M.Tech MBA with 15 yrs of Project Management experience.
Last Updated: 19th September 2019 (over 3 years ago)
Summary
I am a Chartered Engineer IEI, Chartered Building Engineer UK and a Professional Engineer from UK and a Chartered Construction Manager from UK.
Education
Master in Civil Engineering
Jun 2004
— Jun 2006
Experience
Planning & Controls Manager
Mar 2015
— Current
Program & Project Management for12 nos. of Hospital projects ranging from 200 Beds to 500 Beds including Housing.(Cost of Projects $1.10Bn)
Client – Ministry of Health, Saudi Arabia
Position Duties & Accountabilities:
• Monitor, and report on, the perceived viability of the main contractor construction schedule (based on realistic assessments of schedule risks i.e. resources, cost; prepare alternatives to correct or avoid schedule variances).
• Maintain focus across a broad range of projects, manage often conflicting requirements.
• Communicating and coordinating effectively with all relevant stakeholders regarding progress, cost, resources, risks, trends, etc.
• Supervise, monitor and inspect engineering & construction activities and respond to consultant and contractor queries.
• Integrating the schedule and earned value management systems to provide the effective transfer of data from the schedule to the EVM systems schedule.
• Continually monitor & review progress to plan and allocated budget using key performance indicators throughout the life of the project.
• Evaluate and prepare tender documents and tender project programme.
• Review contract documents, suggest changes and the addition of new clauses if necessary.
• Review claims, construction project budget, budget adjustments, variation orders, IPC’s, method statements, procedures & specifications.
• Develop engineering procedures, document control, submissions management protocol creation and tracking of RFIs, material samples & other documents
• Preparing risk assessment and mitigation plans and develop document control system and communication flow for the project.
Planning Manager
May 2012
— Dec 2012
World Crest (3B+G+62) Residential Tower (Cost of Project :- $50 M)
Client – Lodha Developer; Consultant – Buro Happold
Balance of Power Plant-23Km Cross Country Water Pipe Line & 15 Km Cross Country Coal Conveyor.(Cost of Project :- $100M)
Client – Monnet Power Company Ltd.; Consultant – Development Consultants Pvt. Ltd
42MLD Waste Water Treatment Plant- Sanad, Gujrat (Cost of Project :- $2M)
Client – FORD MOTOR COMPANY; Consultant- Kajima Intl. Pvt Ltd.
220 KV Substation & 2 Km of Power evacuation (Cost of Project :- $6 M)
Client – Gujarat Energy Transmission Limited, GETCO.
Position Duties & Accountabilities:
• Preparation of detailed CL-8.3 & Look Ahead programme in Primavera 6.0 with proper logic and flow of the work in order to meet significant milestones.
• Responsible to control and monitor project total expenditure including verifying and checking of invoices and claims from suppliers, vendors and subcontractors to ensure that all project expenditures are captured and properly recorded.
• Review and understand the Scope of Services and General Conditions of Contract. Establish the tender project programme.
• Keep track of materials & equipment ordered/procured, review the item pending receipt.
• Supervise engineers, technicians and review and approve submittals, calculations, designs and cost estimates.
• Provide planning and cost controlling support for all projects which includes variation reporting, monitoring of milestone progress to the preparation of customer billing processes.
• Prepare reports, construction project budget, tender documents etc.
• Respond to any contractor programme enquiries that arise.
• Sub-Contractor management system, finalization of contracts/ work orders.
• Coordinate labour resources, procurement and delivery of materials, plant and equipment.
Sr. Planning Engineer
Jun 2008
— Feb 2012
Client – Ministry of Health & Ministry of Works, Bahrain; Consultant - AHDG
Bahrain International Airport (Cost of Project :- $10M)
Client – Bahrain Airport Company; Consultant - MACE
Tabreed Tower-District Cooling Plant @ Diplomatic Area .(Cost of Project :- $ 48M)
Client – Tabreed Bahrain; Consultant – MACE & Gulf House Engineering
Bahrain Map Junction Interchange (Cost of Project:-$36M)
Client – Ministry of Works, Bahrain; Consultant - Parsons
Position Duties & Accountabilities:
• Provide dates for completion of the Employers construction drawings.
• Assess the impacts of proposed Employer design changes, and where necessary make recommendations to mitigate any time implications.
• Identify project resources constraints and utilization studies of key plant. Verify that actual resources meet planned resources. Preparation of S curve.
• Analyze alternative construction options where required.
• Preparation of detailed CL-8.3 & Look Ahead programme in Primavera 6.0 with proper logic and flow of the work in order to meet significant milestones.
• Preparation of Method Statements and submission documents.
• Updates the Project Programme when necessary and ensures that the contents are effectively communicated.
• Determines the rate of progress through analysis and KPI assessments and takes action where the Programme is projected to show delay.
• Attend progress/technical/coordination meetings & preparation of MIS
• Prepare Risk register, claim programs/delay analysis for extension of time.
• Assist in the evaluation and make recommendations in respect to subcontractor extension of time claims.
Planning Engineer
Jul 2007
— May 2008
Sir Bani Yas Island 5 Star Resort & Break Water Project.(Cost of Project :- $120M)
Client- TDIC -Abu Dhabi; Consultant – Turner & Townsend/Norr Group
Dubai Bypass Phase IV .(Cost of Project :- $105M)
Client – RTA Dubai; Consultant - Parsons
Position Duties & Accountabilities:
• Ensures effective coordination of all project execution activities taken up by different functions such as Civil, Mechanical, Electrical and Instrumentation
• Preparation of material & documents submittals to client/consultant & follow up for approval, Attend progress meetings & record minutes of meeting.
• Study of tender documents and drawings.
• Preparation of detailed CL-8.3 & Tender programs in Primavera ver. 5.0/6.0.
• Resource Histograms, Cash flow, Reports, Planning Scheduling of project site using Primavera 5.0/6.0.
• Prepare the plans and schedule the resources required to meet the project execution requirements in liaison with Construction Manager.
• Preparation & updating the weekly & monthly progress reports.
• Claim programs for extension of time, cost control of project site by calculating variance
Structure Engineer
Jul 2006
— Feb 2007
Khursaniyah Upstream & Downstream Pipe line project.
Client: ARAMCO
Position Duties & Accountabilities:
• Worked on the projects of “Saudi Aramco” for designing the supports and platforms for the petro chemical setup
• Preparation of MTO of pipe supports structural platforms, anchor blocks etc, checking structural drawing with piping drawing.
• Preparing quality assurance check list for drawings;
• Plan workload and type of work for other team members efficiently and ensure timely completion of the job.
• Provide guidance, technical backup & direction to design team Draughtsman/Designers for structural design.
Planning Engineer
Jul 2000
— May 2004
Construction work under the Uttar Pradesh State Road Project for package no. UPSRP/RMC/37 (Kasganj-Hathras).
Installation & Supply of Sewer, Drainage pipeline & House connections
Client: Public Works Department
Construction of internal road network for Aligarh Muslim University
Client: Aligarh Muslim University
Position Duties & Accountabilities:
• Preparation of proposal & MIS for projects
• Project Supervision & Coordination and keep track of materials & equipment.
• Strictly monitoring the progress of work for timely completion of project
• Preparation of methodology operation of temporary structure to suit construction and operation cycle.
• Preparation of RFIs, NCRs and IRs and follow up the closure.
• Supervise resources & preparation of Bill of quantities and monthly invoices.