Summary

Total 7 years of experience for piping construction work for power plant, include piping construction management to complete as per project schedule. Plan and setup the target of work completion. Monitor and strongly advise all engineers, supervisor, workers and contractors to be conducted on proper working method.

Education

Mahanakorn University
Mechanical Engineer

   May 2008
— Mar 2012

Experience

Thai Jurong Engineering Limited
Piping Lead Engineer

   Jan 2018
— Current

PROJECT NAME : BERKPRAI COGENERATION PROJECT (97 MW)(EPC).
- Organize piping section for all construction activity to complete in time schedule and handover to commissioning team.
- Follow up the drawing with engineering to submit to the owner and check status AFC drawing before start construction work.
- Monitor the piping system to be completed and handover to the commissioning team such as HRSG system, GT system, STG system, Gas engine system, WTP system and BOP system like cooling system, natural gas system, oil line, air system, chemical system, fire water etc.
- Monitor and strongly advise all engineers, supervisor, workers and subcontractor to be conducted on proper working method.
- Prepare for piping work such as piping erection, BOQ, MOL, method statement for installation and testing, etc.
- Plan and set up the target of work completion(1 Year schedule).
- Clarify and do problem solving with management all related issues at site.
- Make sure the design and method were used in alignment with the prescribed code and standard.
- Coordinate with the piping designer and project owner on development of construction work.
- Monitor on safety environment while the construction is in progress until end of the project.
- Cost control for piping section.
- Draff a contract and select the contractor for plant site.
- Monitor critical activities based on the project schedule and advise project management.
- Monitor day to day on work progress and prepare the actual progress report update to management.

Jurong Myanmar Engineering Limited at Myanmar
Piping Lead Engineer

   Mar 2017
— Dec 2017

PROJECT NAME : MYINGYAN 225 MW COMBINED CYCLE POWER PLANT (MYANMAR)(EPC).
- Organize piping construction work, plan and set up the target of work completion.
- Monitor to complete the system and handover it to the commissioning team.
- Review and check the drawing and clear all issues related before passing it to downline.
- Prepare for piping work such as piping erection, MS, material quantity for ordering.
- Make sure the material delivery from Thailand to Myanmar at site on time.
- Make a decision when the problems are occurred at site and also coordinate with management levels to soft the issue of construction.
- Monitor and strongly advise all engineers, supervisor and workers to be conducted on proper working method.
- Coordinate with the piping designer and project owner from time to time on development of construction work.
- Monitor on safety environment while the construction is in progress until end of the project.
- Monitor the piping system to be completed and handover it to the commissioning team such as HRSG system, GT system, STG system, WTP system and BOP system like cooling system, gas system, oil line, air system, chemical system, fire water etc.

Thai Jurong Engineering Limited
Piping Manager

   May 2015
— Mar 2017

PROJECT NAME : LM6000PD Gas Fired Co-Generation Facility Rojana SPP3 Project, Ayutthaya, Thailand. (112 MW)(EPC).
- Plan and set up organization chart for piping section.
- Plan and schedule the target of work completion.
- Monitor and strongly advise all engineers, supervisor and workers to be conducted on proper working method.
- Make sure the design and method were used in alignment with the prescribed code and standard.
- Clarify and make a decision when the problems are occurred at site and coordinate with management level to soft the issues.
- Coordinate with the piping designer and project owner on development of construction work.
- Monitor on safety environment while the construction is in progress until end of the project.
- Review specification for mechanical and piping material before ordering.
- Take care of painting and insulation work.
- Support waranty work for Ratchanaburi project and Rojana SPP2 project.
- Estimate cost for additional work and present to owner.
- Design piping routing at site and update to engineering.
- Claim the additional work to the vendor in case of drawing not matching during construction work.
- Prepare the method statement for piping (Erection and Dismantling) work.
- Progress update to management.

Thai Jurong Engineering Limited
Mechanical&Piping Engineer

   May 2013
— Apr 2015

PROJECT NAME : Ratchaburi World Cogeneration Project, Ratchaburi, Thailand. (215 MW)(EPC)
- Responsible for mechanical and piping construction activity.
- Mechanical activity such as pipe rack installation, HRSG anchor bolt setting and equipment on base, GT anchor bolt and equipment on base.
- Piping Activity such as fire water system, service water system, cooling system, air system, natural gas system, oil system, waste water system, steam system, etc.
- Control material of mechanical and piping in stock.
- Prepare the mechanical, piping, civil and QA/QC work.
- Estimate cost for additional work (if any) and present to the owner.
- Monitor on safety environment while the construction is in progress until end of the project.
- Design piping routing at site and update to engineering.

Thai Jurong Engineering Limited
Mechanical&Piping Engineer

   Mar 2012
— Apr 2013

PROJECT NAME : LM6000PD Gas Fired Co-Generation Facility Rojana Phase 5 Project, Ayutthaya, Thailand. (44 MW)(EPC)
- Responsible for all mechanical and piping construction activity.
- Boiler installation and also coordinating with commissioning test.
- Gas turbines model installation, alignment & setting, Exhaust diffuser & load, coupling installation & setting, GT enclosure, GT air filter, GT inlet duct, and also coordinating with
commissioning test.
- Aux equipment installation and alignment like cooling pump, feed pump, gas compressor, demin pump, etc.
- All piping system installation & setting.
- Control material of mechanical and piping in stock.
- Order the material and follow up the material delivery to site.
- Take care of painting, insulation and QC work.
- Follow up the work progress as plan given by site management.
- Ensure strictly all works are running on safety rule & regulation.
- Design piping routing at site and update to engineering.
- Claim the additional work to the vendor in case of drawing not matching during construction work.