SUMMARY
 A seasoned professional with 10+ years of Project Management and Engineering experience in multi-million dollar Oil & Gas projects (consisting of upstream, mid-stream & downstream; offshore, onshore & FPSO; Greenfield & Brownfield); Petrochemical; Refinery; Power Generation, Transmission & Distribution; Water & Waste Water; Utilities; Environmental, Infrastructure, etc.
 Experienced in managing different phases of project ranging from Proposal / Bidding, Conceptual / Feasibility Study / ASSESS, SELECT / Pre-FEED, Front End Engineering Design (FEED), Detailed Engineering, Engineering Procurement & Construction (EPC), EPCM, Commissioning & Start-up, Project Management Consultancy (PMC), etc.
 Adept in initiating, planning, executing, monitoring & controlling and closing the technical, fiscal and administrative functions of the project. Result oriented with excellent feedback from customers for completing the projects on schedule & within budget
 Ability to work on multiple projects (multi-tasking) and effectively manage different project teams. Listens to the team, discusses the issues, resolves problems & directs activities to remove roadblocks & achieve objectives
 Excellent communicator with exceptional skills in project engineering, project management, project delivery, project control, planning, scheduling, budgeting, cost control, engineering, procurement & construction management (EPCM), commercial negotiation, contract management, HSE & QA/QC Management, proposals, business development, operations management, etc.
 Diversified experience with working for Clients like ADNOC Group of Companies (ADMA-OPCO, ZADCO, ADCO, GASCO, ADGAS, TAKREER, BOROUGE, etc.), Abu Dhabi Oil Company (ADOC), Dolphin Energy Limited (DEL), SAUDI ARAMCO, Bahrain National Gas Company, Tatweer Petroleum, DP World, etc.

ROLES & RESPONSIBILITIES
 Dynamic & proactive Project Manager responsible for managing multiple projects from proposal to execution till project close-out / handover within the core projects portfolio. Manages a team of project controllers, document controllers, cost estimators, procurement engineers, construction specialist, various disciplines engineers & designers, etc.
 Ensuring a project is fit-for-purpose and adheres to the project budget and schedule
 Planning and implementation of the project to ensure that activities are on schedule, project milestone dates are met and given tasks are completed within the allocated budget. Responsible for cost control and profitability of the project.
 Act as primary interface with client to ensure that the client’s expectations are satisfied.
 Acts as focal point of contact with Client, Engineering Consultants, PMC, Sub-contractors, etc. on matters related to implementation of project. Manage and co-ordinate with workshare office / High Value Engineering (HVE) located remotely for the execution of the project activities. Communicate with, negotiate with and influence stakeholders / shareholders
 Participate in ITT development, Technical & Commercial Bid Evaluation and bidder / sub-contractor selection. Award the bid to technically acceptable & commercially lowest bidder / sub-contractor. Strong commercial negotiation skills
 Plans, directs & supervises the activities of the involved personnel / contractors / sub-contractors / vendors / suppliers.
 Effectively manage the overall project manpower / resource and improve productivity.
 Compliance with requirements of the contract and project execution plan. Experience in lump sum and reimbursable projects.
 Execute the work in accordance with the applicable project procedures and standards. Experience working with International & National Standards such as Exxon Mobil, SHELL, TOTAL, BP, CALTEX, ADMA-OPCO SED, ADNOC COP, BGS; ARAMCO, etc. and International design codes such as API, BS, ISO, ASME, ANSI, NACE, NFPA, etc.
 Reviews project scope of requirements (SOR) and ITT package documentation, develop implementation strategies, follows-up implementation and ensures that all commitments in terms of schedule / budget, performance guarantee and quality are attained throughout various phases of the project until final hand over to operating Authority.
 Identify the project risks at beginning of the project, develop the risk treatment plan and monitor the risks throughout the project
 Ensuring all the HSE & Quality objectives and legal requirements are observed. Maintains HSE focus within the team & ensure HSE & Quality requirements are strictly adhered during different phases of the project
 Obtain, analyse and circulates technical and contractual information to project disciplines
 Develop the project execution plan, quality plan, Statement of Requirements (SOR), project procedures, scope of work, schedules, Cost Estimate, ITT Package and budgets for the assigned project elements, monitoring progress to maintain those schedules and budgets. Identifies and documents changes in scope
 Manage and coordinate multi-discipline engineering (process, mechanical, corrosion, materials, piping, onshore / subsea pipelines, offshore structural, civil, electrical, instrumentation, HSE) procurement, construction, commissioning & start-up activities to ensure projects are executed in a safe, efficient, cost effective & timely manner. Promotes use of latest technology.
 Co-ordinate & expedite Material Requisition (MR) for Long Lead Items / Equipment’s (LLI), MTO, BOM & BOQ. Participate in Technical & Commercial Bid Evaluation, vendor availability & capability, Purchase Requisition (PR), Vendor Drawing Review (VDR), etc.
 Liaise with Independent Verification Body (IVB) for Design Certification (DC) and incorporate the comments into design
 Organise & participate in Project Risk Workshop, Lessons Learnt workshop, Design Reviews, PEER Review, HAZID / ENVID / OHID, HAZOP, Safety Integrity Level (SIL), E-HAZOP (SYSOP, SAFAN & OPTAN), 3D Model Reviews, Constructability Review, Value Engineering, SIMOPS, Quantitative Risk Assessment (QRA), PHSER, HSEIA, Independent Project Review (IPR) for ADNOC, etc. Responsible for directing and closing out all action points arising as part of the workshops.
 Ensures the implementation of projects in accordance with Value Assurance Practices (VAP).
 Ensures customer criteria and scope are met by all engineering disciplines. Expedites distribution of action items following discussions / meetings with the customer. Understands the customer's business goals in order to enhance the project work
 Obtain, analyse and circulates technical and contractual information to project disciplines
 Reviews and approves change orders. Notifies affected personnel of all changes
 Prepare technical reports, weekly & monthly reports and documentation of activity for customer.
 Ensuring the invoices are issued along with the monthly reports and payments are received on time and ensure positive cashflow
 Providing monthly reports, roadmaps and periodic recommendations to senior management
 Visit onshore / offshore site for inputs and coordinate with site team for site related activities
 Co-ordination with offshore subcontractors to preform laser scanning activities, geophysical survey to obtain seabed bathymetry / water depth, ROV at pipeline crossing, ROV at jacket approach & face survey, grab sampling, geotechnical investigation etc.; topography & underground survey; Cathodic Protection (CP), Electrical Power System (including EMTP) & Earthing Studies etc.
 Prepare & submit Technical (Execution Strategy / Plan, SOW, deliverable list, Man hours, software, sub-contracts, qualifications, etc.) proposal & commercial proposal. Participate in pre-bid clarification meeting and respond to bid clarifications.

WORK EXPERIENCE
1. COMPANY : WorleyParsons Engineering Pty Ltd., Abu Dhabi, UAE
DESIGNATION : Project Manager / Project Lead / Senior Project Engineer
DURATION : May, 2014 – till dated
PROJECTS:
ADMA-OPCO-Minor Engineering Services for Zakum, Umm Shaif & Das Island (SELECT, FEED & Detail Engineering)
 Project Manager managing multiple projects from proposal to execution till project close-out within the ADMA-OPCO brownfield project portfolio
 Responsible for complete project delivery & profitability. Ensure that activities are on schedule, project milestone dates are met and given tasks are completed within the allocated budget.

DEL – Detailed Engineering to increase MOP of DEL Downstream Pipeline Network from 57 to 60 barg
 The current Maximum Operating Pressure (MOP) of the LP side of both TRF and TFP including the connected Eastern Gas Distribution pipeline Network (EGDS) is 57 barg which is 10% below the design pressure of 63.5 barg. The objective of the project is to increase the MOP to 60 barg to add more flexibility to gas deliveries to its customers.

ADOC – Engineering Study for Helidecks at Mubarraz Offshore Field (Detailed Engineering)
 To carry out structural adequacy and HSE adequacy assessment and to carry out detailed engineering of mitigations to make 8 Nos. of Helidecks CAPP-71 compliant. Basically check suitability of the Helideck structure, firefighting system requirements, marking details and all necessary requirements for the code compliance as highlighted in GAP study report.

ZADCO – Replacement of Electric Motor of Fire Water Pump (428-P-001A) (SELECT, FEED & Detailed Engineering)
 CATEGORY-1: Feasibility Study of the motor replacement with existing pump
 CATEGORY-2: Detailed Engineering & preparation of EPC package for replacement of existing Motor (428-PM-001A) with new electric motor (increased capacity 930 KW to 1250 KW) with 15% power margin at Max. load (150% of rated capacity)
 CATEGORY-3: Detailed Engineering and preparation of EPC package for replacement of the existing Pump (428-P-001A) (in case existing pump is not suitable with new electric motor) (Optional)

ADCO – FEED Addendum for Qusahwira Phase II Development Project (Study)
 To Perform the transient slug analysis for the Normal operation and rate change operations (Ramp-up and Pigging)
 To Perform the Transient Surge Analysis and Estimate the MOL pressure surge pressure for different upset scenario

ADCO – Specialized Engineering Studies for Bu Hasa Integated Field Development Project (Detailed Engineering)
 To develop capacity for Shuaiba B, A and H-North Zones and new BP wells to sustain & increase the production plateau in Shuaiba to 560 MBOPD contributing towards 650 MBOPD across Bu-Hasa field. Hence, new gathering production facilities.
 Scope of study is to perform Transient (Pigging, depressurization, restart, ramp-up and rampdown operating cases) Study, Piping Stress Analysis, Pipeline Stress Analysis & Fire Water Hydraulics (Steady State & Transient)

GASCO – Study & Preparation of EPC Tender Document for Provision of Solar Power for Al Maha Camp (FEED)
 Assessment of different technology, selection of suitable technology (Solar PV technology: Monocrystalline, Polycrystalline & Thin Film; Inverter Technology: Central & String) & finalisation of scheme for the solar power system configuration.
 Prepare required project deliverables, EPC Scope of Work, EPC Schedule and EPC Cost Estimate (±15%) for DSP approval

GASCO – FEED Study for Enhancement of Fire and Gas Detection System at ASAB-0 (FEED)
 To upgrade / replace the existing plant Fire and Gas detectors and detection system
 To survey the existing facilities, study the implementation requirements as per the SHELL mapping study report and provide a viable & cost effective design along with engineering details for hardware changes in the plant, specifications for field instruments, F&G detectors, Hardware I/O module & software logic changes requirement's for integration with existing Honeywell F&G and DCS systems
 Prepare EPC Scope of Work, EPC Schedule and EPC Cost Estimate (±15%) for DSP approval

GASCO – Structural Integrity / Adequacy Check of Existing Piperacks at Habshan Plant - Phase-III (Detail Engineering)
 Calculate piping load for non-critical lines and carryout Stress Analysis of the identified critical lines.
 Propose cost optimization options
 Perform Structural Adequacy Analysis based on latest loading and DGS / Specification.
 Recommend suitable modifications / strengthening measures, Temporary structures details (as required)
 Prepare Construction Scope of Work, Schedule and Cost Estimate for DSP approval

ADCO – Fire Water Network Analysis for Fujairah MOT Fire Water Network (Study)
 To replace the fire water ring in Fujairah MOT with complete compliance to HSE standards and regulations and minimum disturbance of operations.
 Assess the steady state scenarios (dry and wet firefighting) and confirm the piping / ring main header size by considering new proposed route (with additional fittings) and accordingly report the fire monitors end pressure and header velocity
 Identify the transient scenarios (pump trip / valve closure) and perform the surge study. Verify the design pressure, ring main header size against calculated surge pressure.

ADMA-OPCO - Replacement of HV Switchgears at GG-II & ZWAP (SELECT & FEED)
 Replace the existing 11kV switchgear at Zakum West Accommodation Platform (ZWAP) & 6.6kV switchgear at Gas Generation – 2 Platform (GG-II), Zakum West Super Complex (ZWSC)
 Develop FEED stage engineering deliverables including specialist study sub-contact for EMTP Switching & Earthing Studies
 Organize & participate in Configuration Optimization Workshop, E-HAZOP & Constructability workshops
 Prepare Project Execution Plan, EPC Scope of Work, EPC Schedule and EPC Cost Estimate (±15%).

BOROUGE – CCCW Reliability Improvement in U&O-1 (FEED)
 Installation of 78” new CS header (alternative to existing underground GRE Header) from discharge of five CW Pumps to the inlet of Heat Exchangers (20 Nos.) to assure 100% flow. Develop 3D Model in PDS Database.
 Study and perform Detailed Engineering for ESD modification works
 Manage sub-contract for Under Ground (UG) detection survey
 Prepare Project Execution Plan, EPC Scope of Work, EPC Schedule and EPC Cost Estimate (±15%).

ADMA-OPCO – Gas Supply from USGIF (CP-1) to USSC Gas System (IGD HAP) (FEED)
 Installation of new pig launcher and new CI package (tank and pumps) at CP-1and new pig receiver at IGD HAP
 Installation of new 3km subsea 24” pipeline connecting dry gas header downstream of dehydration unit at CP-1 to dry gas header at IGD HAP in Umm Shaif Field
 Installation of new pipeline MOV and ESD arrangement at extended sub-cellar deck of CP-1 and IGD HAP
 Modifications to fire water system, system interfaces (DCS, ESD & F&G), Tie-ins, valves, instruments relevant to modifications, Control and shutdown modifications, Additional lighting and equipment power supplies
 Early Tie-in works at IGD HAP and CP-1 to install early tie-in Double Block & Bleed (DBB) arrangement during shutdown
 Co-ordinate and manage geo-physical, ROV, laser scanning and HSE (HSEIA, QRA) sub-contracts
 Prepare Project Execution Plan, EPC Scope of Work, EPC Schedule and EPC Cost Estimate (±15%).

ADMA-OPCO - Replacement of 11kV Switchgear at ZWSC PGP (SELECT & FEED)
 Replace the existing 11kV switchgear at Power Generation Platform (PGP), Zakum West Super Complex (ZWSC)
 Develop FEED stage engineering deliverables including specialist study sub-contact for EMTP Switching & Earthing Studies
 Organize & participate in Configuration Optimization Workshop, E-HAZOP & Constructability workshops
 Prepare Project Execution Plan, EPC Scope of Work, EPC Schedule and EPC Cost Estimate (±15%).

ADMA-OPCO - Improvement in Metering of Crude Oil, Produced Water & Associated Gas at Das Island (SELECT)
 Study the existing metering facility and identify the requirement of high accuracy flowmeters in the measurement of crude oil, produced water and gas.
 Perform techno-economic screening of all feasible options. The criterion shall include complexity of modifications proposed, schedule and production interruption for each option.
 Develop SELECT stage engineering deliverables for the recommended engineering solution
 Prepare Project Execution Plan, FEED Scope of Work, FEED & EPC Schedule and Cost Estimate (±30%).

BOROUGE - HEXENE-1 Storage and Import Facilities (FEED)
 Install HEXENE-1 storage tank of 9000 m3 capacity.
 Unloading facility at Borouge jetty which consists of automated unloading arm, unloading line from jetty to HEXENE-1 storage tank and slops handling and transfer facility.
 HEXENE-1 will be supplied to B2 and B3 HEXENE-1 purification areas through new high capacity high head centrifugal pumps. Slops will be collected at jetty site through 3” size slop lines and incinerated as fuel in boilers.
 Prepare Project Execution Plan, EPC Scope of Work, EPC Schedule and EPC Cost Estimate (±15%).

ADMA-OPCO - Umm Shaif Long Term Development Plan Phase-1 (SELECT)
 Well mapping and selecting the optimum location for the 6 New WHT’s considering the drilling radius. Steady State Hydraulic Analysis in PIPESIM & Transient (Slug) Analysis using OLGA
 Route Selection and Optimization study along with pipeline field layout and analysis
 Design and analysis of 7 nos. of infield pipelines and 3 nos. of radials
 Design of 6 New WHT’s and complete topside modification for 3 existing WHT’s (including Well Head Control Panel) which includes development of plot plan / equipment layout, structural in-place analysis, Weight Control Report (WCR), Digital Oil Field (DOF) requirements, etc.
 Prepare Project Execution Plan, FEED Scope of Work, FEED & EPC Schedule and Cost Estimate (±30%).

ADMA-OPCO – Umm Shaif Field WHT Electrification Phase-2 (SELECT & FEED)
 To develop a 6.6 kV power network rings for Umm Shaif field WHT Electrification works with the source from Power Distribution Platform (PDP) at USSC
 Installation of J-tube and splitter / junction box at each of 41 WHT’s, 11kV subsea cable laying to complete the power grid.
 E-HAZOP for Phase-1 and Phase-2 WHT’s
 Prepared Project Execution Plan, EPC Scope of Work, EPC Schedule and EPC Cost Estimate (±15%).

ADCO – EPC for Rumaitha North CO2 Injection & Bab Far North CO2 Injection Pilot Project (EPC)
 ADCO intends to utilize the recovered CO2 gas (by MASDAR) by injecting into Rumaitha & BAB field reservoir. The overall scope of this project is to engineer, procure and construct all the required facilities that need to be installed to ensure proper CO2 injection in Rumaitha
 Installation of two new clusters 14(N) & 15(O) in the north flank of Rumaitha & modification at existing clusters 1(A) & 2(B) and existing remote well RA-006 in Rumaitha
 Production from 3 new wells and existing five wells affected by early CO2 break-through shall be collected and transported to CPP in a separate network
 Lift gas system is provided to three new oil producer wells and Remote well Ra-006.
 Two (2) CO2 pilot flanks are being developed as part of this project, namely Bab North and East Flanks. This Project will build a new 8” CO2 pipeline (Bab CO2 pipeline approx. 72km) from Rumaitha to BAB Far North CO2 pilots
 Conduct Production flow assurance study, Depressurization Study, Drying Procedure to Meet CO2 Moisture Content, Dynamic Simulation for Pumps, Asphaltene Study, CO2 Displacement Study, CO2 Fracture Propagation Study, etc.
 Project involves critical LLI’s like CO2 Booster pumps, Cladded Pipes and other equipments like Pig receiver / launcher, Flow metering, Multiphase metering, Production and test manifold, Chemical Injection Package, HPU, Closed drain drum (CRA cladded), Nitrogen package, Electric heaters and trim coolers, block valve stations, 33kV Over Head Line (OHL), etc.

PROPOSALS:
Submitted technical and commercial proposals for the following projects:
 ADMA-OPCO-Minor Engineering Services for Zakum, Umm Shaif & Das Island (SELECT, FEED & Detail Engineering)
 ADMA-OPCO – FEED for Development And Qualification Of Pile-Jacket Pinning Concept
 ZADCO – FEED for Replacement of Upper Zakum Pipelines Project
 ADMA-OPCO – FEED for Electrical, Control, Systems And Pigging Facility at Umm Shaif
 ADMA-OPCO – FEED for Critical Piping Replacement project at Das Island
 ADOC – Engineering Study for Helidecks at Mubarraz Offshore Field (Detailed Engineering)
 ADCO – FEED Addendum for Qusahwira Phase II Development Project (Study)
 ADCO – Specialized Engineering Studies for FEED for Bu Hasa Integated Field Development Project (BUIFDP) (Study)
 GASCO – Study and Preparation of EPC Tender Document for Provision of Solar Power for Al Maha Camp (FEED)
 GASCO – FEED Study for Enhancement of Fire and Gas Detection System at ASAB-0 (FEED)
 ADMA-OPCO - Replacement of HV Switchgears at GG-II & ZWAP (SELECT & FEED)
 BOROUGE - CCCW Reliability Improvement in U&O-1 (FEED)
 ADMA-OPCO – Gas Supply from USGIF (CP-1) to USSC Gas System (IGD HAP) (FEED)
 BOROUGE - HEXENE-1 Storage and Import Facilities (FEED)
 ADMA-OPCO - Replacement of 11kV Switchgear at ZWSC PGP (SELECT & FEED)

2. COMPANY : WorleyParsons Engineering Pty Ltd., Abu Dhabi, UAE
DESIGNATION : Project Engineer
DURATION : July, 2009 – Apr, 2014
PROJECTS:
GASCO - Replacement of Hot Gas Bypass Piping, Habshan 1 – Unit 52 / 53 / 54 (FEED)
 Replaced existing SS347 hot gas piping and control valve for Sulphur Recovery Units 52/53/54 from 30” nozzle of Waste Heat Boiler 2nd Pass to the outlet of Claus reactor with internally refractory lined Carbon Steel (CS) piping & control valves.
 Demolition / installation strategy for the existing and new piping & control valve to ensure minimum shutdown time

ADMA-OPCO – Nasr Full Field Development Power Package (FEED)
 Install new 132 kV PDAS substation at DAS Island
 Install 132 kV Subsea cable link between Das Island & NASR Field (~70km), Das Island & Umm Shaif Field (USSC) (~44km) and Umm Shaif Field (USSC) to NASR field (~32km) to form a power cluster
 Install new Power Distribution Platform (PDP) at USSC with 132kV substation and other equipment’s to supply power for the entire USSC and nearest fields. PDP is a 6 legged jacket over water depth of ~16.37m. The jacket dimension is [16m + 16m] x 20m. PDP has 2 topside decks with overall deck dimension of 46m x 34m
 Prepared Project Execution Plan, EPC Scope of Work, EPC Schedule and EPC Cost Estimate (±15%).

ADMA-OPCO - Quantitative Structural Assessment of WHT’s, Bridge & BST in ZAKUM
 Perform Global In-place Analysis, Push-over Analysis and Cathodic protection adequacy checks for 18 nos. of Well Head Towers (WHT), 2 nos. of Bridge Support Towers (BST) & 1 no. Bridge.
ADMA-OPCO – Umm Shaif Oil Network Expansion Project (MTDP) (FEED)
To mitigate the hydraulic limitations up to 2020 following the oil network expansion & to install new facilities identified below:
 Performed Laser Scanning and develop 3D model for ten (10) existing Well head Towers
 Performed Geo-Physical Survey for 1200 m corridor along the pipeline routes to obtain seabed bathymetry / water depth, grab sampling along the pipeline route, ROV at pipeline crossing and ROV at jacket approach & face survey
 Perform Geo-Technical Investigation at the proposed locations for the New Manifold Tower, New Riser Platform and New Bridge Supporting Tower.
 Install 1 no. of new Manifold Tower (US MFT-1). US MFT-1 is a 6 legged jacket over water depth of ~16m. The jacket dimension is 18m x 30m (42” dia. piles x 24m penetration) with a lift weight of 600T. US MFT-1 has 3 topside decks with overall deck dimension of 28m x 40m and a helideck with a lift weight of 1,600T
 Install 1 no. of new Riser Platform (RP-1). RP-1 is a 6 legged jacket over water depth of ~16.23m. The jacket dimension is 28m x 32m (42” dia. piles x 24m penetration) with a lift weight of 712T. RP-1 has 3 topside decks with overall deck dimension of 42m x 46m with a lift weight of 1,875T
 Install 1 no. of Bridge Supporting Tower (S-13) between New Riser Platform (RP-1) to CSP-1
 Install 2 nos. of new bridge sections of 50m and 43m with a lift weight of 340T and 300T
 Route the new 2 × 30” Piping on Collector Separator Platform (CSP-1) approaching from RP-1
 Modification to ten (10) existing Well head Towers such as replacing the flow lines, production header, test header, RTU, SCADA while installing new MPFM, Corrosion Inhibitor System, Closed drain drum, pig launchers / receivers, EHSSS, Valves, F&G System, Digital Oil Field (DOF) requirements, etc.
 Install three (3) new subsea radials and five (5) new infield subsea pipelines ranging from 12”, 16”, 20” & 24”
 Prepare Statement of Requirement (SOR), EPC Scope of Work, EPC Schedule and EPC Cost Estimate (±15%).

ADMA-OPCO – Umm Shaif Field WHT Electrification Phase-1 (SELECT & FEED)
 To develop a 6.6 kV power network rings for Umm Shaif field WHT Electrification works with the source from Power Distribution Platform (PDP) at USSC
 Installation of J-tube and splitter / junction box at each of 26 WHT’s, 11kV subsea cable laying to complete the power grid.
 Prepared Project Execution Plan, EPC Scope of Work, EPC Schedule and EPC Cost Estimate (±15%).

ADGAS – LG-8 Power Generation Unit for IGD-S Project (FEED)
 Installation of 1 Power Generation Unit (LG-8) including accessories and associated systems at Das Island to cater the load demand for the IGD-S Project, with N+2 operation criterion.
 LG-8 will be connected to the new 33kV room along with load feeders in LG-8 Local Control Building. The new 33kV switchgear located in the new local control building for LG-8 shall cater to the loads of LG-8 and future generators.
 Inter-tie feeder (Is limiter in parallel with Reactor) from LG-8 33kV Switchgear to ADGAS 33kV switchgear in substation-1 and to ADMA 33kV switchgear
 In Existing inter-tie feeders between ADGAS and ADMA 33kV switchgears Is limiters in parallel with reactors will be included as part of this project and located in Substation 1 area
 Tie-ins with the existing Fuel Gas and utility systems (instrument air and make-up water)

ADGAS – Power Generation & Associated facilities at Das Island for NASR FFD Loads (FEED)
 Installation of GT-4 and GT-5 and associated facilities at Das Island for NASR FFD Loads and Umm Shaif Loads.
 The GTG’s are connected to the existing 33kV system via generator step-up transformer for synchronous operation with existing units. Synchronisations of GT-4 & 5 are carried out at the 33kV SG in ADMA new 33kV substation at Das Island.

ADMA-OPCO – Umm Shaif Electrical Power Balance Project (FEED)
 Install a 132kV Subsea cable link of approximately 40km from DAS Island power system to the USSC power system
 New Power Distribution Platform (PDP) to supply power for the entire USSC and nearest fields
 Perform Geophysical Survey for 600 m corridor along the cable routes, grab sampling along the cable route and ROV inspection at cable crossing
 Perform Geotechnical Investigation at the proposed locations for the New Power Distribution Platform (PDP)
 Prepare Project Execution Plan, EPC Scope of Work, EPC Schedule and EPC Cost Estimate (±15%)

NABUCCO – NABUCCO Gas Pipeline Project (PMC)
 Dedicated 4000 km pipeline system (56” main cross-country pipeline, 48” feeder pipelines and 14 nos. Compressor Stations) to transport natural gas from the entry points at southern and eastern Turkish borders with Georgia & Iraq, traversing Turkey, Bulgarian, Romania, Hungary and Austria to central Europe.
 Ensure the technical integrity of the proposed design as prepared by Local FEED Engineer (LFE)
 Ensure the most economical technical solutions are identified and implemented
 Ensure LFE compliance to applicable technical design standards, environmental standards, etc.

ADMA-OPCO – Structural Assessment of 28 Well Head Towers as Part of Zakum Oil Pipelines Replacement Project
 Perform Global and Local In-place Analysis, Push-over Analysis, Spectral Fatigue Analysis and Boat Impact Analysis for 28 Well Head Towers (WHT).

ZADCO – Global Structural Analysis of Well Head Platform & Living Quarters Platform
 Perform Global and Local In-place Analysis, Weight Control Report, Push-over Analysis, Spectral Fatigue Analysis, Boat Impact Analysis & update equipment layout / plot plan for 7 Well Head Platforms (WHP) & 1 Living Quarters Platform (LQP)
 Generate Soil Curves (P-Y, T-Z and Q-Z) and Pile Capacity Curve

PROPOSALS:
Submitted technical and commercial proposals for the following projects:
 NABUCCO - Owner’s Engineer Consultancy Services for the NABUCCO Gas Pipeline Project
 ADMA OPCO - As-Built Campaign for Offshore And Das Island
 ADMA OPCO - Umm Shaif Oil Network Expansion Project (FEED)
 ADMA OPCO - New Nitrogen Plant At Das Island (FEED)
 TAKREER - Flare Gas Recovery at Ruwais Refinery - Phase 2 (FEED)
 GASCO - Replacement of 16” Condensate Pipeline from Habshan to Ruwais (FEED)
 GASCO - Technical Feasibility Study for Conversion of New 36” Buhasa - Habshan HP Pipeline for Lean Gas Operation
 British Petroleum (BP), Iraq - General Construction Management Contract (GCMC)
 British Petroleum (BP), Iraq - General Engineering Contract (GEC)
 ZADCO - Updating of Critical Drawing for Zirku Facilities
 ZADCO – CNIA Substation 19 – Engineering Package for Electrical Works

3. COMPANY : WorleyParsons Engineering Pty Ltd., Abu Dhabi, UAE
DESIGNATION : Mechanical Engineer – Rotating Equipment
DURATION : March, 2008 – June, 2009
ROLES & RESPONSIBILITIES:
 FEED and Detailed Engineering experience of Rotating Equipment’s in the consultancy field related to Oil & Gas both upstream & downstream and onshore & offshore
 Executed the work in accordance with the project procedures and standards
 Design / selection of rotating equipment’s such as centrifugal pumps, positive displacement pumps, fire water pump package, instrument air treatment package, chemical injection package, nitrogen generation package, Electric Overhead Traveling (EOT) crane, reciprocating compressors, centrifugal compressors, gas turbines, etc.
 Prepare and review design basis, data sheets and technical specifications for the above equipment’s
 Prepare and review material requisitions for the defined mechanical equipment. Issue material requisitions for enquiry, order placement and for any subsequent revisions
 Detailed Engineering of the above equipment and interfacing with other disciplines
 Preparation of technical bid evaluations. Review vendor’s quotations, prepare technical evaluation and recommend the final technically acceptable vendor
 Hold vendor co-ordination meetings and engineering review meetings to establish full understanding of scope of supply
 Review of P&IDs, data sheets, drawings and vendor drawings / documents
 Carry out the following functions relative to vendor documentation as:
a) Review document requirements and issue dates for major equipment with vendors at the pre-order meeting
b) Distribute supplier documentation to the various engineering and drawing office groups and co-ordinate their comments. Prepare consolidated comments and return these to the supplier
 Identify major slippages and their causes and propose corrective action. Also resolve all policy matters, major technical problems and unresolved differences with other groups
 Correspond with the vendor on technical matters and ensure that action is taken where necessary.
 Review relevant project design work and in particular:
a) Engineering Flow Diagrams, P&ID’s, etc., with reference to assigned equipment
b) Piping Layouts and Model with reference to assigned equipment
 Participated in the HAZOP of Flow Diagrams. Assess the process hazards to eliminate/reduce or mitigate risks to personnel, assets and environment

PROJECTS:
GASCO - As-Built Verification Update of ASAB 1 Plant (HAZOP)
 Participated in the HAZOP of Flow Diagrams. Assess the process hazards to eliminate / reduce or mitigate risks to personnel, assets and environment
 Worked on PHA PRO (HAZOP software) to input the data into the software and generate the final report for client action
 Identify all the causes, consequences, safeguards and recommendations for each deviation
 Identify the severity and likelihood for each deviation

ZADCO – Potable Water & Sewage Treatment Plant Project (Pre-FEED)
 Prepared mechanical basis of design
 Adequacy study of the existing equipment’s, pump selection criteria and material handling report
 Prepared specification datasheet for centrifugal pumps, chemical injection package, tanks, odour control unit, mechanical screen, manual screen, etc.

SAUDI ARAMCO - Hasbah & Arabiyah Field Development Project (Pre-bid for EPC)
 Executed the work in accordance with the project procedures and standards (ARAMCO)
 Prepared material requisition and data sheets for API pumps, Non- API pumps (ANSI pumps), positive displacement pumps and fire water pump package
 Reviewed vendor’s quotations, prepared Technical Bid Evaluation (TBE) and recommended the technically acceptable vendor

Tatweer Petroleum – Bahrain Field Development Project (Detailed Design)
 Executed the work in accordance with applicable project procedures and standards (CALTEX)
 Prepared data sheets, technical specifications and material requisition for centrifugal pumps, Electric Overhead Traveling (EOT) crane, reciprocating compressors, etc.
 Reviewed vendor quotations, prepared Technical Bid Evaluation (TBE) & recommended final technically acceptable vendor

Mubruk Oil Operation – Al Jurf Phase 2 Project (FEED)
 Co-ordination of all engineering and design activities within the team to execute the related activities of assigned projects
 Executed the work in accordance with applicable project procedures and standards (TOTAL)
 Prepared data sheets, technical specifications and material requisition for centrifugal pumps, positive displacement pumps (controlled volume, progressive cavity), fire water pump package, chemical injection package, instrument air treatment package, nitrogen generation package etc. located on the offshore platform and FPSO
 Correspond with the vendor on technical matters
ADCO - Qusahwira Field Development Project (Pre-bid for EPC)
 Executed the work in accordance with the applicable project procedures and standards (SHELL)
 Prepared material requisition and data sheets for API pumps, Non- API pumps (ANSI pumps), positive displacement pumps (controlled volume), and fire water pump package
 Reviewed vendor’s quotations, prepared Technical Bid Evaluation (TBE) & recommended the technically acceptable vendor

Syria Gas Company - North Middle Area Gas Exploitation Project (FEED & Detailed Design)
 Executed the work in accordance with the applicable project procedures and standards
 Prepared data sheets, technical specifications and material requisition for centrifugal pumps, positive displacement pumps, fire water pump package, chemical injection packages, nitrogen generation package, sales gas compressor package, Hand Operated Overhead Traveling (HOT) Crane, Electric Overhead Traveling (EOT) Crane, etc.
 Reviewed vendor’s quotations, prepared Technical Bid Evaluation (TBE) and recommended the technically acceptable vendor
 Review of P&IDs, data sheets, drawings and vendor drawings / documents.
 Carried out the following functions related to vendor documentation as:
a) Reviewed document requirements and issued dates for major equipment with vendors at the pre-order meeting
b) Distributed supplier documentation to the various engineering and drawing office groups and coordinated their comments. Prepared consolidated comments and returned to the supplier

DP World - Enhancement and Development of Jebel Ali Tanker Berth 4 (SELECT)
 Prepared specifications for fire water pump package
 Prepared datasheet for fire water pump package which includes equipment details for main fire water pumps, jockey pump, diesel engines for fire water pumps, wash pump and fresh water tank
 Prepared pump house basic layout for fire water pump package (Berth-4)

Bahrain National Gas Company (BANAGAS)-Gas Network & Compression Facilities (Revamp of LPG Facilities) (FEED)
 Prepared technical specifications, data sheets and material requisition for centrifugal pumps and fire water pump package

TAKREER - Green Diesel Project (EPC)
 Vendor drawing review of pressure vessels, heat exchangers, launchers and receivers

OTHER PROJECTS:
WorleyParsons EcoNomics-Carbon Disclosure Project (2008-2009), (2009-2010) & (2010-2011)
 Calculated and reported the CO2 emissions by direct and indirect combustion

4. COMPANY : Bredero Shaw (Middle East) Ltd., UAE
DESIGNATION : Mechanical Engineer
DURATION : Dec, 2007 – Feb, 2008
 To maintain and inspect the automotive and hydraulic systems in the plant
 Worked with the engine power train, final drive of the automobile
 Worked with the hydraulic actuators and pumps

QUALIFICATION
Post-Graduation:
M.Sc. (Engg.) in Automotive Engineering (2006 - 2007) with Merit (70%) from M.S. Ramaiah School of Advanced Studies, Bangalore / Coventry University, UK
Graduation:
Bachelor of Engineering (BE) in Mechanical Engineering (2002 - 2006) with Distinction (73%) from Adichunchanagiri Institute of Technology, Chikmagalur / Visveswaraiah Technological University, Belgaum

SOFTWARE PROFILE
Operating Systems: Windows 7 / 8
Office Applications: MS Office, HTML
Engineering Applications: Primavera P6, PDMS, PDS, Naviswork, PHA Pro, PV Elite, AutoCAD, MicroStation

TRAINING & CERTIFICATION
 Optima Card from Abu Dhabi Marine Operating Company (ADMA-OPCO)
 Optima Card from Zakum Development Company (ZADCO)
 “HUET / Sea Survival” from “Gulf Technical & Safety Training Centre (L.L.C.)”
 “Basic First Aid Training” from “Gulf Technical & Safety Training Centre (L.L.C.)”
 “Presentation Skills” training from “Abu Dhabi University Knowledge Group”
 “Business English” training with from “Abu Dhabi University Knowledge Group”
 “LEWA Pumps & Systems” overview from “LEWA Academy”
 “Product Training” from “Stahl Crane Systems”
 Trained in foundation course on “CATIA - V5” (Computer Aided Tridimensional Interactive Application) using Multibody Simulation

Education

M.S. Ramaiah School of Advanced Studies, Bangalore / Coventry University, UK
M.Sc. (Engg.) in Automotive Engineering

   Sep 2006
— Sep 2007

Experience

WorleyParsons Engineering Pty Ltd
PROJECT MANAGER / PROJECT LEAD

   Mar 2008
— Current

 Dynamic & proactive Project Manager responsible for managing multiple projects from proposal to execution till project close-out / handover within the core projects portfolio. Manages a team of project controllers, document controllers, cost estimators, procurement engineers, construction specialist, various disciplines engineers & designers, etc.
 Ensuring a project is fit-for-purpose and adheres to the project budget and schedule
 Planning and implementation of the project to ensure that activities are on schedule, project milestone dates are met and given tasks are completed within the allocated budget. Responsible for cost control and profitability of the project.
 Act as primary interface with client to ensure that the client’s expectations are satisfied.
 Acts as focal point of contact with Client, Engineering Consultants, PMC, Sub-contractors, etc. on matters related to implementation of project. Manage and co-ordinate with workshare office / High Value Engineering (HVE) located remotely for the execution of the project activities. Communicate with, negotiate with and influence stakeholders / shareholders
 Participate in ITT development, Technical & Commercial Bid Evaluation and bidder / sub-contractor selection. Award the bid to technically acceptable & commercially lowest bidder / sub-contractor. Strong commercial negotiation skills
 Plans, directs & supervises the activities of the involved personnel / contractors / sub-contractors / vendors / suppliers.
 Effectively manage the overall project manpower / resource and improve productivity.
 Compliance with requirements of the contract and project execution plan. Experience in lump sum and reimbursable projects.
 Execute the work in accordance with the applicable project procedures and standards. Experience working with International & National Standards such as Exxon Mobil, SHELL, TOTAL, BP, CALTEX, ADMA-OPCO SED, ADNOC COP, BGS; ARAMCO, etc. and International design codes such as API, BS, ISO, ASME, ANSI, NACE, NFPA, etc.
 Reviews project scope of requirements (SOR) and ITT package documentation, develop implementation strategies, follows-up implementation and ensures that all commitments in terms of schedule / budget, performance guarantee and quality are attained throughout various phases of the project until final hand over to operating Authority.
 Identify the project risks at beginning of the project, develop the risk treatment plan and monitor the risks throughout the project
 Ensuring all the HSE & Quality objectives and legal requirements are observed. Maintains HSE focus within the team & ensure HSE & Quality requirements are strictly adhered during different phases of the project
 Obtain, analyse and circulates technical and contractual information to project disciplines
 Develop the project execution plan, quality plan, Statement of Requirements (SOR), project procedures, scope of work, schedules, Cost Estimate, ITT Package and budgets for the assigned project elements, monitoring progress to maintain those schedules and budgets. Identifies and documents changes in scope
 Manage and coordinate multi-discipline engineering (process, mechanical, corrosion, materials, piping, onshore / subsea pipelines, offshore structural, civil, electrical, instrumentation, HSE) procurement, construction, commissioning & start-up activities to ensure projects are executed in a safe, efficient, cost effective & timely manner. Promotes use of latest technology.
 Co-ordinate & expedite Material Requisition (MR) for Long Lead Items / Equipment’s (LLI), MTO, BOM & BOQ. Participate in Technical & Commercial Bid Evaluation, vendor availability & capability, Purchase Requisition (PR), Vendor Drawing Review (VDR), etc.
 Liaise with Independent Verification Body (IVB) for Design Certification (DC) and incorporate the comments into design
 Organise & participate in Project Risk Workshop, Lessons Learnt workshop, Design Reviews, PEER Review, HAZID / ENVID / OHID, HAZOP, Safety Integrity Level (SIL), E-HAZOP (SYSOP, SAFAN & OPTAN), 3D Model Reviews, Constructability Review, Value Engineering, SIMOPS, Quantitative Risk Assessment (QRA), PHSER, HSEIA, Independent Project Review (IPR) for ADNOC, etc. Responsible for directing and closing out all action points arising as part of the workshops.
 Ensures the implementation of projects in accordance with Value Assurance Practices (VAP).
 Ensures customer criteria and scope are met by all engineering disciplines. Expedites distribution of action items following discussions / meetings with the customer. Understands the customer's business goals in order to enhance the project work
 Obtain, analyse and circulates technical and contractual information to project disciplines
 Reviews and approves change orders. Notifies affected personnel of all changes
 Prepare technical reports, weekly & monthly reports and documentation of activity for customer.
 Ensuring the invoices are issued along with the monthly reports and payments are received on time and ensure positive cashflow
 Providing monthly reports, roadmaps and periodic recommendations to senior management
 Visit onshore / offshore site for inputs and coordinate with site team for site related activities
 Co-ordination with offshore subcontractors to preform laser scanning activities, geophysical survey to obtain seabed bathymetry / water depth, ROV at pipeline crossing, ROV at jacket approach & face survey, grab sampling, geotechnical investigation etc.; topography & underground survey; Cathodic Protection (CP), Electrical Power System (including EMTP) & Earthing Studies etc.
 Prepare & submit Technical (Execution Strategy / Plan, SOW, deliverable list, Man hours, software, sub-contracts, qualifications, etc.) proposal & commercial proposal. Participate in pre-bid clarification meeting and respond to bid clarifications.