Summary

PMI Project Management Professional (PMP) certified Mechanical Engineer with 8 years demonstrable EPC contracting experience in oil & gas, refinery, buildings and infrastructure projects. I have worked on major, multi billion $ construction projects and gained excellent experience of Procurement/Contracts, Pre - Qualification of Vendors & Material, Execution/Erection, Testing & Commissioning, QA/QC and Supervision of complex mechanical / MEP projects as well as excellent project management and client facing skills. I have exceptional knowledge and experience of all building services (HVAC, Fire Protection, Plumbing, Solar Water Heating System, LPG system) and can handle end to end MEP projects.

Previously worked in UAE at IPIC/ADCO project "Abu Dhabi Crude Oil Pipeline Project, Habshan to Fujairah" as Mechanical Site Engineer from Oct 2012 to Sep 2014 and successfully executed all HVAC, Plumbing and Firefighting works of project.

In Nov 2014, joined a Swedish, major EPC contractor, worked on its Saudi Aramco Oil refinery construction project "YASREF" and successfully executed all HVAC, Plumbing, Firefighting, Fire Protection, Sewer and Storm water networks.

Currently, working at Ministry of Interior, Security Forces Medical Center project Riyadh. Saudi Arabia’s largest medical/healthcare and residential project, and also the largest medical project in the GCC, estimated $6.7bn that is being developed in Riyadh on behalf of the Kingdom’s Interior Ministry.

In my current project, I am supervising and managing HVAC (Chillers, DX system, AHUs, VRV-Variable Refrigerant Volume systems, Duct work), Plumbing (Water Supply, Drainage, Fixtures, Indoor, Outdoor), Fire Protection, Firefighting, Rooftop Solar Water Heating system, LPG system and all external networks.

Education

Project Management Institute USA
PMI Project Management Professional

   May 2016
— Aug 2016

I passed the exam for PMI Project Management Professional certification on August 31, 2016 in the very first attempt and attained the global credential.

University of Engineering & Technology Peshawar, Pakistan
B.Sc. Mechanical Engineering

   Aug 2007
— Aug 2011

University Bachelor Degree in Mechanical Engineering

Experience

ABV Rock Group Co. Ltd. Saudi Arabia
Mechanical Project Engineer

   Oct 2015
— Current

►Project: Special Forces Medical Center Project Riyadh,(worth 12 Billion SAR)
►Client: Ministry of Interior, Saudi Arabia
►Consultant: Manens-Tifs INGEGNERIA

Responsibilities & Key Performance Measures:

►Reviewing & commenting on method statements,material submittals and drawings submitted by contractor and subcontractors.
►Generating & developing Inspection test plans (ITPs) for all mechanical site activities.
►Monitoring the correct execution of all mechanical site activities (DX & Packaged HVAC systems, VRV (Variable Refrigerant Volume) Systems, Chillers, Boilers, Firefighting, Water Supply, Drainage, Roof top Solar Water Heating System, LPG system and all underground Chilled Water/Firefighting/Sewer/Storm Water piping networks) according to approved construction drawings and project specifications.
►Strictly ensuring each construction activity has an approved Method Statement, ITP, Quality Procedures and Checklists before start over.
►Supervising, monitoring & witnessing hydro-static tests and gravity tests/leak tests for all piping both in infrastructure & buildings and Leak tests/Smoke tests/Lighting tests for HVAC Duct work.
►Closely monitoring site activities to ensure quality of work is in compliance with contract requirements, good construction practice, only approved materials are used and in compliance with approved shop drawings.
►Ensuring Corrective Action Request/NCR is issued to Contractor and Subcontractors in case of violations and continuously following up till close out.
►Managing and conducting site inspections with client/consultant as per approved documents.
►Conducting material inspections as per project specifications and requirements,ensuring every incoming material is inspected & approved.
►Verifying subcon's invoices.
►Attending Material Tests at 3rd party laboratories with consultant to witness tests,checking conditions of equipment, skills of technician and calibration certificates of equipment to qualify the 3rd party testing agency.

ABV Rock Group Co. Ltd. Saudi Arabia
Mechanical Site Engineer

   Nov 2014
— Oct 2015

►Project: The Construction of "YASREF"​-Yanbu Aramco Sinopec Refining Company Ltd."​
►Our Work Section: "MC-5 Building infrastructure & Support Facilities"​, (Worth 600 Million $)
►Client/Consultant: SAUDI ARAMCO

Achievements & Key Performance Measures:

►Generated Method Statements for all HVAC, MEP activities & Infrastructure utilities.
►Supervised the correct execution of all mechanical site activities (HVAC, Chillers, AHUs, Pumps, Firefighting, Water Supply, & Drainage) as per SAUDI ARAMCO Engineering Codes, Inspection & Test Plans and approved IFC drawings.
►Supervised all underground piping networks (Firefighting, Chilled Water, Storm Water and Sewerage) installation and supervised hydro-static tests and Leak/gravity tests for all piping both in infrastructure & buildings and Smoke/Lighting/Leak tests for HVAC Duct work.
► Led snagging procedure to check HVAC/MEP systems after completion of construction activities have ended; ensured that a snag list is prepared based on outstanding works and submitted to Engineer for approval.
►Coordinated with PMT, PID, QA/QC and Civil & Electrical Engineers in inspections, management, technical issues in drawings and site.
►Led & managed different teams of total 150 workers and 8 supervisors.
►Kept a record of all the tests & inspections carried out at site.
►Generated purchase requests & purchase orders for all MEP material, coordinated with procurement cell and thoroughly followed up with suppliers/vendors for timely supply.

Al Burj Electro Mechanical Works United Arab Emirates
Mechanical Site Engineer

   Aug 2011
— Sep 2014

►Project: Abu Dhabi Crude Oil Pipeline Project, Habshan to Fujairah, UAE.
►Client: International Petroleum Investment Company.
►PMC: ILF Consulting Engineers.

Achievements & Key Performance Measures:

►Generated Method Statements and Inspection Test Plans for all MEP work.
►Supervised all MEP Mechanical work. Executed all MEP work in accordance with IPIC & ADCO Engineering codes and Project approved procedures, specifications and drawings.
► Studied the contractor's schedule thoroughly (e.g. shop drawing submittal log, procurement schedule, material submittal log etc.) prior to its approval by PMC.
► Checked all sample HVAC MEP components and materials submitted by contractors; ensured compliance against project requirements and technical specifications.
► Inspected all procured HVAC MEP materials to ensure compliance against project requirements and specifications.
►Co-ordinated in HVAC/MEP Testing, Adjusting & Air/Water Balancing and resolved immediately all defects as detected by the third party.
►Participated in Factory Acceptance Test (FAT) and Site Acceptance Test (SAT).
►Upgraded drawings to the As built condition.
►Led snagging procedure to check HVAC/MEP systems after completion of construction activities have ended; ensured that a snag list is prepared based on outstanding works and submitted to Engineer for approval.