Piping Designer in Design, Detail Engineering, Feed & Field Engineering Projects including overseas site experience.


Last Updated: 26th November 2019 (over 2 years ago)

Address
India

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
45 to 54

Qualification Level
Trade Qualification

Languages
English, Hindi, Punjabi

Summary

Rakesh Bhasin
Mob.: +91 9811219922, Email: RakeshBhasin@gmail.com
Current date 20 September., 2019 Principal Designer
Profile: Highly skilled Designer (Plant layout & Piping). A Dynamic professional with more than 26
years of experience in Design, Detail Engineering, Feed & Field Engineering Projects including
overseas site experience.
Principal Designer Amursky Gas Processing Plant
Fluor Phase 4, Gas Processing Plant Phase 1
06/2019 to Present Svobodnenskiy District, Russia
Project scope: The AGPP facility consists of Licensed and non-Licensed process units, as well as supporting
utility and off-site (U&IO) facilities, mainly – Gas Dehydration / Mercury Removal Unit, Gas Fractionation Unit and
NGL Desulfurization Unit.
Involve in planning / designing of Steam and Condensate Supply & Return for the steam traced lines for the
whole plant. Developed Steam & Condensate Manifold location plan and prepared steam traced isos for Lead/
Tail tracers to get the final MTO.
Design Supervisor Spence Growth Project
Fluor SGO WP2 Concentrator Project, (A6YF)
11/2017 to 05/2019 Sierra Gorda, Santiago, Chile
Project scope: In this project, Mineral processing will be carried out by conventional flotation methods to produce
copper and molybdenum concentrate. It is a work share project from Fluor Santiago Office to do its Detail
Engineering at ND. It is an Automated and fully Integrated Project.
Responsible for Piping Layout & all piping deliverables as per Client Standards & Specifications keeping
consistent quality in the Project. I am Coordinating with Prime Office (Santiago) for developing / designing the
piping layout & S3D model. Apart from that I am involved in piping lead activities also.
Reviewer cum Checker TCO, Tengizchevroil
KPJV – Almaty, Kazakhstan Future Growth Project
08/2017 to 11/2017 Atyrau, Kazakhstan
Project scope: There are Multi Well Pads for High Pressure, Medium Pressure & Low pressure.
Visited at KPJV-Almaty Kazakhstan office on an assignment as a reviewer cum checker for 3 months.
Primary responsibility to yellow off PIDs based on Isometrics to be IFCd as per project PWIs / standards keeping
consistent quality in the Project.
Design Supervisor HES International
Fluor Hartel Tank Terminal Project
04/2017 to 07/2017 Port of Rotterdam, Netherlands
Project scope: It’s a project for storage facility of 5 services like Diesel, Gasoline, Kerosene, Jet Fuel & Gasoil.
New Delhi scope was to provide MTO (Manual + S3D dump), Composite Transposition along with sections and
S3D modelling. It is a work share project from Amsterdam Office to do its FEED activities upto 30% Model
Review.
Responsible for design, Piping Layout & all piping deliverables as per Client Standards & Specifications keeping
consistent quality in the Project. I was Coordinating with Amsterdam Team for developing / designing the piping
layout & S3D model. Apart from that I was assigned for layout designing of PV Manifold. PV Manifold having 17
Pumps & approx.620 plus MOVs. To fix all Pumps & MOVs in the designated foot print area (70.0m x 50.0m) on
plot plan, was a challenging and an interesting task for me. Prime Office appreciated the ND efforts.

Experience

Fluor Daniel India Pvt Ltd.
Principal Designer Piping

   Dec 2013
— Current

Principal Designer Amursky Gas Processing Plant
Fluor Phase 4, Gas Processing Plant Phase 1
06/2019 to Present Svobodnenskiy District, Russia
Project scope: The AGPP facility consists of Licensed and non-Licensed process units, as well as supporting
utility and off-site (U&IO) facilities, mainly – Gas Dehydration / Mercury Removal Unit, Gas Fractionation Unit and
NGL Desulfurization Unit.
Involve in planning / designing of Steam and Condensate Supply & Return for the steam traced lines for the
whole plant. Developed Steam & Condensate Manifold location plan and prepared steam traced isos for Lead/
Tail tracers to get the final MTO.
Design Supervisor Spence Growth Project
Fluor SGO WP2 Concentrator Project, (A6YF)
11/2017 to 05/2019 Sierra Gorda, Santiago, Chile
Project scope: In this project, Mineral processing will be carried out by conventional flotation methods to produce
copper and molybdenum concentrate. It is a work share project from Fluor Santiago Office to do its Detail
Engineering at ND. It is an Automated and fully Integrated Project.
Responsible for Piping Layout & all piping deliverables as per Client Standards & Specifications keeping
consistent quality in the Project. I am Coordinating with Prime Office (Santiago) for developing / designing the
piping layout & S3D model. Apart from that I am involved in piping lead activities also.
Reviewer cum Checker TCO, Tengizchevroil
KPJV – Almaty, Kazakhstan Future Growth Project
08/2017 to 11/2017 Atyrau, Kazakhstan
Project scope: There are Multi Well Pads for High Pressure, Medium Pressure & Low pressure.
Visited at KPJV-Almaty Kazakhstan office on an assignment as a reviewer cum checker for 3 months.
Primary responsibility to yellow off PIDs based on Isometrics to be IFCd as per project PWIs / standards keeping
consistent quality in the Project.
Design Supervisor HES International
Fluor Hartel Tank Terminal Project
04/2017 to 07/2017 Port of Rotterdam, Netherlands
Project scope: It’s a project for storage facility of 5 services like Diesel, Gasoline, Kerosene, Jet Fuel & Gasoil.
New Delhi scope was to provide MTO (Manual + S3D dump), Composite Transposition along with sections and
S3D modelling. It is a work share project from Amsterdam Office to do its FEED activities upto 30% Model
Review.
Responsible for design, Piping Layout & all piping deliverables as per Client Standards & Specifications keeping
consistent quality in the Project. I was Coordinating with Amsterdam Team for developing / designing the piping
layout & S3D model. Apart from that I was assigned for layout designing of PV Manifold. PV Manifold having 17
Pumps & approx.620 plus MOVs. To fix all Pumps & MOVs in the designated foot print area (70.0m x 50.0m) on
plot plan, was a challenging and an interesting task for me. Prime Office appreciated the ND efforts

Design Supervisor Tesoro
Fluor Tesoro CPUP Project
10/2015 to 03/2017 Anarcortes Refinery, Anacortes, WA
Project scope: It is a work share project from AV Office to ND Office for detail engineering to enhance the
capacity of Isomerization unit. Visited AV office for Piping Alignment meeting for 2 Week.
I am involved in Design coordination and supervision for both units (ISOM / NHT). Resolving design issues &
inter-discipline issues, efficiently. I was Coordinating WebEx meeting with AV office, along with Area Lead &
team. To maintain consistent quality in the Project, I used to provide latest Job Instruction, Latest DRIs, Key
Schedule dates, etc. to plan their activities and interact with them regularly. It was successfully completed within
schedule with quality & quantity and was appreciated by the Prime Office and the Client with “Job Well-done”.
Design Supervisor Ma’aden
Fluor Ma’aden - Umm Wu’al Phosphate Project
12/2015 to 01/2016 Saudi Arabia
Project scope: It was a workshare project with Fluor Dublin, Greenville and New Delhi offices, in which ND to
provide IFC Isometric extraction service.
The challenge was to to extract and issue 1200+ isometrics in 6 weeks and later the Isometric count increased to
1570. It was successfully completed within schedule with quality & quantity and was appreciated by the Prime
Office with “Job Well-done”.
Principal Designer Reliance
Fluor Reliance JGP Project
12/2013 to 09/2015 Jamnagar, INDIA
Project scope: LTHR was the one of the Open Arts unit in Reliance JGP Project. It’s a Sin gas recovery unit
plant.
I was assigned LTHR area as an Area Lead after completing 30% MR with client. After 30% MR, there are many
design changes have been done by revising our piping layout, stress analyses, etc. to optimize the design. We
have save huge quantity of steel and spring supports by redesigning our Air cooler main piping along with stress
analyses and for that LTHR Unit got Client appreciation also after 90% MR