Cost Estimation Engineer


Last Updated: 12th September 2017 (over 5 years ago)

Address
Oman

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Masters

Languages
English, Hindi

Summary

Responsible for carrying out all cost related activities such as Conceptual, Preliminary, Study, Feed and Definitive Estimates at various stages of the Project, Preparation of Estimation Methodologies and Guidelines, Cost Monitoring and Control Activities, Cost Planning, Life Cycle Cost Analysis for Equipment, Contingency Risk Analysis based on Monte Carlo Simulation Package, Licensor’s Evaluation, Variation Estimates, Value engineering, Validate Cost Estimates prepared by other Consultants, Feasibility Studies including carrying out Economic Analysis, Sensitivity Analysis , cost data base preparation for various equipment, bulk materials, erection works etc

Education

Indian Institute of Technology- Varanasi
M.Tech. Chemical Engineering

   Aug 2002
— Sep 2004

M.Tech. Chemical Engineering

Institute of Engineering & technology Lucknow U.P.
B.Tech. Chemical Engineering

   Aug 1997
— Sep 2001

B.Tech. Chemical Engineering

Experience

Oman Oil Company Exploration & Production
Sr. Cost Estimator

   Dec 2016
— Current

 Responsible for Carrying out all Cost Estimation & Cost Control activities for ABU TUBUL Block 60 Well Heads (80 Nos.), Connecting flowlines / Trunklines, Tie-in Works from Oil Wells to Gas Gathering Station, including Piping, Electrical, Instrumentation & civil works.

 EPC Cost Estimate for Oil Production Scheme of Bishat Suhaiba Field development which consist of Equipment for separation process, Crude Storage, Hook up of Oil Wells, Flowlines / Trunklines, Tie-inn Works & Connecting Station works.

 Responsible to manage all aspects of materials flow and to maintain control and accuracy over all goods inventories, including all procurement, planning, scheduling, cost, warehouse, receiving, and shipping to ensure that orders are fulfilled on time

 Also responsible for carrying out all cost related activities such as Conceptual, Preliminary, Study, Feed and Definitive Estimates at various stages of the Project, Preparation of Estimation Methodologies and Guidelines, Cost Monitoring and Control Activities, Cost Planning, Life Cycle Cost Analysis for Equipment, Contingency Risk Analysis based on Monte Carlo Simulation Package, Licensor’s Evaluation, Variation Estimates, Value engineering, Validate Cost Estimates prepared by other Consultants, Feasibility Studies including carrying out Economic Analysis, Sensitivity Analysis , cost data base preparation for various equipment, bulk materials, erection works etc.

Mott MacDonald Abu Dhabi UAE
Sr.Cost Estimation Engineer

   May 2014
— Nov 2016

 Preparation of Cost Estimation Methodologies and Guidelines.
 Engineering, Procurement, Construction & Commissioning Cost estimate Preparation for multi discipline like Mechanical Equipment, Piping Items, Pipeline, Electrical, Instrumentation, Civil & Structural Works, Building / Architectural Works, Telecom, HVAC, HSE & Other Misc. items.
 Plan, organize, prioritize, control, and execute the estimating effort in accordance with company policies and procedures in a business-like, efficient, productive and organized manner.
 Compilation of material take- off / Bill of Quantities based on drawings, data- sheets, P&ID, basic design, standards etc.
 Prepare estimates for the assessment of change both in terms of cost and resources.
 Prepare cost estimates in verification of Contractor's estimates
 Verification of Contract Trend Notice (CTN) submitted by EPC contractor.
 Preparation of Scope of work for Tenders.
 Contingency Risk Calculation based on Monte Carlo Simulation @Risk Software.
 Life Cycle Cost Calculation for Equipment.
 Cost Monitoring and Control Activities.
 Validate Cost Estimates prepared by other Consultants
 Feasibility Studies including carrying out NPV / IRR, Financial Analysis
 Carrying out all cost related activities such as Conceptual, Preliminary, Study, Feed and Definitive Estimates at various stages of the Project
 Licensor’s Evaluation, Value engineering Calculation for New Projects
 Preparation of in house software, training programmes and cost data base for various equipment, bulk materials, erection works etc.
 Review scope of work, project specifications and other contract documents & prepare cost estimate as per Scope of Work.
 Estimate of resources like man-hours, equipment, tools, consumables etc.
 Liaise with procurement department for the material/equipment/sub contract prices

Projects Handled:

 Preparation of Class 3 (±15% Accuracy) EPC Cost Estimate for Expansion Project EPC-1 & EPC-2 at Mubarraz Island & AR Site, UAE. Client: Abu Dhabi Oil Company (ADOC), Japan.

 Conceptual Study & EPC Cost Estimate for Replacement of offshore pedestal cranes at CC, ACPT-1 & 2, NSP, SSP and WSP Platform. Client: ZADCO

 RE-FEED for upgrade of Power Generation System at Umm Al-Dalkh-CPC Offshore Platform. (Class 3, EPC Cost Estimate,±15% Accuracy) Client: ZADCO.

 Contract Trend Notice (CTN) Review for Power Generation Units Retirement Project of ASAB & Buhasa area. Client: GASCO, EPC Contractor: ETA.

 FEED Cost Estimation for Taweelah Gas Compression Station. (Class 3, EPC Cost Estimate,±15% Accuracy) Client: GASCO

 FEED Estimation for construction of Desalination Plant MED Units – M102 G1&2 for Al-Khafji Project. (Class 3, EPC Cost Estimate,±15% Accuracy) Client: KJO (Joint Venture of Kuwait Gulf Oil Company & Saudi Aramco)

 CAPEX & OPEX Calculation for Feasibility & Concept Optimization for Phase 1 & Phase 2 for Dukhan Production Facilities upgrade of Produced Water System, Compressor Station, Degassing System & Lift Gas Facilities. (Class 4, EPC Cost Estimate,±40% & 25% Accuracy) Client: Qatar Petroleum.

 FEED Estimation & Life Cycle Cost Analysis for Gas Turbine Replacement Project Phase-I, ASAB & BUHASA Area. Client: GASCO

 FEED Estimation for installation of two new offshore Platform IWJ8 & IWJ9 for Al-Khafji Joint Operation. Client: KJO (Joint Venture of Kuwait Gulf Oil Company & Saudi Aramco)

 Feed for Installation of 17 Nos. of New Risers in the existing Offshore Platform of Y1B & Y2B, KHAFJI, Saudi Arabia. Client: KJO (Joint Venture of Kuwait Gulf Oil Company & Saudi Aramco).

 FEED for Upgrade of Power Generation System at UMM AL-DALKH-CPC. Client: ZADCO

 FEED for Desalinated Water Distribution Network & Extension of Sea Water Fire Water Back up Network for Downstream Industries in RLIC. Client: Qatar Petroleum.

 Concept Study for Elevation of Flow Line 200 M Adjacent to Station Battery Limits for ASAB, Bu-Hasa & BAB Area. Client : Abu Dhabi company for Onshore Operation (ADCO)

 FEED Estimation for Installation of Coriolis Wet Gas Flow Meter- Client: Qatar Petroleum.

 FEED Estimation for 30 Nos. Oil Well Gas Lift Station, Buhasa Phase 1 – Client : Abu Dhabi company for Onshore Operation (ADCO)

 FEED Estimation for installation of Spheres in Borouge Petrochemical Complex, Ruwais - Client: BOROUGE

Kuwait National Petroleum Company
Engineer-Costing

   Apr 2013
— May 2014

Cost Estimation & Cost Control

Engineers India Limited & Others
Sr. Cost Engineer

   Jan 2005
— Mar 2013

 Cost Estimation of new grass root refinery Hindustan Mittal Energy Limited Bhatinda, India having capacity 9 MMTPA. Major units was CDU-VDU (9 MMTPA), NHT (1.14 MMTPA), CCR (0.5 MMTPA), ISOM (0.32 MMTPA), PFCC (2.22 MMTPA), DCU (2.77 MMTPA), SRU (2 x 300 TPD) ; Project Cost US$ 3.0 Billion.

 Indian Oil Corporation Limited Panipat , India Refinery expansion Project from 12 MMTPA to 15 MMTPA. Project Cost US$ 250 Million.

 Preparation of CAPEX, OPEX, Financial Analysis, Sensitivity Analysis for different alternatives of 9.0 MMTPA Grass Root Refinery cum Petrochemical Project of Hindustan Petroleum Corporation Ltd. Ratnagiri, Maharashtra, India. Project Cost US$ 6.0 Billion.

 Licensor Evaluation for OHCU, SRU, SDA Units for Oman Refineries & petrochemical Complex, Sohar, Oman.

 Configuration Study for different alternative of Alberta Refinery, Canada having capacity of 8.0 MMTPA. Project Cost US$ 2.0 Billion.

 EPCC cost Estimate for Rehabilitation & Adaptation Project, Algiers Refinery, Algeria. Project Cost US$ 1.5 Billion

 Basic Engineering Design Package (BEDP) for the Bitumen Blowing Unit (333,000 MTPA), Vacuum Distillation Unit (2640 TPD) & Offsite Facilities for Sohar Refinery Bitumen Project. Oman Refineries & petrochemical Complex, Sohar, Oman. Project Cost US$ 150 Million.

Ad
Ad
Ad