Planning/Project Engineer with PMP certification, fourteen years of experience


Last Updated: 26th July 2018 (over 4 years ago)

Address
Oman

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Degree

Languages
English, Hindi

Summary

Planning/Project Engineer with PMP certification, fourteen years of experience in the functional domain of Integrated Planning, Shutdowns, Project Management, Maintenance, Co-ordination, Scheduling and MIS.

Presently working as Coastal based Senior Planning/Project Engineer with WorleyParsons-Arabian Industries (JV), in Integrated Maintenance Contract of PDO South Oman

Key Skills

• Integrated Scheduling and Planning.
• Project Management and Control.
• Shutdown planning and management
• Maintenance, operations and logistics management
• Project management tools like primavera, MS projects, PERT master.
• Reports generation and Analysis.
• Asset risk management and risk analysis
• Stake holder management

Education

TKM college of Engineering
B Tech Mechanical Engineering

   Oct 2000
— May 2004

B Tech Mechanical Engineering - Kerala University

Experience

Project Engineer / Senior Planning Engineer, WorleyParson-Arabian Industries JV, Muscat, Oman
Senior Planning_ Project Engineer

   Jan 2017
— Current

Handling the south Oman tank maintenance, static equipment maintenance jobs from the planning stage to close out stage. Taking care of the responsibilities from Initial preparation of scope, budget for the work, and estimated forecast of the value of work done. Preparation of schedule, planning packages to take the maintenance, project jobs. Analysis of the work progress and lead the team to achieve the target. Involving in lean model to achieve optimization in cost and efficiency of work. Identify and evaluate the options of strategy, methods. Critical path analysis, variance & delay analysis of schedules and work programs.

Achievements: - Safe and successful completion of 2017 do ability, completion of 15 tanks maintenance. Development of lean and SOP for the tank maintenance works.

BG India, Mumbai, India (Shell)
Integrated Activity Planning Engineer, BG India, Mumbai, India (Shell)

   May 2014
— Dec 2016

Development of Asset 8 Year plan, 3 year & 90 Day to support the business and functional heads. Closely associated with Department heads, planners for preparing, consolidating long term resource loaded functional plan in line to the business plan and integration of the same for effective safety and productivity. Schedule analysis to production engineer for accurate production forecasting. Working as Asset shutdown planner to support the shutdown management inline with OSCAR process. Develop individual shutdown schedules, manpower histogram & do schedule risk analysis. Identifying the planning risks & opportunities in time, prioritize the activities and de conflicting of future plan to achieve cost reduction and highest accuracy for the projects, well Engineering & operation/maintenance jobs. KPI analysis and taking necessary action to improve the planning process. Conduct SIMOPS, risk assessment of the activities and Interface between project and operations to execute the job efficiently.

BG India, Mumbai, India
Integrated Activity Scheduling Engineer

   May 2011
— May 2014

Project Engineer / Senior Planning Engineer, WorleyParson-Arabian Industries JV, Muscat, Oman

Handling the south Oman tank maintenance, static equipment maintenance jobs from the planning stage to close out stage. Taking care of the responsibilities from Initial preparation of scope, budget for the work, and estimated forecast of the value of work done. Preparation of schedule, planning packages to take the maintenance, project jobs. Analysis of the work progress and lead the team to achieve the target. Involving in lean model to achieve optimization in cost and efficiency of work. Identify and evaluate the options of strategy, methods. Critical path analysis, variance & delay analysis of schedules and work programs.

Achievements: - Safe and successful completion of 2017 do ability, completion of 15 tanks maintenance. Development of lean and SOP for the tank maintenance works.

Integrated Activity Planning Engineer, BG India, Mumbai, India (Shell)
Development of Asset 8 Year plan, 3 year & 90 Day to support the business and functional heads. Closely associated with Department heads, planners for preparing, consolidating long term resource loaded functional plan in line to the business plan and integration of the same for effective safety and productivity. Schedule analysis to production engineer for accurate production forecasting. Working as Asset shutdown planner to support the shutdown management inline with OSCAR process. Develop individual shutdown schedules, manpower histogram & do schedule risk analysis. Identifying the planning risks & opportunities in time, prioritize the activities and de conflicting of future plan to achieve cost reduction and highest accuracy for the projects, well Engineering & operation/maintenance jobs. KPI analysis and taking necessary action to improve the planning process. Conduct SIMOPS, risk assessment of the activities and Interface between project and operations to execute the job efficiently.

Integrated Activity Scheduling Engineer, BG India, Mumbai, India
Manage 3 year, 90 Day and 6 Week Integrated Plans and the scheduling of activities. Facilitating the interface with the offshore facilities to develop the execution schedule for all offshore work and tracking its execution. Planning of major shutdowns, projects and long term strategy. Develop resource loaded project schedules and long term maintenance & asset Integrity plans in to an integrated plan to provide greater reflectivity to produce a joint arrangement of work for effective execution. Identify the risk and opportunities in operations, projects and shared resources. Ensuring the maturing the activities in to different plan horizons. Measure the KPI of integrated plan and analyze how the individual functions performed, generation of monthly reports. Support the asset shutdowns by creating the schedules, reviews, challenge session.

Achievements: - Safe and successful completion of 3 medium shutdown, 1 major shutdowns and few minor shutdown (overall more than 0.2 million man-hours) which involved intensive jobs of projects, asset integrity, maintenance and operations.

Involved in the planning and supported in the completion of multiple project activities including brownfield, greenfield, asset integrity campaigns and major maintenance; more than 5 million man-hours over all.

Pivotal in sustaining integrated activity planning and scheduling process in India asset and made role model to other assets and trained number of people to develop them as functional planner.

Achieved more than 140 well interventions yearly by usage of shared resource with proper planning. Reduced overall non-productive timing of the well service crew

Shutdown optimization of more than 10 days and reduced logistics requirement.

WorleyParson-Arabian Industries JV, Nimr, Oman. PDO
Senior Planning Engineer

   Sep 2010
— May 2011

Work with site manager and see that development is taking place in the most suitable method and sequence of construction operations are going on perfectly in scheduled projects. Plan and supervise the entire program of work and must foresee a contract's demands in terms of work force, materials, equipment and technical challenges. Lead the Project Team for schedule performance, manage contractor invoices and measure the projects and maintenance performance. Performed as shutdown coordinator for the projects and maintenance to develop and finalizing the scope with the client. Estimating the resource for the shutdown and project jobs, ensuring the mobilization and demobilization as per the requirement. Preparation and involvement in the project kick of meeting, shutdown challenges session.

Achievement: - Completed multi discipline projects, maintenance jobs and shutdown works, of more than 1 million man hour.

Directly handled the resources at site level, managed and allocated as per the scope requirement.

Reliance Engineering Associates Ltd, Mumbai
Planning Engineer

   Jan 2007
— Sep 2010

Cross Country Gas Pipeline, Compressor Station and Associated Facilities Project
Support the project manager in preparation of schedules, identify key project areas, critical path and delay analysis techniques. Co-ordinate with project team to resolve the technical and commercial proposals. Manage project resources, materials as per the business objective. Pivotal in developing the E-Pipe book, the online system for maintaining Project quality inspection documentation system. Central role in handing over the system from project team to operations and work with different audit group. Developing and maintaining Communication and Correspondence management from different stake holders.

Achievement: - Accomplished the 400 Km pipeline work and 8 main line valve station from initial survey to commissioning. Completion of punch points and handing over the system to operations team

PunjLloyd Ltd
Planning Engineer

   Jan 2005
— Jan 2007

Construction of Essar Crude Oil Terminal Project & Petronet LNG Terminal
Preparing the schedule, monitor the project progress and assist the construction manager to complete the activities within time in the right way. Identify the key resources, dates, targets and figure out the best and most efficient way to complete the project. Liaison with contractors and client for the monthly invoice, cash flow and contract management for smooth execution. Synchronize between engineering and construction team for the distribution of accurate deliverables in correct time. Established the material reconciliation strategy and successfully executed in enhanced way.

Achievement: - Successfully completed and handed over the 10 no. crude oil tanks as per the baseline. Efficiently managed the site location with more than 200 people at site level.