Project Manager, Strategic Planner and Risk Manager
Last Updated: 4th October 2020 (over 2 years ago)
Summary
A deadline-driven project leader with a proven track record in identifying and managing risks & opportunities, embracing change, and optimizing outcomes in complex situations. I possess a dynamic mindset to deal with conflicting priorities with a strong sense of accountability and commitment, and strategic thinking required to keep a project on course in line with schedule, budget, quality and contractual terms.
I am well known by the people who worked with me as a specialist in turning around problematic packages of work and bringing them to successful completion, and implementing large-scale process and regulatory permits approval processes with minimal impact on day-to-day operations. I have a pro-active approach and am always looking for ways to improve the execution of works and develop strategies to eliminate or minimize bottlenecks in progress, to achieve better outcomes.
Ability to work in projects with a high-pressure, logistically complex and hazardous environment within cost effective guidelines. I promote working with others in a creative and practical manner, whilst reinforcing the need to develop an attention to detail towards successful delivery of projects. I always work closely with senior management and team to ensure a consistent and high standard of work is achieved at all times. Ability to rethink design and construction methodologies whilst maximizing productivity and being contractually focused. Over the years I have developed a strong ability to effectively & efficiently communicate at all levels; verbally and in writing, liaise and resolve conflicts & problems diplomatically & efficiently.
As an added value to my project management & project engineering experience I have developed solid skills in managing the sustainable development aspects through managing the delivery of sustainable, innovative and practical design and construction solutions.
PROFESSIONAL CERTIFICATIONS
Certified Professional Manager (CPMgr)
Mini-MBA in Practice
Certified Green Construction Professional
Certified Green Operations Professional
Certified Professional Engineer
Certified Green Professional (GSAS-CGP) for Design & Build
Certified Occupational Health & Safety Professional
Certified International Business Manager
Education
Advanced Certificate in Project Management
Jun 2012
— Dec 2012
Graduate Certificate of Business Administration
Mar 2012
— Jun 2013
BSc in Civil Engineering
Sep 1993
— Oct 1998
Experience
Project Management Consultant
Jul 2019
— Current
Driving improvement activities on processes to improve cost, quality and client value. Providing solutions for cost reduction & revenue growth. Managing projects and related activities on behalf of the client within given constraints of time, budget and quality. Supporting clients to ensure scope, program of works and costs are achievable and reasonable. Conducting regular reviews to ensure project is on track and all project documentation is updated and communicated with the relevant stakeholders on a timely basis. Assisted clients to ensure alignment on project goals and deliverables, risks have appropriate mitigation and contingency plans.
Clientele:
Jordan: Mahmoud Bani Hani Construction Contracting Ltd, Al Uyun Municipality, Ard Al Diar Housing Company, Longest Path for Project Management Company.
Cyprus: Pascal International English School – Building rehabilitation and expansion project.
Qatar: Gulf Organization for Research and Development
Project Manager and Sustainability Advisor
Jan 2017
— Jun 2019
On the Saudi Arabian assignment, I led an in-house team and operated as the sole interface with all relevant Saudi public and private sectors’ stakeholders/authorities to plan and manage on behalf of GORD the development of Estidama (sustainable project development & management) system, including institutional setup, enablers, and tools for the Saudi Arabian Ministry of Housing. The system aims to improve the quality and performance of projects towards highly qualitative and sustainable built environment throughout the kingdom and influence the larger economy by positively impacting construction businesses e.g. those of services providers (Design Consultants, Project Management Consultancy firms, Contractors, etc.), construction materials suppliers/manufacturers, and various industries associated with the construction sector.
Project Manager
Nov 2013
— Jun 2016
For Akoya by DAMAC project, I successfully utilized my engineering technical and management skills in resolving a number of pending issues during the construction supervision phase. For Diar Ras Al Hadd project, As KEO International Consultants were engaged by the client; Qatari Diar to provide PMC services including the Project Management, Construction Management and Cost Consultancy, my role was to manage the infrastructure design and cost control of this Integrated Tourist Complex (ITC) Resort in Ras Al Hadd, Oman. The project consists of two hotels, dozens of luxury villas, community center, retail buildings, staff accommodation, and other associated facilities including roads, landscaping and infrastructure.
Project Manager
Mar 2012
— Nov 2013
Provided project leadership to effectively 1) identify and proactively manage all critical interfaces, emerging risks, issues and constraints and guided the team in addressing those challenges, 2) evaluate the design and construction development alternatives. Managed stakeholders and project public contact strategies including public displays, press & media releases. Undertook project presentations for the Parliamentary Standing Committee on Public Works (PSCPW) at the Parliament House.
Construction Manager
Aug 2009
— Feb 2012
I was responsible for the demolition of the existing terminal and construction of the new terminals, piers, installation of the associated passenger boarding bridges including concrete and steel structures, curtain walling & sky lighting, and infrastructure package of work, including the bridge, taxiways, aprons, rehabilitation of the existing runway and shallow & deep services. Planned and managed day-to-day construction activities. Reviewed the constructability of the design and developed construction methodologies. Set goals and priorities concerning progress, contracts, cost, HSE, scope change, and risks & issues management. Allocated, and managed the performance of resources. Managed quality assurance & quality control aspects. Procured and managed subcontractors. Administered the contract. Identified, analyzed and managed claims. Leveraged the well developed relationship with the client to win additional packages of work and expanded the business of J&P Overseas.
Project Engineer
Jul 2007
— Jul 2009
My responsibility was to execute and complete the construction activities across various sectors including bus stations/terminals, tunneling, bridgework, earthwork & roadwork including retaining walls, soil nailing and shotcreting, and utilities (water, waste water, storm water drainage, and energy)
Planned and managed work time schedules including monitoring the project program and recording progress against the program, resources allocation (people, equipment/machinery, and materials) and productivity, planned and managed day-to-day construction activities in line with the project’s plans, objectives and law/statutory requirements and supervised the work of laborers, mechanics, etc. and guided them when needed, administered subcontracts, interfaced with stakeholders, reviewed adequacy of all documentation for construction purposes including verification of standards, codes and specifications, and developed construction execution plans and methodologies.
Ensured works are performed within the defined cost-effectiveness guidelines and carried out cost forecasting, identified cost and efficiency savings where achievable, managed change and variation orders, produced timely reports and related correspondence, demonstrated commitment to QA/QC and HSE through personal example, leadership and participation in monitoring of established working practices.
Played a vital team member role, coordinating logistics and managing the 2 shift engineers in the tunnel work, where we only had access of 16hr per day of working time before we had to hand back the tunnel clean and safe ready for the traffic flow.
Site Engineer/Project Engineer/Senior Project Engineer
Feb 1999
— May 2007
During my time with the company, I led by example all my site team members and subcontractors to adhere to health and safety standards, QA/QC boundaries, statutory and client’s requirements including approvals/permits obtaining processes, and contractual terms and conditions.