Sr Project Planning & Control Engineer


Last Updated: 11th March 2018 (over 4 years ago)

Address
India

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
25 to 34

Qualification Level
Degree

Languages
English, Hindi, Urdu

Summary

Cover Letter

REZA AHMAD
: +971-552156251
: rezaahmad67@gmail.com
: rezaahmad67
Abu Dhabi (UAE)
To
The HOD
HR Department

Subject: Application for the post of Lead Engineer/Manager (Project Planning/Project Control/Cost/Co-ordination)

Dear Sir,

With the reference to advertisement posted on your website. I am applying for the project management department. I have the total work experience of nearly 10 year in Construction and EPC Project, field for Oil Gas/Energy/Power. Currently I am working for M/S Anwesha Engineering & Projects FZE Fujairah (UAE) (Formally M/S IOT Anwesha FZE Fujairah (UAE)). The main roles and responsibilities that I undertook are the Projects planning, Scheduling, Project Control, Cost Control, Budgeting, Estimation, Co-ordination, Progress Review Meetings ,Expediting Contracting billing ,Procurement i.e from the planning stage to final hand-over of Project/Plant.I am responsible for Project Control, Managing and Planning other Projects simultaneously. Summary of my handled project are given in below Matrix.

Sr No
Project Name & Location
Client/Location
1 AL Taweelah Alumina-Shaheen Project-Construction of Large Storage tank & (SMP)structural mechanical Piping, Abu Dhabi (UAE) Emirates Global Aluminium (EGA)/BPJV, Abu Dhabi (UAE)
2 J3-DTA-PCG Project Jamnagar, Gujarat India Reliance Industries Ltd, Jamnagar,Gujarat,India
3 CCR (Continuous Catalyst Regeneration & Reforming) Projects, Mumbai India Bharat Petroleum Corporation Ltd/UIPL, Mumbai, India
4 Construction of LPG bottling Plant (Piping, double wall LPG Tankage, Equipments & Structures), Uran Mimbai India Bharat gas Corporation Ltd/UIPL, Uran Mumbai India
5 Construction of Crude Storage Tankage, Piping & Structures,BPCL Mumbai, India Bharat Petroleum Corporation Ltd, Mumbai India

I have completed Bachelor in Engineering (B.E).According to the eligibility criteria. I hope to full fill all of them. I have a unique style of working and good problem solving techniques. I would be very grate full to you for this favour .Than your once again for our consideration and precious time in going through the cover letter. I would be very glad to meet you in near future.

Our Sincerely
Enclosures: Resume-myresume.doc

Education

VTU(GCE)
B.E Mechanical Engineering

   Jun 2004
— Jul 2008

B.E Mechanical Engineering

Experience

IOT Anwesha Engineering & Projects FZE
Sr Project Planning & Controlling Engineer

   Dec 2015
— Current

Since Dec’15 with IOTAEC FZE Fujairah, UAE as Sr. Planning & Project Control Engineer
Project Handled:
Title: AL Taweelah Alumina-Shaheen Project-Construction of Storage tank & structural mechanical piping (SMP)
Client: Emirates Global Aluminum (EGA), Abu Dhabi UAE
EPC Cont.: L&T
PMC: Bechtel Petrofac Joint Venture
Project Value: USD 13.5 Million
Description: Deployed as Sr project planning at EGA Site Abu Dhabi for construction of process tank of 14.5M dia. X 32 m height as per API650 23 nos. tanks and structural mechanical piping (SMP).(Pipe Size ½” to 36”,scope 354000 IM & 54000 ID)
Key Result Areas:
Facilitating planning, reporting, scheduling in Primavera P6 R8.2, execution, preparing daily, weekly & monthly reports, conducting weekly meetings to track project status
Managing resources, analyzing sub-contractor plans & schedules, performing site activities as well as piping, tank, equipment erection and installation operations
Administering preparation of schedule in Primavera, identifying critical path, preparing look ahead schedule as well as communication to the concerned senior
Performing planning of all three MS i.e. Machinery, Manpower and Material
Monitoring project with the assigned baseline, scheduling updating & monitoring of project
Tracking project progress, managing change, risk, communicating the project status and updating the risk register while formulating risk response plan
Contributing in preparing and executing piping, tank & equipments method statement based on company’s standard approach to various projects wherever necessary for ensuring successful completion of the project
Performing review of billing breakup, supervising manpower requirement, work plan and resource requirement for the execution of project
Supervising RA billing invoice, preparing and submitting the same to client
Monitoring the construction & design, specifications, drawings & other data generated by the engineering contractor, ensuring adherence to compliance with applicable codes, laws and regulations
Administering critical issue for large bore pipes, identifying irregularities in co-ordination with inspection, design engineer, instrument & electric department
Providing technical & engineering support to the field supervisor in coordination with sub-contractors; performing micro planning of fabrication and resolving problems related to fabrication & erection
Extending support in identifying bottleneck, ensuring continuous workflow, reviewing RA bills while maintaining documentation
Facilitating development of EOT schedule along with its back up/letter/variations due to scope creep

Simplex Infrastructures Limited(INDIA)
Sr. Project Engineer (Planning)

   Dec 2011
— Nov 2015

Dec’11- Nov’15 with Simplex Infrastructures Limited, Kolkata as Sr. Project Engineer (Planning)
Projects Handled:
Project: J3-DTA-PCG Project Jamnagar
Client: Reliance Industries Limited, Jamnagar, Gujarat
Position: Sr. Project Engineer (Planning)
Duration: Dec'13- Nov'15
Project Value: USD 8.4 Million
Description: Deployed as project planning at Reliance Industries Limited, Jamnagar, and Gujarat for Construction of J-3, DTA- PCG ASU unit. Performed process piping in unit & pipe rack, structural & equipment installation. (Piping Size ½” to 48”,scope 480000 IM)

Client: Bharat Petroleum Corporation Limited Mumbai Refinery
PMC: Uhde India (P) Limited
Project: CCR (Continuous Catalyst Regeneration & Reforming) Projects
Position: Sr. Project Engineer (Planning)
Duration: Dec’11- Dec’13
Project Value: USD 19.23 Million
Description: Deployed as project planning at BPCL Mumbai for construction of full unit CCR Project (Continuous Catalyst Regeneration & Reforming). Performed process piping, structural & equipment installation(Piping Size ½” to 48”,Scope 450000 IM)

India Tube Mills & Metal Industries Limited, Mumbai
Project Engineer (Planning)

   Jul 2008
— Dec 2011

Jul’08- Dec’11 with India Tube Mills & Metal Industries Limited, Mumbai as Project Engineer (Planning)
Projects Handled:
Project: Construction of LPG bottling Plant (Piping , Tankage, Equipments & Structures )
Client: Bharat Petroleum Corporation Limited Uran Mumbai
PMC: Uhde India (P) Limited
Role: Project Engineer (Planning)
Period: Mar'10- Dec'11
Project Value: USD 9.65 Million
Description: Deployed as project planning at BPCL Uran Mumbai for Construction of LPG double wall storage process tank as per API620 02 Nos (Size-35.0 dia. X20 m height) and process piping, structural & equipment installation (Piping Size ½” to 36”,Scope 85000 IM)

Project: Construction of Storage Tankage , Piping & Structures
Client: Bharat Petroleum Corporation Limited Mumbai Refinery
Role: Jr Engineer (Planning)
Period: Jul'08- Mar'10
Project Value: USD 5.8 Million
Description: Deployed as Jr Engineer Planning at BPCL Mumbai Construction of crude oil tank, process tank of 53.0 M dia. X 20 m height as per API650 03 nos. tanks and structural and tank supporting piping package.