Quantity Surveyor


Last Updated: 27th May 2017 (over 5 years ago)

Address
Philippines

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Degree

Languages
English, Filipino

Summary

WORKING EXPERIENCE:

Feb. 2016 to Present : TECHNIPFMC France : Qingdao, China
YAMGAZ Management Consultant
Position : Quantity Surveyor
Project : YAMAL LNG Train Module Project
COOEC Qingdao Yard - China
Client : YAMAL LNG

• Prepare quantity take-off for Mechanical Equipment (Erection & Insulation) from IFC/As-built drawing in accordance with the pay item definition and measurement convention.
• Prepare quantity take-off for HVAC Equipment works, Duct works & Pipe works (Erection & Insulation) from IFC/As-Built drawing in accordance with the pay item definition and measurement convention.
• Prepare quantity take-off for Architectural from IFC/As-built drawing in accordance with the pay item definition and measurement convention.
• Prepare quantity take-off for Piping insulation from Isometric/As-built drawing in accordance with the pay item definition and measurement convention.
• Assist the Sub-Contract Engineer in the evaluation and verification of extra works and maintain proper filing of all contracts and accounting documents.
• Evaluate the Subcontractors’ cost proposals and variation order claims.
• Evaluate and certify Subcontractor’s MTO and responsible for the final quantity measurement intended for the final account of the project.
• Compliance with Health and Safety Regulations.

March. 2015 – Oct. 2015 : TECHNIP France - Abu Dhabi : Khafji, KSA
Position : Offshore Quantity Surveyor
Project : Khafji Crude Related Offshore Project (EPC Project)
Client : Joint Operation Kuwait Gulf Operation & Aramco Gulf Operation

• Prepare quantity take-off for Architectural, Structural Steel, Piping and HVAC.
• Perform all measurements and quantity assessments in line with the methods of measurement stated within the Subcontract documents.
• Prepare bill of quantities for Architectural, Structural Steel, Piping and HVAC.
• Validate and consolidate all Subcontractor’s reimbursable spending (Timesheet, daily rate & unit rate).
• Conduct on-site inspection and investigation for work progress measurement and billing purposes.
• Compliance with Health and Safety Regulations.

Aug. 2010 – May 2014 : Petrofac Int’l Limited (PIL) : UAE / Turkmenistan
Position : Quantity Surveyor – Mechanical (Piping, Equipment’s & Structural)
Project : South Yoloten Gas Field Development Project (EPC Project)
Client : TURMENGAS

 POST-AWARD: July 1, 2011 – Feb. 28, 2014 (PIL Site Office – South Yoloten, Turkmenistan)
• Prepare quantity take-off for the re-measurable items in the contract for Storage Tanks & Equipment (Erection, Painting & Insulation) from AFC/As-built construction drawing in accordance with the method of measurement of the Contract.
• Prepare quantity take-off for the re-measurable items in the contract for piping (Fabrication, Erection, Painting & Insulation) from AFC/As-built construction drawing in accordance with the method of measurement of the contract.
• Prepare quantity take-off for the re-measurable items in the contract for Module Structural (Fabrication & Erection) from AFC/As-built construction drawing in accordance with the method of measurement of the contract.
• Perform all measurements and quantity assessments in line with the methods of measurement stated within the Subcontract documents.
• Maintain records and track BOQ measurements / MTO according to the approved drawings.
• Evaluate and certify Subcontractor’s monthly progress claims prior to payment and responsible for the final quantity measurement intended for the final account of the project.
• Preparation and submission of weekly & monthly progress report.
• Check & Certified subcontractors monthly progress invoice, Mechanical (equipment), Piping and Pipeline re-measure; Cost estimation, check unit rate as per BOQ to ensure that all pricing information is handed over, understood and all contract requirements are met; Attend site visit/inspection to assist actual progress of work and variations.
• Update the site instruction on weekly basis; Encoding of new variation proposal to variation register; Free estimate un-priced Site Instruction; Prepared of spreadsheet for comparison on the rates submitted and other tender documents; Attend site visit/inspection to assist actual progress of work and variations.
• Develop star rates based on the Subcontract existing rates using by (Interpolation / Extrapolation, ratio proportion and correlation).
• Prepare payment certificate prior to actual progress of work and evaluates variation of subcontractor’s scope of work.
• Prepare of the Final Quantity based on the as-built drawing/s for the final reconciliation quantity.
• Evaluate and certify Subcontractor’s MTO and responsible for the final quantity measurement intended for the final account of the project.
• Assist the Sub-Contract Engineer/Administration in the evaluation and verification of extra works and maintain proper filing of all contracts and accounting documents.
• Review and verify total installed quantities for all disciplines including mechanical, piping, painting, insulation through regular review of Subcontractor work.
• Compliance with Health and Safety Regulations.

 PRE-AWARD : August 18, 2010 – June 30, 2011 (PIL Head Office - Sharjah UAE)
• Interface with Contracts department to prepare the BID Tabulation base on commercial offer of the bidder’s prior for evaluation.
• Support and provide input at tender stage for prices and rates.
• Prepare Invitations, receipt of bids, evaluation, review of Subcontractor’s price, previous work experience and their performance, Draft preparation of procedure for contracts and Subcontracts agreement.

March ’09 - June ’10 : Kellogg Brown & Root (KBR) : Doha, Qatar
Position : Quantity Surveyor - Piping
Project : Qatar Shell - Gas to Liquid Plant (GTL) Project- (EPCM)
Client : QATAR SHELL

• Perform Quantity Take-Off for pipe insulation by linear meter and input target quantities into Q-TRAX.
• Perform quantity take off for the re-measurable items in the contract for Storage Tanks & Equipment (Erection, Painting & Insulation) from AFC/As-built construction drawing in accordance with the method of measurement of the Contract.
• Perform Quantity Take-Off for pipe support fabrication and erection by weight (tons), and input target quantities into Q-TRAX.
• Perform Quantity Take-Off for pipe weld fabrication / pipe weld erection by inch-dia. and input target quantities into Q-TRAX.
• Perform Bill of Quantities for Structural quantities for the re-measurable items in the Contract.
• Check and validate contractor’s monthly progress payment certificate (PPC’s) to aid in the subsequent approval of Contractor’s invoices Provided earned progress data to scheduling sorted by system, schedule ID, and WBS.
• Actively participate in quantity trending & forecast reviews.
• Responsible for independently applying advance quantity surveying techniques and analysis within the project environment requiring extensive experience.
• Performing risk and value management and cost control.
• Update final quantity estimates based upon actual progress data.
• Assistance as required for development of budgets and costs-at-completion.
• Secure weekly earned progress & update Q-TRAX.(progress monitoring & reporting system).
• Variation analysis and estimates, and agreement with the contractor for client approval.
• Monitor each stage of construction to make sure that costs are in line with forecast.
• Provided quantity and progress analysis for site supervision as required.
• Review and verify total installed quantities for all disciplines including mechanical, piping, painting, insulation through regular review of Subcontractor work
• Understanding the implications of health and safety regulations.

Nov. 2006 – Feb. 2009 : Consolidated Contractors Int’l Co. : Abu Dhabi, UAE
Position : Quantity Surveyor / Estimator
Project : Habshan Gas Complex Expansion Project
Client : FLUOR/GASCO

• Prepare Quantity Take Off, as per approved isometric drawings, and check the materials based on bill of material against bulk material take off (MTO) and Bill of Quantities (BOQ).
• Quantification of Weight of Pipe rack, and surface area.
• Check the Quantity of Subcontractor, like weight of steel and surface area for Painting.
• Calculate of the weight of all type pipe support as per the client’s pipe support specification.
• Prepare of MTO for underground pipe for issuing the Field Warehouse Requisition (FWR).
• Check of all materials from isometric drawing as per BOM, based on General Arrangement drawing.
• Prepared RFI for piping isometric drawing, with discrepancy base on General Arrangement drawing.
• Prepare all the Red line / as built as per client standard for turnover / hand over requirement.
• Detailing of Structural Steel for Fabrication / Shop Drawing as per Client’s Standards.

Feb. 2005 – Feb. 2006 : Contracting and Trading Co. : Abu Dhabi, UAE
Position : Estimator/Asst. Planning Engineer
Project : Asab Water Injection Upgrade Project.
Client : VECO/ADCO

• Involved in Tender Package preparation: Prepare the Quantity Take Off as per approved isometric drawings, and check the materials based on bill of material against bulk material take off (MTO) and Bill of Quantities (BOQ).
• Preparing the Daily activities Report.
• Check edge preparation, fit-up and spool orientation with identification number of pipe before welding.
• Ensures that the drawing is in current revision and approved for construction by customers authorized representative.

May 2001 – Dec. 2005 : SEAGATE Engineering & Buildsystems : Manila, Philippines
Position : QC Inspector
Project : HOSPITAL PROJECT

• Monitor and inspects progress of work to conform to plan & specification.
• Coordinates with the contractor’s field inspection regarding changes in plans and schedules.
• Responsible for the quantification of rebar and concrete.
• Assist in processing of concrete pouring schedule.
• Coordinates with the contractor’s field inspection regarding changes in plans and schedules.
• Checks the scope of work, job description and standard acceptance of the specific requirement of the project based on applicable codes and specification.
• Monitor the welding activities (Before / On-going / After)
• Communicate and interfaces with other project engineers and engineering disciplines.

May 2000 – May 2001 : E.E.I CORPORATION : Manila, Philippines
Position : Junior-Welding Engineer
Project : MALAMPAYA PROJECT (MOGP)
Client : FW/SHELL

• Checks mainly the scope of work, job description and standard acceptance of the specific requirement of the project based on applicable codes and specification.
• Conduct line checking, punch listing and reinstatement of piping system.
• Review the test packages and other documents before turn over to pre-commissioning group.
• Checks and verifies the qualifications of welders and to ensure that the welding operators are qualified to Shielded Metal Arc Welding ( SMAW ) or qualified to Gas Tungsten Arc Welding (GTAW )
• Ensures that the Approved WPS is follow.
• Monitors the welding activities (Before/On-going / After)
• Conducts partial visual inspection on welded joints for the occurrence or cracks, undercuts, spatters and ensures that the joints are clean for final inspection of QC and Clients representative.
• Checks electrodes and rods to be use by welders conform to the client’s technical specification procedure.
• Reports all welded joints with corresponding spool tag, joint no., pipe size, welders no., WPS no., and joint type for low carbon steel, carbon steel and stainless steel pipe.
• Prepares the necessary documents for re-welds and repairs to make sure that it is action upon immediately.
• Checks the pipeline to ensure that all joints have welded.
• Communicate and interfaces with other project engineers and engineering disciplines.

Feb. 1999 – April 2000 : F.F. CRUZ & CO., INC. : Manila, Philippines
Position : Cadet Engineer / Office Engineer
Project : 1000 MW STA RITA POWER PLANT PROJECT
Client : FIRST PHILIPPINE BALFOUR BEATTY

• Responsible for the quantification of rebar and concrete.
• Assist in processing of concrete pouring schedule.
• Monitored and inspects progress of work to conform to plan & specification.
• Coordinates with the contractor’s field inspection regarding changes in plans and schedules.
• Conducts QS-Quantity survey works for completed structures.
• Assist in the QA-QC work for civil and mechanical works.
• Monitored the installation of GRP pipe spools and connections.
• Processes all safety work permits for pipeline confined spaces.
• Prepares all RFI documents for mechanical & civil inspections.
• Conducts pipeline inspection including hydro testing.
• Ensures all of the above tasks are executed in properly and safely manner.

Ad
Ad
Ad