Graduate Civil Engineer with 14 years of Experience


Last Updated: 22nd January 2018 (over 4 years ago)

Address
Qatar

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Masters

Languages
English, Hindi, Punjabi

Summary

Multi-tasking Civil Engineer with over 14 years of qualitative experience in mixed construction activities, formulating strategic plans of civil engineering projects; established entire operations with key focus on profitability of Highway Engineering, Quality Control/Quality Assurance, Day to day planning, Execution, Monitoring & Controlling of Structural/Architectural works of Bridges, Interchange, Expressway, Vehicular Underpasses/Tunnels, Light Rail Transit Tunnel, Micro-tunnels, Utility Compound, Substations, Low-rise and high-rise buildings.

Education

Delhi Institute Of Engineering Studies
BE - Civil Engineering

   Aug 2007
— Jul 2009

Passed in 1st Class

GB Pant Polytechnic
Diploma in Civil Engineering

   Aug 2000
— Jul 2003

Passed in 1st Class

Experience

CDM Smith
Structural Site Engineer

   May 2015
— Current

Project : P-003 Lusail Expressway (including LRT tunnel (1.1 Km), Artscape (Steel Structure, Now Al-Wahda Arches), Micro-tunnel, Utility Compound, Substations & Utilities channels)
Client : Ashghal (Public Work Authority, Qatar)
Cost : 5.5 Billion QR

• Sound understanding of the design of Tunnel (Vehicular/Rail) , bridges, interchanges, and any other structures as part of project.
• Proven aptitude to analyse, structure, formulate / implement strategies and achieve operating goals while balancing risks.
• Completed projects such as Vehicular Tunnel/Underpasses, Major and Minor Bridges, Interchange, Light rail transit tunnel, Utility Compound, Substations, Buildings (High-rise) and Cross-Drainage structures.
• Skilled in supervising smooth and timely execution, Quality Control/Quality Assurance of the project requirement schedule based on master schedule.
• Maintained extensive knowledge of construction codes, specifications, and regulations from numerous authorising committees or governing bodies; simultaneously manage multiple projects and frequently finish ahead of schedule as a result of effective staff development and motivation and workload planning.
• Promoted to simultaneously manage multiple projects while supervising all aspects of contractors & subcontractors. Responsibilities including execution, inspection and Quality Control/ Quality Assurance.
• Supervised all construction activities including planning, execution and monitoring of the projects on Daily/weekly/Monthly Basis; providing technical inputs for methodologies of construction in coordinating with site management activities
• Conducted site management including environmental reporting, summer and winter preparedness plans, construction inspections, perimeter security inspections, rodent trap inspections, and fire suppression system reporting.
• Worked closely with Project Managers/SRE/RE/ARE and Delivery engineers regarding constructability, timing, costs, and quality; reviewed performance against operating plans and standards, providing reports to subordinates on interpretation of results and approving changes in direction of plans.
• Review of work shop drawing submitted by the contractor and preparing CR sheets and submits to the Resident Engineer.
• Review of Method statements for the structural works.
• Checking the site quality done by contractors and issuing NCR & SVR and making key notes.
• Coordinate with the implementation of projects, ensuring that the performance is in accordance with their respective scope of services and conditions of contract.
• Review / Implementation of contractor/sub-contractor ITPs, QA/QC Plan, Construction Quality Program(CQP), procedures to confirm compliance with contractual requirements. Ensures correct version of contract documents and drawings are used.

DSC Ltd.
Various ( Starting from Sr. Engineer, promoted to Sr. Manager)

   Jun 2006
— Mar 2015

Project(A) : Kundli-Manesar-Palwal(KMP) Expressway, Haryana, India
Client : HSIIDC
Cost : 3000 Cr. ~ 468 Mn. USD

Project(B) : National Highway 8, Haryana, India
Client : National Highway Authority of India
Cost : 900 Cr. ~ 140 Mn. USD

• Construction of two 8 lane twin deck canal crossings (5 Nos Bridges)
• Site installations, traffic diversions, marine and cofferdam construction, in multiple stages.
• Site clearance, demolition and removal of two existing canal crossing structures
• Very deep excavations in top soil/reclaimed land, predominantly in very hard rock, necessitating extensive shoring and dewatering regimes for extended periods
• Surface water drainage, pumping stations, underground reservoir tanks, outfalls
• Foul water sewerage and treated sewerage effluent networks
• Road works, pavement construction, kerbing, footpaths
• Checking and approval of shop drawings for piles, Diaphragm walls, Secant piles, Jet grout piles, Post –tensioning and pre-tensioning associates and their layout, pile caps, pier shafts, pier caps, Elastomeric bearings, abutments, waterproofing, test pile etc. as per approved design drawings and contract documents (employer requirements etc.)
• Checking and approval of method statements for concreting of the above said structural members, Pre-cast segments casting for Segmental bridges, Pre-tensioned I-girder casting and erection, bearings installation, concrete repairs, waterproofing, segment erection, temporary and permanent post tensioning works, geometry control, cracks repair, Loads and other test on piles etc. as per approved specifications and contract documents (employer requirements etc.)
• Monitoring and comparing contractors work progress as per approved base line programme and working programme.
• Confirms adherence to construction specifications and safety standards by monitoring project progress; inspecting construction site; verifying calculations and placements.
• Co-ordination with Architect, Consultants & contractors.
• Laisioning with other Engineer’s to ensure the implementation of correct QA/QC procedures in construction.

Ad
Ad
Ad