I am an experienced and certified project management professional (PMP) with nearly 11 years of experience in EPC / EMC / PMC contracts in greenfield & brownfield projects, managing all the project phases from initiation to closeout as well as hands-on experience as contracts and lead cost control engineer. In addition, I hold a B-tech degree in mechanical engineering along with an MBA in Oil & Gas management.
• PMI Certified Project Management Professional (PMP® Number: 2168908).
• Certified ISO 21500 Lead Project Manager from PECB. (Certificate Number: PMLPRM1021334-2017-07)
• Certified Six Sigma Yellow Belt Professional – CSSYBP - Certificate Number: 618274
• Certified Scrum Fundamentalist – SFC™ - Certificate Number: 618606
• Certified Negotiation Associate – NCN-A™ - Certificate Number: 583069

Education

UNIVERSITY OF PETROLEUM AND ENERGY STUDIES
M.B.A in Oil and Gas Management

   Apr 2017
— Apr 2019

COCHIN UNIVERSITY OF SCIENCE AND TECHNOLOGY
B-TECH in Mechanical Engineering

   Apr 2009
— Apr 2009

Experience

Special Technical Services LLC Oman
Lead Planning Engineer

   Mar 2014
— Current

• Prepare level 2 & level 3 schedules in conjunction with the concept study report.
• Develop L4 resource loaded EPC schedules in Primavera P6 conjunction with the project team.
• Developing and preparing monthly project reports, S-curves, Histograms, manning charts
• Ensuring usage of sound construction practices to attain required quality control at minimum cost
• Providing engineering design and related services that supported the company’s design-build construction business/group managing pre-construction planning and services
• Ensuring documentation for compliance with contract requirements, strong engineering practices, codes and standards
• Monitoring enforcement of company policies and procedures; sharing daily personnel status and responsibility
• Performing CPI/SPI calculations using earned value principles
• Formulating and updating project schedule based on the contract, set work program & target milestones for each phase based on the project plan; monitoring critical activities based on the project schedule and developing equipment histogram during the proposal stage
• Delivering standard, timely, consistent and robust project controls as per client Project Control frameworks.
• Developing trend analysis and implement management of change process for projects.
• Implementing Earned Value Management process consistently across projects/sub-projects.
• Interfacing with Site & Management; highlighting project status by preparing charts, diagram, graphs and presentations.
• Maintaining records of the files, attending the meeting for department and preparing agenda for the same
• Conducting resource planning, developing budget control methods to curb project costs.
• Performing risk analysis and recommending risk mitigation measures against backlogs
• Drafting project closeout report and reviewing invoices related to various services provided by subcontractors

Reliance Industries Ltd
Construction Engineer

   Apr 2013
— Mar 2014

• Responsible for mechanical activities associated with engineering, procurement, installation, commissioning & handover of reactor area for the polymerization unit of SBR plant.
• Vendor document review, long lead material specification review, Technical bid evaluation & commercial bid evaluation.
• Conduct design reviews, SIMOPS, HAZOP & Constructability review.
• Update the changes in the drawings as per the review comments prior to issuing AFC documents.
• Prepare the piping isometric detail drawings along with support details.
• Organized model reviews, constructability review, operability review with client & construction team.
• Preparing detail isometric drawings & support selections.
• Preparation of final MTO based on the final revised PEFS & layouts issued to site.
• Steel structure & piping installation. This included installation, inspection, testing, Non-destructive examinations, mechanical box-up, preparing as-built drawings, system flushing, pre-commissioning & commissioning & system handover.
• Equipment erection which included static & rotary alignment. Performed laser alignment methods.
• Performed pressure leak tests for piping process systems which included hydraulic & pneumatic testing procedures as per ASME B31.3.
• Assured proper quality procedures are being implemented as per the ASME code for process piping B31.3.
• Monitored & updated the material purchase tracking register in order to follow-up the procurement process.
• Monitored & updated the DDR document deliverable register to ensure the drawings are being delivered at the time & are following the right revision.
• Estimated the engineering front available at the site.
• Prepared an estimation register to calculate the resources required against the scope available as per the industrial norms.

Toyo Engineering India Ltd
Project / Planning / Mechanical Engineer

   May 2009
— Mar 2013

• Responsible for mechanical activities associated with engineering, procurement, installation, commissioning & handover of reactor area for the polymerization unit of SBR plant.
• Vendor document review, long lead material specification review, Technical bid evaluation & commercial bid evaluation.
• Conduct design reviews, SIMOPS, HAZOP & Constructability review.
• Update the changes in the drawings as per the review comments prior to issuing AFC documents.
• Prepare the piping isometric detail drawings along with support details.
• Organized model reviews, constructability review, operability review with client & construction team.
• Preparing detail isometric drawings & support selections.
• Preparation of final MTO based on the final revised PEFS & layouts issued to site.
• Steel structure & piping installation. This included installation, inspection, testing, Non-destructive examinations, mechanical box-up, preparing as-built drawings, system flushing, pre-commissioning & commissioning & system handover.
• Equipment erection which included static & rotary alignment. Performed laser alignment methods.
• Performed pressure leak tests for piping process systems which included hydraulic & pneumatic testing procedures as per ASME B31.3.
• Assured proper quality procedures are being implemented as per the ASME code for process piping B31.3.
• Monitored & updated the material purchase tracking register in order to follow-up the procurement process.
• Monitored & updated the DDR document deliverable register to ensure the drawings are being delivered at the time & are following the right revision.
• Estimated the engineering front available at the site.
• Prepared an estimation register to calculate the resources required against the scope available as per the industrial norms.