Power plant shift superintendent,Process hazard analysis,risk assessment


Last Updated: 22nd May 2017 (over 5 years ago)

Address
India

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
25 to 34

Qualification Level
Degree

Languages
English, Gujarati, Hindi

Summary

05 days Trained in Process Hazard analysis by M/S dupont at RCP Mumbai.
02 days' Work shop for Root cause analysis/ Failure Analysis by M/S Shell 
Participated in Process Excellence summit by  International Quality & productivity center, Bangalore
Pursuing Six sigma green belt training through Reliance certified green belt (Completed project: Steam load reduction. Ongoing project: Shutdown time reduction)
Team Lead for Process Hazard analysis of system, FMEA, Hazop study.
Active Participation in Process Safety Management functioning, Audit Close outs 
Working as a Plant Safety Representative.

Education

Birla Vishwakarma Mahavidyalaya
B.E Mechanical

   Nov 2000
— Jun 2004

Experience

Reliance Industries Limited
Shift superintendent-Captive power plant

   Aug 2007
— Current

Co-Ordination of Start-up / shut down of Machines through control system from field & Panel.
Operation of  GE/BHEL & Neuio Piegnone make Gas turbines(9*30),GHH Borsigh make (6*30) Steam Turbines, (6*125 TPH) ,Thermax make auxiliary boilers and 9*125TPH bhel make Hrsg, Balance Of Plant.
Erection & Commissioning of 110 MW Gas turbine & 275 TPH Heat recovery Steam generators.
Responsible for optimize controlling, fault finding, trouble shooting and handling all  emergency  equipment  and take necessary action about them. Handle all types of emergency and control it.
WHY-WHY Analysis  and make forward path and generate FIR-FAR 
Participate Daily meeting for discuss about plant major issues, planning, modification and Day to day planning for normal defects and Preventive Maintenance. 
  Handling  major & Short  shutdown of  GAS TURBINES(C.I,HGPI,MI) STEAM TURBINES, BOILERS(IBR)
Boilers water analysis and take necessary action about them
Responsible for  Major  Syn Gas modification in Gas turbines, HRSG & Aux boilers.
Handling  audits and document update for  ISO-9001:2001.ISO-14001:2004,OSHAS 18001:2007
Dealing with inter department for steam balance   and water balance and maintain quality norms of all  CPP customers
Leader of OHSAS-18001, Audit (Internal & External (BVQI,OISD)) close outs, SOP & SOC review of running system.
Incident Investigation that occurred in CPP plants and similar industries for attorneys and regulatory agencies.  Determined the root causes based on the evidence, Recognized and Generally Accepted Good Engineering Practices and federal regulations.  Prepared finding reports.
Leader in Process Hazard analysis, Guiding team in Structured what if,LOPA for worst case scenarios,  QRA through PHAST 6.7 & developing recommendations.
Working as a Plant safety Representative. Conduction Plant Safety sub committee meeting with contract workers, Preparing & Sharing LFIs( Learning from Incidents) as per Operating Management system(OMS) Guidelines.
Team Lead in Risk Management analysis. Preparation of Job specific risk analysis through kinney & fine Method ( TBRA & CBRA)
  Pursuing Six sigma green belt training through Reliance certified green belt (Completed project: Steam load reduction. Ongoing project: Shutdown time reduction) 
  Participated in Process Excellence summit by  International Quality & productivity center, Bangalore    
  02 days' Work shop for Root cause analysis/ Failure Analysis by M/S Shell ·    
  05 days Trained in Process Hazard analysis by M/S Flour at RCP Mumbai.

Chambal Fertilizers and chemical limited
Shift Engineer - Offsite and utilities

   Apr 2007
— Aug 2007

Operation of 40 MW gas turbine, Naphtha fired aux boilers, Tank farm area, DM Plant, ETP, WTP, Cooling towers, Boiler feed pumps.
Training & Development for Employees in Work place safety & Process safety management.

Vardhaman Acrylics Limited
Shift Engineer Power Plant

   Jul 2004
— Mar 2007

Nature of Job: Operation and Maintenance of Thermax make 42 TPH HP AFBC Boiler and 5.5 MW Triveni make Back Pressure Condensing Turbine.
Pneumatic Ash handling unit, Paharpur make Cooling tower and 1250 kva Cummins make DG sets.
Maintenance of 100TPH Impact crusher and Coal Handling system, IAEC make 33TPH & 11.5Kg/cm2 Low Pressure boiler as a stand by 
Independent handling of Plant improvement opportunity projects, Quality circle & Encon projects.
Managed documentation of and training on production procedures and work instructions.

Search Jobs by Industry

Ad
Ad
Ad