Electrical Superintendent


Last Updated: 2nd October 2018 (over 4 years ago)

Address
Turkey

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
25 to 34

Qualification Level
Masters

Languages
English, Russian, Turkish

Summary

I have 10 years of international business experience construction and commissioning with the legal and administrative requirements of legal entities/companies, project development and management in line with international codes, standards, policies and conventions ,and have pre-construction, construction, commissioning, operation and expansion phases’ experiences in mainly energy sector within very reputable companies such as TANAP(The Trans-Anatolian Natural Gas Pipeline), ÇALIK, PALMET and EMTA.

My experiences specifically cover the construction and commissioning of the systems at below;

I. Natural Gas Pipeline Main Control Center+help design of the MCC,
II. PMS-SCADA-ISCC-BVS-INTERFACES-CONTAINER
III. GE LM6000 and 9E Gas Turbine and Generator Electrical Utilities
IV. 380 kV, 220 kV,154 kV, 110 kV Air İnsulated Switchyard, 110 kV Gas Insulated Switchyard, 35 kV and 10 kV Switchyard All Electrical, Commissioning and Mechanical Works
V. Simple Cycle and Combined Cycle Power Plant System (Cooling Tower, Fin Fan Cooler, Condenser, Lighting, UPS system, 110V DC, 48V DC system etc.)
VI. GE Mark VIE and SIEMENS SIMATIC PCS 7 Distributed Control System
VII. BOP Power Distribution System (HV (400,154,132kV,110 kV), MV (11 kV), LV Systems) and Instrument, Control(I&C)
VIII. GE Thermodin Steam Turbine and Generator
IX. Heat Recovery Steam Generator electrical equipment
X. Coordination of Ministry of Electric of Turkey, Ministry of Electric of Iraq, Ministry of Electric of Turkmenistan(TURKMENENERGO), AŞENERGO and Ministry of Energy of Turkey(EPDK), Turkish Electricity Transmission Corporation (TEIAS). (land acquisition, environmental permits, connection and system use agreements, design approval and provisional acceptances of Energy Transmission Lines and Switchyard)
XI. Managing Primary Frequency and Reactive Power Control
XII. Subcontractor and My Company Progress Payments
XIII. Help Design of Combined Cycle Power Plant
XIV. Procurement
XV. Completion of red marks and finalization of as-built
XVI. Healty&Safety&LOTO

I have BSc in Electrical and Electronic Engineering, MSc in Lightning system, IOSH, GE Gas Turbines Training Certificates. On a leadership level, I appreciate the challenge of creating effective, functional, and fun teams. I am not afraid to innovate, and may be reasonably accused of thinking of new and different ways to solve problems. I have a sense of humor, a beautiful family, and a finisher's t-shirt from a charity bike ride.

Keys: Project management, Natural Gas Pipeline, Main control Center, Power Plant, 380 kV, 220 kV, 110 kV, 154 kV Air İnsulated, 110 kV Gas Insulated Switchyard, GE LM6000 Gas Turbine and Generator, Balance of Plant System, Distribute Control System(Ge MarkVIE,Siemens Simatic S7)

Education

İnonu University
Master Degree-Department of Electrical and Electronic Engineering

   Jan 2011
— Jan 2013

Thesis: Protection by Faraday Cage and methods for increasing the efficiency of Grounding Resistance

İnonu University
Bachelor Degree- Electrical and Electronic Engineering

   Sep 2005
— Jun 2009

Experience

TANAP Doğalgaz A.Ş
Construction and Maintance Engineer

   May 2017
— Current

Project informations;7 compressor stations, 4 measuring stations, 11 pigging stations, 49 block valve stations,2 off-take stations to supply Turkey’s national natural gas network,2 main control center

Task:
- Main Control Center and BVS’s Scada, Electrical installation and commissioning works (PMS-SCADA-ISCC-BVS-INTERFACES-CONTAINER)
-Help designing of the Main control center’s systems with EPCM (Worley Parson) (PMS-SCADA-BVS-INTERFACES-CONTAINER)
-Operation of the main control center

-Support procurement team in terms of technical, legal and administrative requirements for the services requested.
-Monitoring of the construction progress and progress report on site regularly.
-Review, comment and approve on contractors’ calculation and technical drawings
-Healty&Safety&LOTO
-Coordination among the necessary departments of the Company and contractor, meetings based on Scada, interface, construction, progress status.

Keys: construction, commissioning, design, consulting, Execution of coordination, scheduling, technical support,

Çalik Energy A.Ş
Electrical Group Cheif

   Feb 2013
— Jul 2016

Project information: Çalık Energy, AST Project, EPC Contractor; End User: Ministry of Electric, Turkmenistan 1-piece Dispatch Center, 5 Pieces 220 kV substations, 22 pcs 110 kV Substation, 29 pcs 35 kV Substations, 140 pcs 10 kV substation, 7 pcs 110 kV Over headline (40 km), 24500 m 220 kV Over headline, 100 km 35 kV Underground cable, 418 km 10 kV Underground cable, 6 pcs Underground 110 kV Cable
Task:
-All the management of the Project construction and commissioning works(1-piece Dispatch Center, 3 Pieces 220 kV substations, 10 pcs 110 kV Substation, 15 pcs 35 kV Substations, 70 pcs 10 kV substation, 7 pcs 110 kV Over headline (40 km), 24500 m 220 kV Over headline, 100 km 35 kV Underground cable, 418 km 10 kV Underground cable, 6 pcs Underground 110 kV Cable)
-Coordination among the necessary departments of the Company with the Ministry of Energy of Turkmenistan, Turkmen Electricity Transmission Corporation municipality of the Ashgabat, Turkmen Electricity Distribution Corporation and Third Party Department
-Support procurement team in terms of technical, legal and administrative requirements for the services requested.
Construction and Maintance Engineer, Turkey, TANAP Natural Gas Pipeline Project
Electrical Group Cheif, Turkmenistan, Increasing the Reliability of Power Supply to the City of Ashgabat Project
-Monitoring of the construction progress and progress report on site regularly.
-Provide engineer solutions for field raised RFIs in-coordination with engineering, review, comment the calculation and technical drawings ,Red-Mark and As-Built.
-Healty&Safety&LOTO
Keys: Design, construction, commissioning, Execution of coordination, management, selection of contractors and management of relevant contracts, scheduling, technical support, consulting.

Project information: Çalık Energy, IRAQ Ninawa 750 MW Power Plant, EPC Contractor; Employer: Ministry of Electric, IRAQ
Task:
-All the management of the Project construction and commissioning works of the all electrical and I&C works(9E Turbines and related equipments, (HV (400 kV, 132 kV), MV, LV Systems, Distributed Control System (GE Mark ViE), Water Treatment and Crude Oil Treatment system, I&C, BOP,as-builts,
-Support procurement team in terms of technical, legal and administrative requirements for the services requested.
-Monitoring of the construction progress and progress report on site regularly.
-Provide implace engineer solutions for field raised RFIs in-coordination with engineering, review, comment the calculation and technical drawings ,Red-Mark and As-Built.
-Healty&Safety&LOTO
- Coordination among the necessary departments of the Company with the Ministry of Energy of Iraq, Iraq Electricity Transmission Corporation municipality of the Mosul, Iraq Electricity Distribution Corporation and Third Party Department.
Keys: Execution of coordination, Turbine, management, scheduling, technical support, design, construction, commissioning, consulting.

Palmet Energy A.Ş
Electrical Construction Commissioning Site Manager,

   Feb 2012
— Feb 2013

Project İnformation: PALMET, 200 MW ALES Combine Cycle Power Plant, Employer

Task:
-Responsible of the all the management of the Project construction and commissioning works of the all electrical and I&C works(LM600 Turbines and related equipments, (HV (154 kV, 35 kV), MV, LV Systems, Distributed Control System (GE Mark Vie), Water Treatment, I&C, BOP, as-built, DCS(siemens simatic pcs 7)
-Support procurement team in terms of technical, legal and administrative requirements for the services requested.
-Provide engineer solutions for field raised RFIs in-coordination with engineering, review, comment the calculation and technical drawings ,Red-Mark and As-Built.
-Monitoring of the construction progress and progress report on site regularly.
-Healty&Safety&LOTO
- Coordination among the necessary departments of the Company with the Ministry of Energy of Turkey, Turkish Electricity Transmission Corporation (TEIAS), municipality of the Aydın City, Turkish, Electricity Distribution Corporation and Third Party Department.
Keys: Execution of coordination, Turbine, management, scheduling, technical support, design, construction, commissioning, consulting.

EMTA ENERGY
Construction Site Manager

   Jun 2010
— Jan 2012

Project İnformation: EMTA ENERGY, Subcontractor; EPC Contractor METKA; Employer RWE&TURCAS
380 Kv Air Insulated Substation (7 bays)
Task:
-Responsible of the all the management of the Project construction and commissioning works of the all electrical, civil and mechanical works
-Responsible for the coordination of the Ministry of Energy of Turkey, Turkish Electricity Transmission Corporation (TEIAS), municipality of the Denizli City, Turkish, Electricity Distribution Corporation .
-Monitoring of the construction progress and progress report on site regularly.
-Provide implace engineer solutions for field raised RFIs in-coordination with engineering, review, comment the calculation and technical drawings ,Red-Mark and As-Built.
-Healty&Safety&LOTO
Project İnformation; EMTA ENERGY, Subcontractor; Employer Enerjisa DAM 154 kV Overhead Line, Köprü DAM 154 kV Overhead Line, Kavşakbendi DAM 154 kV Overhead Line, ADANA, TURKEY and Murat DAM 154 kV Air insulated Switchyard
Task:
-Responsible for the coordination of the Ministry of Energy of Turkey, Turkish Electricity Transmission Corporation (TEIAS), municipality of the Adana and Adıyaman City, Turkish, Electricity Distribution Corporation .
-Responsible of the all the management of the Project construction and commissioning works of the all electrical, civil and mechanical works
-Responsible of the Progress Payment, engineering department, procurement department
Keys: Execution of coordination, 154 Kv AND 380 Kv Substations, management, scheduling, technical support, design, construction, commissioning, consulting.

Getsan Transformer
Project Manager-

   Jun 2009
— Dec 2009

Project İnformation: Manufacturing of the Transformer
Task:
-Responsible for Design of the Transformer, Sales of the Transformer, Commissioning and tests of the Transformer, progress payment, management of the factory.
Keys: Execution of coordination, Transformer, management, scheduling, design, tests.