Electrical Engineer 23 years overall Experience with 12 years Owner/Consulting Engineer and 11 years Main Contractor


Last Updated: 17th September 2017 (over 5 years ago)

Address
Philippines

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
45 to 54

Qualification Level
Degree

Languages
English, Filipino

Summary

WORK EXPERIENCE SUMMARY:
• 23 years overall Experience with 12 years Owner/Consulting Engineer and 11 years Main Contractor
• Projects: Common Sulfur, Power Plants (Combine Cycle (Gas & Steam), Coker, Coal/Pet & Thermal), Refineries, Transmission & Distribution, Infrastructure(Airport, Embassy, Rail Transit, Factory & Farm), Oil & Gas (Onshore /Offshore), Substation, Fit Out & High-rise Building
• International & Local Locations (Philippines, Malaysia, Aruba, Saudi Arabia, Ghana, Qatar and Jordan)

BRIEF LISTING OF AREAS OF EXPERTISE:
• Electrical Engineering
• FEED and Detailed Design
• Consultancy
• Owner Engineer
• Construction Supervision/Implementation
• Pre-commissioning & Commissioning
• PMC & EPCC Services

SKILLS:
Experience in performing Electrical Engineering functions to include Consulting, Supervision and Inspection for EPCC Works. Knowledgeable in Designing, Detail Design, Interior Design, Material & Cost Take off, Tendering, Documentation and implementation. Has experience in electrical schedule, coordinating and monitoring activities. Knowledge of Engineering, Procurement, Construction and Commissioning management acquired through specialized instruction and practical experience. Proficiency in using PC for basic software applications such as Microsoft Office (Excel, Word, Project, Outlook and Power Point). Knowledgeable in using multiple specific applications such as PDF, Autocad and Dialux.

Education

National University
Bachelor of Science in Electrical Engineering

   Jun 1984
— Mar 1990

Registered Electrical Engineer

Experience

Black & Veatch International
Senior Electrical Consultant Engineer

   Jan 2016
— Current

Location: Amman, Jordan
Major Project Undertaken
- 1x30MW net Coal/Pet Coke, Power Plant
Manaseer Modern Cement and Mining Co. Ltd Jordan
Duties & Responsibilities
• Assigned as Owner Engineer/Consultant for Electrical Works of Power Plant for Engineering-Procurement-Construction and Commissioning work (EPCC). The Plant consist of Turbine Generator, Water Treatment Plant, Boiler, Fuel Handling System, Air Cooled Condenser, Fin Fan Cooler, Diesel Generator, Crusher/Stocker Reclaimer/Conveyor Yard, Bed/Fly ASH Silo, Power House Bldg. Power Transformer, Auxiliary & Converter Transformer, Fin Fan Cooler, Air Compressor Bldg. Admin and Workshop Bldg.
• Implement Electrical Works such as Calculation, Design Criteria, Specification (Technical/Equipment), Material Take off, Inspection Test Plan, Technical Bid Evaluation, cable Schedule, all Electrical Shop drawings, installation details/Specification, Detail Design, Panel Arrangement and all Electrical Study Report.
• Supervision & Inspection of EPCC Contractor for various electrical installation such as MV Power Transformer, Auxiliary & Converter transformer, Dry Type Transformer, Busduct, Neutral Ground Resistor, MV & LV Switchgears, MCC, RTCC, DC Battery Charger, Diesel Generator, UPS, Lighting Panel, Fire Alarm & Detection System, Lighting System, Cable Pulling, MV Cable Splicing and Termination, Electric VFD Motors and LCS, Grounding System, Lightning Protection System, Building Lightings and Street Lightings.
• Pre –commissioning and Commissioning of Power distribution Facilities, Relay and Control panels, MCC, 11KV Switchgears SF6 (Vacuum and Air Circuit Breakers), Auxiliary & Converter transformer, Dry Type Transformers, VFD Motors, Solo Run Test, Hi-Pot test of MV Power Cables.
• My scope to develop the Engineering Management Responsible for PMC Project including Project Execution Plan, Develop Engineering Schedule, Coordinate of EPCC Contractor activities
• Participate in EPCC Contractor’s Project specific reviews, Technical Integrity Review, Commissioning Plan Review, Safety and Risk Review and Inspection and Testing.
• Monitor and review scope changes of EPCC Contractor to PMC to minimize potential claims.
• Monitor and provide comment for clearance of hazop actions and design review changes
• Review EPCC Contractor key documents that are issued by PMC to the EPCC Contractor and provide comment as necessary.
• Provide update for the progress of the material/equipment delivery to the sites and construction/erection works. Prepare monthly and quarterly reports for Electrical works for Employer.
• Implement project procedures to ensure an effective and efficient system for safety, quality, cost and schedule.
• Responsible for the overall control and supervision of construction and erection activities for Electrical works.
• Review of engineering submittals i.e. Project Drawings, Vendor Drawings, Material and Design/Detail Design.
• Review, coordinate and approve the erection, quality assurance and commissioning procedures submitted by the Contractor. The Consultant will ensure that these procedures will comply with the requirements and in line with the project.
• Supervision of Commissioning works – Start-up Period (Pre-Commissioning), Commissioning and Taking over.

Alonso, Hernandez & Asociados S.L. (ah)
Senior Electrical Consultant Engineer

   Nov 2009
— Nov 2015

Location Doha, Qatar
Major Project Undertaken
- TJ Pearl Mansion
- Sheraton Hotel Renovation
- Fit out works for Eatopia Restaurant, Leila Shop & Blink - Gate Mall
- New Doha International Airport (NDIA) Airline Operation Facilities - CP-65
- New Villa Umm Salal, Villa A & B + Majlis + Mosque + Service Bdg. + Substation
- 26th Storey Viva Bharya 18 Building Project in Pearl Qatar
- Doha & Qatar Cable Factory and Warehouse & Farm Project
- Umm Birka Super S/S – 400/220/132/11 KV Super Substation Supply
Duties & Responsibilities
• Assigned as Consultant for Consulting & PMC firm of Power Distribution/Transmission/Utilities, High Rise Building, Interior Design, Fit Out and Infrastructure Design/construction works for Engineering-Procurement-Construction and Commissioning works (EPCC) of Electrical System
• Supervision & Inspection of various electrical installation such as HV & MV Power Transformer, Dry Type Transformer, Busduct, Neutral Ground Resistor, MV & LV Switchgears, MCC, RTCC, Load Shedding, Line Protection System, Annunciator, Interposing Relay, DC Battery Charger, UPS, Lighting Panel, Lighting System, Cable Pulling, MV Cable Splicing and Termination, Electric Motors and LCS, Grounding System, Lightning Protection System, Building Lightings, Street Lightings and Extra Low Voltage System (Public Address, Telecommunication, Video Surveillance, WLAN/LAN, Fire Alarm & Detection System, Access Control System, Home Automation, BMS & CCTV).
• Pre –commissioning and Commissioning of Power distribution Facilities, Relay and Control panels, Switchgear (GIS & Air Insulated), MCC, 11KV Switchgears SF6 (Vacuum and Air Circuit Breakers), Oil filled transformer, Dry Type Transformers, LV and HV Motors, Solo Run Test, Hi-Pot test of HV & MV Power Cables.
• My scope to develop the Engineering Management Responsible for PMC Project including Project Execution Plan, Develop Engineering Schedule, Coordinate of EPCC Contractor activities
• Participate in EPCC Contractors Project specific reviews, Technical Integrity Review, Commissioning Plan Review, Safety and Risk Review and Inspection and Testing.
• Monitor and review scope changes of EPCC Contractor to PMC for scope change to minimize potential claims.
• Monitor and provide comment for clearance of hazop actions and design review changes
• Review EPCC Contractor key documents that are issued by PMC to the EPCC Contractor and provide comment as necessary.
• Provide update for the progress of the material/equipment delivery to the sites and construction/erection works. Prepare monthly and quarterly reports for Electrical works for Employer.
• Implement project procedures to ensure an effective and efficient system for safety, quality, cost and schedule.
• Responsible for the overall control and supervision of construction and erection activities for Electrical works.
• Review of engineering submittals i.e. Project Drawings, Vendor Drawings, Material and Design/Detail Design.
• Review, coordinate and approve the erection, quality assurance and commissioning procedures submitted by the Contractor. The Consultant will ensure that these procedures will comply with the requirements and in line with the project.
• Supervision of Commissioning works – Start-up Period (Pre-Commissioning), Commissioning and Taking over

Washington Group & Al Jaber Energy Consortium
Sr Electrical Engineer

   Jun 2007
— Oct 2009

Location Ras Laffan, Qatar
Major Project Undertaken
Qatar Gas - Common Sulfur Project (Qatar Liquefied Gas Company Limited) – Ras Laffan

Duties & Responsibilities
• Our work scope is for the design and construction of 12,000 ton per day of liquefied sulfur via the pipelines including the full electrical & instrumentation scope. It includes the installation of a new Distributed Control System (DCS) and Emergency Shutdown System (ESD). The initial work scope has expanded to provide mechanical pre-commissioning and maintenance, civil excavations for cable routing, concrete duct bank installation for fiber optic cabling, concrete pull box installation, asphalting, structural, QA/QC, safety management and commissioning services. Works on this site have also grown to include operations support directly to Qatar Gas. Sulfur is produced as a result of removal of H2S as a byproduct during the production of LNG and is a major commodity chemical used in rubber, cosmetics, pharmaceuticals, and sulfuric acid manufacturing.
• Provider of engineering submittals i.e. Project Drawings, Vendor Drawings, Material and Design/Detail Design.
• Supervision of various Electrical Installation such as MV Power Transformer, Dry Type Transformer, Busduct, Neutral Ground Resistor, MV & LV Switchgears, MCC, RTCC, Load Shedding, Line Protection System, Annunciator, Interposing Relay, DC Battery Charger, UPS, Lighting Panel, Fire Alarm & Detection System, Lighting System, Cable Pulling, MV Cable Splicing and Termination, Electric Motors and LCS, Grounding System, Lightning Protection System, Building Lightings and Street Lightings.
• Pre –commissioning and Commissioning of Power distribution Facilities, Relay and Control panels, MCC, 11KV Switchgears SF6 (Vacuum and Air Circuit Breakers), Oil filled transformer, Dry Type Transformers, LV and HV Motors, Solo Run Test, Hi-Pot test of MV Power Cables.
• Responsible for the overall implementation and supervision of construction and erection activities.
• Perform required electrical system studies. Provide input for conceptual design of electrical systems. Initiate preparation basic design and engineering packages as required for current projects, organized the engineering activities for detailed design phase.
• Attend the project meetings including - Monthly design and coordination meetings.
• Coordinate to Client Qatar Gas, Kharamaa, Qtel & Civil Defense prior for approval of shop drawings, Materials, specification, Testing & Commissioning.

B.L. Harbert International, L.L.C
Electrical Field Superintendent

   May 2005
— May 2007

Location Accra, Ghana, West Africa
Major Project Undertaken
- United State of America Embassy (New Embassy Compound Project)
Duties & Responsibilities
• The company is Main Contractor and assign as Electrical Field Superintendent for the Engineering, Procurement, Construction and Commissioning Work (EPCC) of Electrical System (Lighting & Power System, 11KVSubstation, Power Transformer, 11KV MV Switchgear, Generator, Earthing, MV/LV Panel & Distribution Board) Lightning Protection and Extra Low Voltage System (Public Address, Telecommunication, Video Surveillance, WLAN/LAN, Fire Alarm System, Access Control System, Home Automation, BMS & CCTV) of the Project for New Embassy Project.
• Responsible for the overall implement and supervision of construction and erection activities.
• Coordinate to Client OBO prior for approval of shop drawings, Materials, specification, Testing & Commissioning.

Hyundai Doz (M) Sdn Bhd
Planning & Control Engineer

   Apr 2004
— Apr 2005

Location Taman Danau Desa, Kuala Lumpur, Malaysia
Major Project Undertaken
- 3x700MW Coal Fired Power Plant, Tanjung Bin, Johor
- Tanjung Bin & Bukit Batu 500/275KV Substation
Duties & Responsibilities
• The company is Main Contractor and assign as Planning & Control Engineer, Quality Control and Quantity Surveyor for the whole project.
• Coordinate for Client (Toshiba, Sub-con Civil / Electrical) & Supplier about Engineering, Procurement, Construction & Commissioning works (EPCC) of Electrical System (Lighting & Power System, Substation, Power Transmission/Distribution, 500/275KV Power Transformer, Gas Insulated Switchgear, MV/LV Switchgear, Underground Cables, Generator, Earthing, MV Panel & Distribution Board), Lightning Protection and ELV System.

Hassan A. K. Algahtani (HAK) Group
Electrical Engineer (Owner Engineer)

   Apr 2000
— Nov 2003

Location Al Kafji, Kingdom of Saudi Arabia
Major Project Undertaken
- Arabian Oil Company (AOC)
Kuwait Gulf Oil Company (KGOC) and Aramco Gulf Operations Company (AGOC) of Saudi Arabia located in Al Khafji
Duties & Responsibilities
• Assign as Owner Engineer/Consultant for Electrical Works for onshore/offshore facilities.
• Supervision & Inspection of various electrical installation such as HV & MV Power Transformer, Dry Type Transformer, Busduct, Neutral Ground Resistor, MV & LV Switchgears, MCC, RTCC, Load Shedding, Line Protection System, Annunciator, Interposing Relay, DC Battery Charger, UPS, Lighting Panel, Lighting System, Cable Pulling, MV Cable Splicing and Termination, Electric Motors and LCS, Grounding System, Lightning Protection System, Building Lightings, Street Lightings and Extra Low Voltage System (Public Address, Telecommunication, Video Surveillance, WLAN/LAN, Fire Alarm & Detection System, Access Control System, Home Automation, BMS & CCTV).
• Pre –commissioning and Commissioning of Power distribution Facilities, Relay and Control panels, Switchgear (GIS & Air Insulated), MCC, 11KV Switchgears SF6 (Vacuum and Air Circuit Breakers), Oil filled transformer, Dry Type Transformers, LV and HV Motors, Solo Run Test, Hi-Pot test of HV & MV Power Cables.
• Coordinate to Contractor & Supplier prior for approval of shop drawings, Materials, specification, Testing & Commissioning.

ABB Lummus & J.A. Jones Construction
Electrical & Instrumentation Assistant Superintendent

   Mar 1999
— Feb 2000

Location San Nicholas, Aruba, Dutch Caribbean
Major Project Undertaken
- Coastal Aruba Coker Refining Company- Aruba Capacity Expansion Project
Duties & Responsibilities
• The company is Main Contractor and assign as Electrical & Instrumentation Assistant Superintendent for Inspection and installation of electrical & instrumentation works.
• Supervision of various electrical installation such as HV & MV Power Transformer, Dry Type Transformer, Busduct, Neutral Ground Resistor, MV & LV Switchgears, MCC, RTCC, Load Shedding, Line Protection System, Annunciator, Interposing Relay, DC Battery Charger, UPS, Lighting Panel, Fire Alarm & Detection System, Lighting System, Cable Pulling, MV Cable Splicing and Termination, Electric Motors and LCS, Grounding System, Lightning Protection System, Building Lightings and Street Lightings.
• Responsible for any modification and rectification on site electrical and Instrumentation related job and making general inspection of the equipment wiring, connection labels and so on.
• Coordinate to Client & Consultant prior for approval of shop drawings, Materials, specification, Testing & Commissioning.

Azdaman Engineering Sdn Bhd
Electrical Engineer

   Sep 1996
— Jul 1998

Location Petaling Jaya, Malaysia
Major Company & Project Undertaken
- HENZ Construction –Harbert-Esprit-Namfat-Zaq (Joint Venture)
Major Project Undertaken
- Kuala Lumpur City Center (PETRONAS Tower) Car Park & Retail Podium
- Kuala Lumpur International Airport Co-Generation Plant
- SUMATEC Corporation Sdn. Bhd. Contract Department (Head office)
Duties & Responsibilities
• The company is Main Contractor and assign as Construction Engineer, Quality Control & Inspector for distribution, Planning and Manpower Management Coordinator, Planning/Scheduling Engineer, coordinator, Inspection & Supervision of various electrical installation such as HV & MV Power Transformer, Dry Type Transformer, Busduct, Neutral Ground Resistor, MV & LV Switchgears, MCC, RTCC, Load Shedding, Line Protection System, Annunciator, Interposing Relay, DC Battery Charger, UPS, Lighting Panel, Fire Alarm & Detection System, Lighting System, Cable Pulling, MV Cable Splicing and Termination, Electric Motors and LCS, Grounding System, Lightning Protection System, Building Lightings and Street Lightings.
• Pre –commissioning and Commissioning of Power distribution Facilities, Relay and Control panels, Switchgear (GIS & Air Insulated), MCC, 11KV Switchgears SF6 (Vacuum and Air Circuit Breakers), Oil filled transformer, Dry Type Transformers, LV and HV Motors, Solo Run Test, Hi-Pot test of HV & MV Power Cables.
• Coordinate to Client & Consultant prior for approval of shop drawings, Materials, specification, Testing & Commissioning.

Atlantic Gulf & Pacific
Electrical Engineer

   Jan 1992
— Oct 1995

Location Makati City, Philippines
Major Project Undertaken
- Manila Metro Rail Transit System Line 3 (MRT 3)
- 1x300MW Batangas Coal Fired Thermal Power Plant II Project
- 2x300MW Bataan Combined Cycle Power Plant (BCCPP)
- 24th Storey Makati Commercial Center Building Project (MCC)
Duties & Responsibilities
• The company is Main Contractor and assign as Construction Engineer, Quality Control & Inspector for distribution, Planning and Manpower Management Coordinator, Planning/Scheduling Engineer, coordinator, Inspection & Supervision of various electrical installation such as HV & MV Power Transformer, Dry Type Transformer, Busduct, Neutral Ground Resistor, MV & LV Switchgears, MCC, RTCC, Load Shedding, Line Protection System, Annunciator, Interposing Relay, DC Battery Charger, UPS, Lighting Panel, Fire Alarm & Detection System, Lighting System, Cable Pulling, MV Cable Splicing and Termination, Electric Motors and LCS, Grounding System, Lightning Protection System, Building Lightings and Street Lightings.
• Pre –commissioning and Commissioning of Power distribution Facilities, Relay and Control panels, Switchgear (GIS & Air Insulated), MCC, 11KV Switchgears SF6 (Vacuum and Air Circuit Breakers), Oil filled transformer, Dry Type Transformers, LV and HV Motors, Solo Run Test, Hi-Pot test of HV & MV Power Cables.
• Coordinate to Material Management, AG&P Civil, Mechanical Division, other Sub-contractor and supervise for implementation works.
• Coordinate to Client & Consultant prior for approval of shop drawings, Materials, specification, Testing & Commissioning.