Project Planning, Project Management and Cost Controlling


Last Updated: 6th March 2018 (over 4 years ago)

Address
India

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Degree

Languages
English, Hindi

Summary

• Experienced in Project planning of Power plant 4 X 30 MW, exposed to all packages; Coal handling Plants, Water system, Auxiliary & Cooling water system, Boiler, Turbine & Generator package, HP Piping, Plant Air & Compressed air system, Plant electrical systems, HVAC, Fire hydrant and protection system, Ash Handling system.
• Experienced with Power Plants: 4X30MW CPP(Overall), 1X600MW(Boiler & BOP package), 5X135MW (Boiler, CHP & BOP package
And Others: 132KV Substation (Presently) & Ducting only (1x1000MW Nuclear Power Plant).
• Significant experience in working with customers – Lender Engineers, Project managers and Technical teams for securing & executing concurrent projects.

Education

NOORUL ISLAM COLLEGE OF ENGINEERING
MECHANICAL ENGINEERING

   Jun 2001
— Apr 2005

BE IN Mechanical engineering, passed out with 74%

Experience

ALFANAR CONSTRUCTION
Senior Engineer Planning

   May 2015
— Current

Scheduling & Cost Control Engineer in Riyadh, Saudi Arabia

ESSAR POWER ORISSA LTD
Planning - Deputy Manager

   May 2011
— Apr 2015

Schedule & Planning engineer-
Monitored overall Power plant project 4 x 30 MW CPP.
Main role started from Testing & commissioning activities and establishing smooth Operation & maintenance .
Established Plant maintenance system in SAP.

EDAC EGNINEERING LTD
Senior Engineer Planning

   Jun 2007
— May 2011

Schedule & cost engineer
1x600MW, NCTPS stage-II, Make: BHEL, India
5x135MW, VEDANTA ALUMINIUM LTD, CPP, Make: SEPCO-III, china
Boiler & BOP package

PES engineers pvt ltd
Junior engineer

   Dec 2005
— Oct 2006

Ducting package - 2x1000MW,
Studying drawing, Learning Co-ordinates etc.

Search Jobs by Industry

Ad
Ad
Ad