DCS/Control Room Engineer with 8+ years of experience in 210 MW


Last Updated: 24th May 2017 (over 5 years ago)

Address
India

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
25 to 34

Qualification Level
Degree

Languages
English, Hindi

Summary

Dear Sir/Madam,

I take this opportunity in introducing myself as Raghunath, residing at Tuticorin. I completed my B.Tech in the year of 2008-09 under Acharya Nagarjuna University, Andhra Pradesh and completed my PGDC in Thermal Power Plant Engineering at NPTI, Neyveli in the academic year of 2011-12.

I have 6+ years of operation experience (Boiler & Turbine) in 2 x 210 MW TPP and 1.9 years of experience in 2 x 80 MW TPP and currently working as a Senior DCS/ Control Room Engineer in Wartsila India Ltd.

Please do find my CV below which gives you more details, regarding my Professional activities and academic details.

Notice Period : 15 days / Immediate.

Thanks with regards,

Raghunath.Venegella
Mobile:+91-8608630149.
E-Mail: raghunath.2307@gmail.com
raghunath_2307@yahoo.co.in

Current Location : Tuticorin
Willing to Relocate: Yes

Education

National Power Training Institute
Post Graduation Course in Power Plant Engineering

   Mar 2011
— Feb 2012

 Completed PGDC (GEC) in Power Plant Engineering from National Power Training Institute, Neyveli in 2012 with Distinction (74%).

RVRJC Engineering College
B.Tech

   Jun 2006
— May 2009

 B.Tech in Electrical and Electronics from RVR & JC Engineering College, Guntur in 2009 with Distinction (80.30%).

MBTS Government Polytechnic College
Diploma

   Jun 2002
— Apr 2005

 Diploma in EEE from State Board of Technical Education in 2005 with Distinction (76.44%).

Experience

Wartsila India Ltd
DCS/ Control Room Engineer

   Sep 2015
— Current

Organization : M/s Wartsila India Ltd.
Report to : Shift Incharge-Operations
Duration : 04th September 2015 - Till date.
2 X 80 MW Power Plant - Tuticorin:
 BTG supplied by M/s BHEL.
 Boiler: Sub critical, assisted circulation, Corner fired, drum type, balance draft.
 Turbine: Sub Critical Condensing Steam Turbine, Single cylinder double casing and ACC Condensation system.
Designation: DCS Engineer [Operations]
Duties, Roles and responsibilities:
 Working as a Control Room Engineer/Desk Engineer (Operations).
 To monitor all the activities and performance of the Boiler & Turbine in the assigned shift.
 Responsible for smooth Start-up and Shutdown of Turbine. Whenever required, taking and giving proper instructions & guidance from Subordinates during normal running & plant emergency condition.
 Handle the emergencies like Black out, Load throw-off and Islanding conditions.
 Ensure safety of men and equipment during operations with PPE norms, 5s, BBS and LOTOV procedures.
 Prepared & Implemented the Operation sequence of Boiler lit-up - Rolling - Synchronization - Coal Mill & BFP – Load rising & proper shutdown.
 Familiar with Standard Operational Procedures (SOP’s) of Boiler & Turbine startup (Cold, Warm & Hot).
 Ensure proper entry of all Parameters/Readings in LOG Books and LOG Sheets in assigned shifts.
 Permit To Work (PTW) system with proper maintenance activities.
 Coordinate the functioning of Field Engineers.
 Reporting to UCE and Shift in charge all the shift activities timely.
 Preparing TG area defects list, punch points and follow up the same to completion of the job.
 Active participation in My Ideas, Kaisen, SGA activities.

Surana Power Ltd
DCS/ Control Room Engineer

   Jul 2009
— Aug 2015

Organization: M/s Surana Power Ltd .
Plant Capacity: 2 X 210 MW Power Project.
Report to : Shift Incharge-Operations
Duration : 01st July 2009- 31st August 2015
Duties, Roles and Responsibilities:
 Worked as a Field Engineer in Turbine area.
 To monitor all the activities of the assigned area in the assigned shift and timely reporting to shift in charge.
 Scheme tracing of BTG Diagrams.
 Involved in checking of Interlock & Protection of various equipment & system of TG, Boiler & their auxiliaries.
 Actively involved in the first Boiler lit-up, Turbine Rolling & oil synchronization, Coal Synchronization.
From 1st March 2012 to 31st August 2015.
 Worked as a Turbine Desk Engineer.
 Perform the Synchronization and load rising of unit in efficient manner.
 Ensure proper maintain of all unit parameters.

Search Jobs by Industry

Ad
Ad
Ad