Associated with Lanco Anpara Power Limited, Anpara, UP as General Manager – EHS from May’18 to Sept’18
Earlier at Lanco Power Limited, Gurgaon since Sep’11
Additional In-Charge of Chemistry Department in Lanco Power Limited and HSE Head at Coal Bed Methane, Essar Oil Limited, Durgapur
Planned, developed and implemented environmental strategies and action plans that ensured corporate sustainable development
Strong ability to master a situation quickly and highly knowledgeable in a wide variety of professional disciplines and an expert at organizing & directing turnaround situations
Adroit in monitoring & supporting ongoing projects for HSE performance improvement, through site inspection, updating procedures, developing new procedures, action plan, training, conducting meetings, auditing, etc.
Competent in devising significant solutions for maintaining sound environmental conditions with proficiency in single-handedly managing the Internal Audits
Ensured compliance with environmental regulations and permit conditions on a daily basis and monitored parameters that are in accordance with permits, plans, government regulations, or company requirements, monitor future changes in the legislation for future impact on the company
An effective communicator & negotiator with strong analytical, problem solving and organizational skills

Education

Laxminarayan Institute of Technology
B.Tech Chemical Engineering

   Jul 1988
— Dec 1992

Experience

Lanco Power Limited
General Manager

   Sep 2011
— Sep 2018

May’18 --- Sept’18
Lanco Anpara Power Limited as General Manager – EHS & Chemistry
Responsible for management of environment, health & safety and Chemistry, conducting audits
Submitting relevant reports to all statutory bodies, Liasioning with UPPCB and MoEF, Ensuring environmental compliance
Monitoring the boiler water chemistry, Cooling water, Coal Analysis, ETP & STP operation
Sep ’11 --- Apr’18
Lanco Power Limited, Gurgaon as General Manager – Environment & Chemistry
Key Result Areas:
Initiating effective communication with MoEF & State Pollution Control Board by implementing IMS System
Submitting relevant documents & reports to all statutory bodies.
Environmental compliances of the upcoming Thermal & Hydro project
Extension of validity – Environment clearance of Lanco Mandakini Hydro Power Limited & Lanco Amarkantak Power Limited U # 3 & 4
Responsible for management of environment & chemistry of
2x600 MW Anapara, UP
2x300 MW Korba, Chattisgarh

Adani Power Limited
Sr.Manager

   Mar 2010
— Sep 2011

Mar ’10 – Sep ’11: Adani Power Limited, Mundra, Gujarat as Head – Environment
Key Result Areas:
Liaised with the Gujarat Pollution Control Board & MoEF
Monitored the environment which included ambient air quality monitoring, stack monitoring, effluent monitoring, noise level monitoring and marine monitoring
Established Environmental Laboratory, reports to all statutory bodies, CESS returns, hazardous waste returns, etc.
Developed eco-park, ensured waste minimization and carbon credits
Involved in environment clearance & public hearing of 3x660 MW at Adani Power Limited in Mundra, Gujarat and 5x660 MW at Bhadreshwar, Kutch, Gujarat

Essar Exploration & Production India Limited
Sr.Manager HSE

   Mar 2006
— Feb 2010

Mar ‘06 - Feb’10: Essar Group
Growth Path
March ‘06 - Jul ’08: Manager, Essar Excellence Centre,Mumbai
Aug ‘08 - Apr ’09: Sr. Manager – Environment, Mumbai
May ’09 - Feb’10: Sr. Manager – HSE, Durgapur
Highlights:
Adroitly managed Environment Impact Assessment for Essar Refineries and Petrochemicals, Jamnagar &, Matix fertilizers Durgapur and Public Hearing for the same
Excelled in submission of statutory reports to DGMS, Sitarampur, West Bengal Pollution Control Board and MoEF & application for laying the pipeline and GGS to DGMS at Coal Bed Methane, EEPIL, Durgapur\
Public hearing of Matix fertilizers

Major Projects Handled:
2000 MW Coal based Angul PP
2000 MW Coal Based Tori STPP, Jharkhand
1200 MW Coal Based Chattisgarh STPP
ESA Report for Essar Oil Ltd, Vadinar
Essar SEZ,Hazira
1800 MW Mahan STPP
483 MW VPCL, Jamnagar
Estimation of GHG emissions of three facilities for Essar Group

Reliance Energy Limited
Dy.Manager

   Jun 1993
— Mar 2006

Essar Group

June ‘93 - Mar ’06: Reliance Energy Ltd., Dahanu
Growth Path
June’93 – Apr’99: Senior Engineer
Apr’99 – May’99: Dy. Manager (Chemical Department)
May’99 – Mar’06: Dy. Manager (Environment Monitoring Group)
Highlights:
Successfully conducted:
Air & Water Quality Monitoring Activities at Dahanu Thermal Power Station and in Dahanu region
Air Quality Modeling Studies for calculating GLC’s in and around Dahanu Thermal Power Station. Land Use/Land Cover Pattern Studies for the Dahanu region using satellite imageries
Adroitly implemented Management Information System on the environmental performance of the Dahanu Thermal Power Plant at Dahanu (500MW)
Significantly conducted Environment Impact Assessment for 4080 MW gas based CCPP at Shahpur, Maharashtra