Senior Project planning & controls engineer


Last Updated: 20th July 2018 (over 4 years ago)

Address
Thailand

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
25 to 34

Qualification Level
Degree

Languages
English

Summary

1. Exposure in oil and gas projects in the Saudi Arabia,Singapore,Thailand and India.
2. Has involved in handling of EPCC projects of large scale
3. Worked with top notch clients like Shell,Total and Saudi Aramco.
4. Extremely flexible to work conditions and quickly adaptable to the environment.
5. Wide knowledge in the field as project control personality to overlook the project.
6. Diversified and integrated knowledge in Planning,scheduling (Primavera),project controls, Contracts and Cost estimation
7. Fluent in English with good presentation skills and communication

Experience

TRC construction public company limited(Thailand)
Senior Project Control and planning Engineer

   Feb 2016
— Current

1. Coordinate with key partners for the effective tracking, and implementation monitoring and review of new development projects and strategic initiatives.
2. Form the Work Break down structure of the complete project
3. Negotiation with the sub-contractors and review the contract clauses
4. Prepare monthly claim for the OWNER’s review
5. Organize and facilitate cross-functional project meetings. Track and report on the project status including schedule and scope adherence, risks and issues.
6. Co-ordinate with the procurement for the timely delivery according to the field requirements

Rotary engineering limited (EPC) - Singapore
Project Control & Planning Engineer

   Jan 2014
— Jan 2016

1. Plan and schedule the baseline of project for various disciplines.
2. Preparation of S-curves for construction.
3. Man power loading plan and resource planning.
4. To assist all the Business units for sequencing and planning.
5. Prepare and attend weekly meeting with the client.
6. To make sure Engineering drawings arrive as per plan.
7. Co-ordinate with procurement for deliverable required as per site required date.
8. To verify with authority submissions as per plan and co-ordinate.
9. Preparation of monthly progress report and claim.

Nasser.S.Al-Hajri corporation
Project Control & Planning Engineer

   Jul 2011
— Oct 2013

1. Project Progress Measurement using S curves.
2. Monitoring of actual resources availability & analysis using Histogram.
3. Forecasting & Preparation of three week look ahead.
4. Preparation of Executive Progress Summary Report/Presentations to the Top Management on Project Status for periodical review.
5. Estimation of Manpower Requirement for the Project based on Standard Productivity Norms.
6. Development of Base Line Schedule using PRIMAVERA (P6).

Rane Engines Valves Limited
Graduate Engineering Trainee

   Jul 2010
— Jun 2011

1. Implementation of planned Layout changes
2. Handling Engineering change management and documenting the engineering changes in all mother documents as requesting by both internal and external customers by validating the process before changes.
3. Reviewing the FMEA (Failure Mode and Effective Analysis) for all processes and implementing action plan for reducing the rejection PPM level.
4. Reviewing the SOP (Standard Operating Procedure) for all processes.
5. Tooling management.
6. Tool life improvements in CNC machines by optimising the process parameters.
7. Implementation of Lean production system in all customer lines.
8. Layout modification.
9. Machine shifting and positioning as per modified layout.

Search Jobs by Industry

Ad
Ad
Ad