B.E(Mechanical engineer) with 13 years experience as a construction professional


Last Updated: 24th March 2020 (over 2 years ago)

Address
United Kingdom

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
25 to 34

Qualification Level
Degree

Languages
English, Hindi

Summary

1.Carry out site engineering and supervision of all Construction works carried out by contractors. Including providing direction to contractors for site installation and ensuring that all works are carried out as per specifications and standards established.
2.Site Job planning, quantity assessment and preparation of resource, consumables, manpower requirements.
3.Understanding overall construction sequence and accordingly plan coordinate and implement various activities taking care of various inter disciplinary interfaces.
4.Monitor construction productivity and schedule performance and investigate reasons for less than satisfactory performance.
5.Review contractor look-ahead schedules and advice contractor management on activities start/finish deviations from the Construction Planning.
6.Ensure contractor workforce induction and familiarization on relevant PTW processes is implemented out prior to start of works.
7.Assisting planning and project control department to prepare various levels of schedules by providing them scope of work, Man power utilization and daily work progress by stage wise and thus aiding project control and project costs.
8.Interface with all on-site departments as required for resolving problems and raise SER if any conflicts between design and site construction.
9.Construction feasibility study, identifying constraints and seek to provide resolutions
10.Verification on site the completed and inspected works against the progress report submitted by contractor.
11.Liaise with Construction head/Project Engineer through all phases of projects for Construction related matters.
12.Participated in preparation of method statement, RA for construction and Revamp shutdown projects
Conducting safety Audit (CFA, HSE walkthrough) and ensure the compliance from Contractors.
13.Witness of alignment, orientation, dimensions and testing of installed piping.
14.Responsible for accuracy in construction of all structures in accordance to drawings and specifications.
15.Preparation of field piping system test packages, including marked up P &ID, LDT and piping Isometrics.
16.Closely follow up the Test-Packs & Preparing punch list of piping systems and ensure Contractor liquidating the punch points to get mechanical clearance from QMD and O &M.
17.Prepare ITP documents, system wise dossiers and hand over to Operation department.
18.Co-ordinate testing and commissioning requirements.

Education

Government college of engineering, Tirunelveli,Anna university
B.E( Mechanical engineering)

   Jul 2002
— Apr 2006

Experience

L&T Hydrocarbon engineering limited
Production

   Sep 2019
— Jan 2020

1.Responsible for all construction activities from enabling to load out PAR/PAU modules in barges.
2.Preparing overall module construction sequence plan includes structure assembly, piping, insulation, fireproofing, electrical and instrumentation, pre commissioning.
3.Prepare sign off plan, resource plan and manpower deployment plan for contractors
4.Responsible for resolving engineering issues, work progress and complete the job within schedule.
5.Interface with all departments Planning, warehouse, structure ,piping, electrical, instrumentation and logistics
6.Liaise with Construction head/Project Engineer through all phases of projects for Construction related matters
7.Preparation of IWP packages and executing the jobs as per IWP packages
8.Responsible for accuracy in construction of all structures in accordance to drawings and specifications
9.Lead a team includes all discipline stakeholders and act as module incharge
10.Ensure closing of final punch list before PAR/PAU load out to barges
11.Conduct safety field audit and ensure compliance from contractors

Reliance Industries limited
Construction Engineer

   Mar 2015
— Apr 2019

1.Carry out site engineering and supervision of all Construction works carried out by contractors. Including providing direction to contractors for site installation and ensuring that all works are carried out as per specifications and standards established.
2.Site Job planning, quantity assessment and preparation of resource, consumables, manpower requirements.
3.Understanding overall construction sequence and accordingly plan coordinate and implement various activities taking care of various inter disciplinary interfaces.
4.Monitor construction productivity and schedule performance and investigate reasons for less than satisfactory performance.
5.Review contractor look-ahead schedules and advice contractor management on activities start/finish deviations from the Construction Planning.
6.Ensure contractor workforce induction and familiarization on relevant PTW processes is implemented out prior to start of works.
7.Assisting planning and project control department to prepare various levels of schedules by providing them scope of work, Man power utilization and daily work progress by stage wise and thus aiding project control and project costs.
8.Interface with all on-site departments as required for resolving problems and raise SER if any conflicts between design and site construction.
9.Construction feasibility study, identifying constraints and seek to provide resolutions
10.Verification on site the completed and inspected works against the progress report submitted by contractor.
11.Liaise with Construction head/Project Engineer through all phases of projects for Construction related matters.
12.Participated in preparation of method statement, RA for construction and Revamp shutdown projects
13.Conducting safety Audit (CFA, HSE walkthrough) and ensure the compliance from Contractors.
14.Witness of alignment, orientation, dimensions and testing of installed piping.
15.Responsible for accuracy in construction of all structures in accordance to drawings and specifications.
16.Preparation of field piping system test packages, including marked up P &ID, LDT and piping Isometrics.
17.Closely follow up the Test-Packs & Preparing punch list of piping systems and ensure Contractor liquidating the punch points to get mechanical clearance from QMD and O &M.
18.Prepare ITP documents, system wise dossiers and hand over to Operation department.
19.Co-ordinate testing and commissioning requirements.

Afcons Infrastructure limited
Engineer- Fabrication

   Jul 2006
— Feb 2015

1.Interpretation of drawings and work out the quantities.
2.Involved in the preparation of requirement of materials, consumables, manpower and equipment's in order to achieve the target.
3.Expediting procurement department for ordering various material for the proper front availability for site works.
4.Instrumental in effective utilization of man power, equipment's and other resources.
5.Day to day coordination of construction, progress monitoring and workout necessary action plan for backlog activities.
6.Conducting meetings with field Supervisors as required to effective execution of work /daily progress review.
7.Preparation of monthly sign off plan as per front availability and expediting.
8.Preparation of time cycle for each and every activity involved in the job.
9.Manage site queries (including material substitution, if necessary) revert to the head office engineering team and/or Client when needed for securing the technical answers.
10.Provide technical assistance to Junior Engineers, Supervisors and Contractors.
11.Daily tool box talk on safety and HSE Monitoring.
12.Responsible for issuing and closing work permits in ISBL area.
13.Fabrication of jigs, fixtures and ensures optimum utilization.
14.Preparation of method statement for erection activities including crane positioning, Rigging methods.
15.Assisting Quality department to conduct WPQR, welder qualification, inspection of weld joints and Non-destructive examination of weld joints.
16.Responsible for accuracy in construction of all structures in accordance to drawings and specifications.
17.Witness of alignment, orientation and dimensions of installed piping.
18.Mechanical clearance of pipe lines, hydro testing and boxing up of loops.
19.Preparation of Reconciliation statements for structural steel and consumables.
20.Scrutinize contractor's bills and submit to Site in charge.

Ad
Ad
Ad