
PGDC in T & D-NPTI , B.E.- Electrical with 13 Year Exp in EHV Substation
Last Updated: 14th March 2018 (over 4 years ago)
Summary
6.0 years’ experience in Project / Site Management.
2.5 years’ experience in Power Distribution.
Key Skill:
• Proposal/Estimation Engineering
• BOQ Optimization.
• Electrical Substation Design & Construction
• Project Managements
• Project Scheduling
• Strong Presentation Skill
• Billing Cash/Handling
Education
Post Graduate Diploma Course
Oct 2006
— May 2007
(Under Ministry of Power, Government of India)
Bachelor of Engineering
Jul 1999
— Jun 2003
AICTE/UGC Approved
Experience
Project Engineer
Apr 2016
— Current
• Review and ensure Electrical Design Submittal including Design Calculation, Analysis, Installation procedure, Material Proposal/PO as Per the Technical Spec.
• Review, Process & follow up Outage requirements and Responsible for all the work during Outage.
• Monitor, Report & Certify All Activity including Field Testing, Final Testing, Inspection & Checking of The Projects & Provide Commissioning Assistance to the Company.
• To Review and Analyze the Qualification of Sub Contractors proposed by CONST. CONTRACTOR to Perform Detail Design & Construction Work.
• Assist COMPANY in the Technical Completion, Energization, Performance Acceptance & Final Acceptance Activities of Project and in Signing/Issuing of Required Certificate.
Project Details (Executed)
1. 380/115/13.8kV BSP Dhahran South Ph-II, Dhahran (KSA).-Civil, Erection, Testing & Commissioning.
2. 380/230kV BSP Qurayyah IPP-Shedgum Line 1&2 Ext.- Testing & Commissioning.
3. 380/230kV BSP Ghunan-Shedgum Line 2 Ext.- Testing & Commissioning.
Project Manager
Jul 2012
— Mar 2016
• Responsible for schedule and ensure timely completion of all civil & electrical activities.
• Ensure technical compliance with design standards requirements.
• Responsible for costs associated with area of work and ensure that budgeted costs are not exceeded.
• Management of sub-contractor's work.
• Responsible for Project safety Management & Ensure that safe practices are employed by all contractor personnel in coordination with Safety Engineer.
• Verify sub-contractor invoices in accordance with actual work performed and in compliance with the contract, Preparation and Submission of All Bills.
• Cash handling & financial controlling of project funds ,Store management & material handling.
• Liasoning with Local Govt Bodies compiling Statuary Requirement
Project Details (Executed)
1. 220kV Sub-station, GAIL Auraiya (Electrical)
2. 220kV / 66 kV Sub-station, HVPNL Pinjore, Panchkula.
3. 66kV / 11 kV Sub-station, HVPNL, Panchkula.
Manager Engineering
Apr 2007
— Nov 2011
• Responsible to Prepare Optimized Engineering Proposal/Estimation as per Technical Requirements.
• Responsible for Design & Modification of SLD, AIS/GIS Equipment Layout Drawings etc as per Bid.
• Prepare various technical specifications, datasheets, Material requisitions, Sizing Calculations of HT/LT, Battery, CT/PT/, Bus Bar etc.
• Perform Engineering support tasks such as Lighting, Earthing, Lightning CT & PT adequacy, Calculation of DSLP, Sag , as per IS etc.
• Review of Test certificates, Technical bid evaluation, and Vendor drawing review. Apply engineering application software to complete engineering tasks such as ground grid design, transformer sizing etc.
• Communicate and coordinate project activities with project engineer, customer representatives, and others as needed. Provide excellent client/customer service.
• Design high quality templates for tenders and Confirm that proposals meet client requirements.
• Preparation of Technical offer as per Tender Requirement.
As a Site Manager
• Responsible for schedule and ensure timely completion of all Project Activities.
• Ensuring technical compliance of all equipments/ materials prior to delivery to site.
• Responsible for costs associated with area of work and ensure that budgeted costs are not exceeded.
• Management of contractor's work. Ensure that safe practices are employed by all contractor personnel. Promote zero accident philosophy.
• Verify contractor invoices are in accordance with actual work performed and in compliance with the contract.
• Review of commissioning procedures.
Project Details (Executed)
1. 132kV / 6.6 kV Sub-station, Sagar Cement Ltd., Nalgonda.(A.P.)
2. 110kV / 22 kV Sub-station, Enercon Wind Power S/S, Pushuputhur, Coimbatore.
3. 132kV / 33 kV GIS Sub-station, HPCL, Vizag.
Assistant Engineer
Apr 2004
— Sep 2006
• Responsible for Maintenance & Testing of Transformer upto 33kV.
• Maintenance of Power Electrical Equipment in S/S (Transformer, CT, PT etc.)
• Responsible for Maintaining Records of HV Equipment’s Ambient Temp, Winding. Temp, Oil Temp, Load Amps, Voltage & taking remedial measures if found diff.