location with respect to Approved P&ID's, Piping layout & Stress report.
▪ Preparation of piping loading data drawing at various floor & Submitted to Structural department for further proceeding.
▪ Selection of Economic spring hangers based on Load and displacement in Flexibility analysis report at respective support node.
▪ Preparation of spring hanger schedule as per Flexibility analysis report.
▪ Preparation of piping support drawing Like Spring hanger support (Variable & Constant), Restraint Supports, Guides, Rod hanger supports, Limit stop.
▪ Preparation of inserts plate details (Embedment), Floor cut-out details.
▪ Preparation of Insulation schedule & Erection welding schedule.
▪ Selection of valve dimensions with respect to Valve catalogue, Flange selection as per ANSI B16.5.
▪ End connection checking for connecting equipment’s, pipes, Fittings & Valves before preparation of piping detail drawings.
▪ Rating selection for Forged materials like Elbows, Reducer, Tees, Coupling etc..
▪ Schedule selection for Casting materials like Elbows, Reducer, Tees, Coupling etc.,
▪ Preparation of Design change notes (DCN) as per Shop Design change request (DCR).
▪ Preparation of Erection welding drawing for Easy site reference.
▪ Clarification of issues from the shop and sites with help of my superior authorities.
▪ Preparation of shipping list and summary part list for releasing material to site/shop for fabrication.
▪ Preparation of as made drawings like incorporate of all Design change request (DCR) & Design change notes (DCN).
▪ Preparation of Loading data of Foundation drawing like HP Dosing tank, LP Dosing tank (Ammonia & Hydrazine),CBD & IBD Tank,N2 Blanketing system & Oxygenated treatment system.
▪ Preparation of soot blower piping layout for the Boiler furnace in the power plant.

M/s. Veesons Energy System (P) Limited, Tiruchirapalli (India)
Junior Engineer - Piping Design Department

   Jun 2009
— Apr 2010

▪ Preparation of P&ID's with respect to Contract documents, Deviations if any.
▪ Preparation of Isometric drawing including support location with respect to Approved P&ID's, Piping layout & Stress report.
▪ Preparation of modification drawings as per the request given by the shop and site department.
▪ Worked as planning engineer by monitoring the piping fabrication activities going on the shop.
▪ Preparation of material issue list based on the schedule given to the Production department.
▪ Prepared list of work done by the production department and contractor.
▪ Following up the contractor to finish the job assigned to him as per schedule.
▪ Following up the quality and shipping department to check & clear the job done by the contractor to dispatch the job to the plant as per the schedule.

M/s. Bharat Heavy Electricals limited (BHEL), Tiruchirapalli (India)
Technical Training - Fuel Firing System Department

   Jun 2008
— Jun 2009

▪ Preparation of scheme Diagram for Boiler fuel oil system.
▪ Preparation of valve schedule for Boiler fuel oil systems, (HFO, LFO) AIR & STEAM.
▪ Preparation of Piping Boq for Boiler fuel oil systems, (HFO, LFO) AIR & STEAM.
▪ Preparation of piping layout for Pulverized coal fuel to the mill and boiler furnace.
▪ Preparation of Fan handling arrangement drawing.
▪ Preparation of fuel (pulverized coal) handling drawing.