Mechanical Project Engineer with 17+ years of experience in Oil & Gas Industry.


Last Updated: 8th February 2018 (over 4 years ago)

Address
Iraq

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Masters

Languages
Arabic, English, Hindi, Russian

Summary

I am BTech,MBA Mechanical Engineer 17.6 + years of rich experience in EPCM Project, Plant Construction & Maintenance Management,Shutdowns,Planning,Schediling(MSP 2010,Primavera-P6),Estimation,Bidding,Relationship management, Time Management encompassing Heavy Fabrication, Erection (Structural Steel, Process Equipment's
( Static/Rotary),Tankages,Vessels,Reactors,Heat Exchangers etc.), Piping(A/G,U/G-Process, Utilities, Power Piping etc.),Insulation, Installation,Precommssioning,Commissioning in various plant, process equipment’s in various industries like STEEL PLANT, Chemical Plant, Cement Plant ,Oil & Gas, Refinery, Petrochemical, Experimental clusters,JUDR,Sectors etc.in India,Kuwait,West Africa, Qatar,Abudhabi,Kazakhstan etc.

Education

Welingkar Institute of Management & Research
MBA/PGDM-Operation Management

   Jan 2015
— Dec 2016

Studied Operation Management

Karnataka State Open University
BTECH-MECHANICAL ENGINEERING

   Mar 2013
— Dec 2015

BTECH-MECHANICAL ENGINEERING

Experience

China Petroleum Engineering & Construction Corporation
Site Team Leader

   Jan 2018
— Current

China Petroleum Engineering & Construction Corporation, Abudhabi-UAE/Iraq
As a Project Leader for Basra Gas Rehabilitation Project (BGC),Rumaila from Jan-2018- till date

Heading Current Project: FWKO-Free Water Knock Out at Markazia-DG8, Qurainat-DG11
Accountable for:
• Ensuring proper Site Management. Achieving Daily, Weekly Progress.
• Continual interaction with Construction team on any clashes, bottlenecks, clearance, confirmation etc.
• Responsible for Successful completion of Project on Time, within Budget, with Safety complying Quality & Environmental Standards.
• Providing technical Support to Design, SCM team, Estimation, Bidding during all the phases of the Project.
• Accountable FOR Material Management, Resource Management, Planning, Client Relationship Management etc.
• Responsible for originating Method Statements,HITRA(Hazard Identification Task Risk Assessment),SOW(Scope of Work,MTO,Estimation etc.

Dolphin Oilfield Equipments LLC-UAE
Project Manager

   Apr 2017
— Dec 2017

EPCM Project for Engineering, Procurement, Fabrication, Installation, Inspection, Precommissioning, Commissioning (Chemical Cleaning),E&I of Interconnecting Pipeline Project for Oxygen, Nitrogen & RO Water Lines for Client: Emirates Steel -UAE
Contract Value > AED 30 Million

• Ensuring HSE, PTW Procedure, TBT for all Field related Activities.
• Track high Project cost assets and find ways to reduce losses through root cause analysis, obtaining approvals and facilitate implementation.
• Providing timely Site Clearance to Engineering Consultant to expedite Designing & detailing.
• Reviewing & Approval of JMS, TRA prior to start Cold Work, Hot Work, Height Work, Confined Space work.
• Manage the process of development and improvement of the methodology.
• Providing process technical expertise to Operations, Projects and Maintenance groups.
• Participate in the development of design and installation specifications along with commissioning plans.
• Collaboration with project engineering to ensure the reliability and maintainability of new and modified installations.
• Ensuring key engineering documentation, procedures and activities are maintained and carried out in accordance with Company Management System.
• Directing, Planning, organizing the process of competence formation in the area of project execution.
• Achieving weekly, Monthly Planned target, through daily Field Meeting with Sr.Engineers, Supervisors, daily look ahead plan includes all necessary required Resources viz Manpower, Material, tools & tackles, Equipment’s, Consumables etc.
• Self-Preparation, Submission of Weekly & Monthly Progress with ‘S’ Curve, Measurement Sheet, Construction Weightage Sheet,Manhours,Critical tasks,Equipmen logged Hours,Nearmiss Record, Unsafe Act, Unsafe Condition to Client through Communication Matrix.
• Self-Preparation, Submission & Approval of Overall Project Schedule, Recover Schedule, Look Ahead Schedule.
• Providing inputs to Estimation for calculation of Man-hours for Fabrication, Installation, Painting etc.
• Providing inputs to Procurement department with correct specification of various Material Structure, Piping, Valves etc. prior to place P.O.
• Attending Every Weekly Progress Review Meeting with Client.
• Ensuring key engineering documentation, procedures and activities are maintained and carried out in accordance with Company Management System.
• Follow up with Suppliers for timely delivery of Material, Progress, Providing Fronts to Sub cons.
• Working in ASU (Air Separation Units)
• Develop and maintain positive and productive relationships within departments.

Search Jobs by Industry

Ad
Ad
Ad