Summary

I have over 17 years of experience in Mega industrial projects in the field of Oil/Gas and Petrochemicals. Responsible to assure completing the project on schedule, within the budget and in accordance to safety and quality requirements as outlined in the project and contractual documents.
I have good experience in design review, construction supervision/management, inspection and quality assurance, pre- commissioning/commissioning and start-up of the project.
During my career, I have supervised multi discipline in engineering field such as civil, mechanical, electrical and communication and received several certificates of appreciations for my excellent work in supporting and successful completion of the projects.

Education

King Fahd University of Petroleum & Minerals (KFUMP)
Applied Mechanical Engineering

   Jun 1993
— Aug 1999

Bachelor of Science degree in Applied Mechanical Engineering.

Experience

AMCDE
CONSTRUCTION MANAGER

   Oct 2012
— Current

Assigned to Sadara- Isocyanates Plant Project at Chem-II with Project Management Team (PMT) through the sponsorship of AMCDE.
I have assigned to work as:

Construction Manager.
Duties and Responsibilities:
 Consistently manage the construction activities for the projects and ensure contractor and sub-contracts construction activities are performed in accordance with execution plans.
 Investigating reasons for less than satisfactory performance for contractor and sub-contracts and provide recommendations for improvement
 Conducting delay progress review meeting with construction teams and contractor to identifying bottlenecks for construction progress and proactively removing them.
 Coordinate with the several contractors, suppliers, and third parties on site
 Manage and develop a high performing of safety and construction team and task them in accordance with their job requirement.
 Serve as the lead company representatives to manage interfaces with other projects for construction related activities such as tie-ins and equipment movement and also with other stakeholders.
 Verifies and approves monthly construction progress report versus plan for contractor payments to control the budget.
 Review and approved the EPC contractor method statement before executing new job.
 Provides daily construction highlights and weekly reports.
 Review the monthly forecasts and progress report and assure that it is accurate and timely then report areas of concern which could produce schedule negative impact to management.
 Review the two weeks look ahead plans to monitor time schedule and milestones.
 Oversee and direct all activity to requirements of the company quality program and ensure that quality procedure requirements are met.
 Identified and communicate the non-conformances report to all construction teams to prevent recurrence within project activities.
 Participate and monitor the final inspection of works before advising the acceptance of the completed work to the client.
 Identify and analyze quality problems then implement appropriate course of action.
 Assists in field investigation of project claim issued by contractor then ensures that all construction changes have been discussed, agreed upon, negotiated and implemented accordingly.
 Develop the safety culture on the project and leading by example such as actively participating in safety walks and often attends tool box talks and in HSSE training.
 Monitoring and controlling the EPC contractor to achieve a healthy and safe environment (HSE) by ensuring that HSE is understood and implemented by all contractors supervisor.
 Lead the safety team in verifying and ensure the required permits and licenses are obtained before starting the work.
 Completing the projects by handing over to the client all required documents such as As-Built drawing quality control documentation and project record Books.

Al-Hugayet Contracting and Establishment
Project Engineer

   May 2006
— Oct 2012

Worked for Saudi Aramco at North Area Project Department (NAPD), Participate in the following projects
BI-10-00708(Replace Online Analyzer)
BI-10-00054(Control Sulfur Emissions)
BI-10-00095(Upgrade Wastewater Treatment System)
BI-10-00188(Replace Emergency Shutdown System)
Responsibilities:
-Coordinate between the designer, contractor and client to implement smooth handing over of projects
-Work closely with the client and act immediately on their concern to ensure their satisfaction
-Review design drawings against site actual condition and recommend revisions in cases of discrepancies
-Processing the approval of contractor's technical procedures, waivers and other
-Prepare material order request as needed at field and contact suppliers to follow up the material arrival schedule.
-Monitoring the site progress against project schedule and assist in preparing the revise schedule to meet milestone dates
-Assist in issuing the change orders by preparing scope of work, company estimates, and participate in the negotiating and finalize the change order bids
-Control contractor’s payment by valuate the completed works against the plan progress
-Manage construction superintendent team by giving specific tasks and delegating responsibility after identify role and goals of the team
-Evaluate contractor technical inquiry, resolving quality issues and closing non-conformance report (NCR)
-Arrange weekly meeting to discuss and resolve the construction concerns
-Prepare weekly report and the remaining scope of work to the top management.
-Provide leadership and technical direction to skilled labor performing work on the site.
-Maintain safety mindset and ensure all safety procedures are maintained to meet project HSE goals.
-Ensure all punch items are completed and cleared to sign the Mechanical Completion Certificate (MCC) on schedule
-Completing the projects by handing over to the client all required documents such as As-Built drawing Quality Control documentation

Al-Hugayet Contracting and Establishment
Construction Superintendent

   Mar 2001
— Current

Work for Saudi Aramco at North Area Project Department (NAPD)
Participate in the following projects at Berri Gas Plant
BI-10-00096(Upgrade of Reverse Osmosis Plant)
BI-3182(Co-Generation Project)
BI-3150(Ethane & NGL Recovery)
Duties and Responsibilities
-Oversight of the day-to-day construction activities to ensure projects activities are matching schedule
-Check the drawings against site actual condition and recommend revisions in cases of discrepancies
-Review and verify the material take off against the drawings and perform revisions if required
-Review suggested modification to facilitate and getting the approval where required
-Participate in identifying manpower required to assure timely completion of project
-Interface with the contractor to ensure latest design changes are incorporated in the construction activities
-Maintain safety measures by ensure that safety rules and regulations are communicated to the workforce
-Supervise the equipment installation in accordance with Aramco and safety procedures
-Monitoring piping fabrication, welding and erection. Reviews and verify Tie-in and Hydrotest packages
-Supervise Tie-in and Hydrotest execution and coordinate with client for system shutdown if required
-Supervise all civil work such as area preparation, pipe rack foundation, manhole, and Buildings by monitoring the excavation, formwork installation, the rebar work, concrete pouring and backfilling
-Monitoring the erection of structural steel in accordance with the approved vendor drawings
-Conduct field inspections to ensure work completed before requesting other Saudi Aramco party to witnessing
-Response and close on the logbook item initiated by project inspection team and coordinate with contractor to avoid it in the future
-Monitors material deliveries and ensures that materials received meet the specifications
-Ensure the proper update and availability of the current drawings and equipment data sheets

King Wilkinson
Mechanical Engineer

   Feb 2000
— Dec 2000

Working for Saudi Aramco project and assigned to work as:
I. Mechanical Engineer:
Duties and Responsibilities:
- Performs site survey to determine site conditions in association with lead engineers.
- Prepared as-built modifications designed drawings and perform engineering working drawings from rough sketches.
- Prepare preliminary pipeline drawings required for construction.
- Prepare isometric pipeline with material-take-off.
- Review the required piping fittings such as flanges, elbows and valves need to be order.

II. CADD Designer:
Duties and Responsibilities:
- Work experience in Intergraph / Microstation 95 CADD (Computer Aided Design Drafting) network in two-screen monitors system version 5.0 especially in:
 - Piping and Instrument Diagram (P&ID).
 - Electrical One Line Diagram (E1L).
 - Instrument Loop Diagram (ILD).

Ad
Ad
Ad