Commissioning and Completions Engineer


Last Updated: 29th May 2018 (over 4 years ago)

Address
India

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
25 to 34

Qualification Level
Degree

Languages
English, Hindi, Spanish

Summary

A Commissioning and Completions Engineer with more than 6 years of experience working on cross
country pipelines (Oil and Gas), in the area of Onshore & Near shore Pipelines. Efficiently worked for
different discipline in this Project gaining good experience in the areas of Commissioning, Spare parts coordination and Project documentation.

Education

visvesvaraya technological university
Bachelors in Mechanical Engineering

   Aug 2006
— Jun 2009

Bangalore Board
Diploma in Mechanical Engineering

   Jul 2003
— May 2006

Experience

Spiecapag Entrepose
Commissioning and Completions Engineer

   Jan 2017
— Current

A Commissioning and Completions Engineer with more than 6 years of experience working on cross
country pipelines (Oil and Gas), in the area of Onshore & Near shore Pipelines. Efficiently worked for
different discipline in this Project gaining good experience in the areas of Commissioning, Spare parts coordinator and Project documentation.
Familiar with Commissioning softwares like WINPCS,ICAPS,CMS
Carry out technical data, drawing, and layout reviews
 Updating all the registers in CMS to generate the check sheets & progress reports
for both pre-commissioning & Commissioning activities
 Review the Engineering Registers against P&ID, Electrical & Instrument drawings
 Review all the engineering documents and commenting as required to meet the
project specifications and preparing the electrical, instrument cable schedule and
instrument items as per drawing
 Assist other departments such as construction, hydro test and AGI in completing
check sheets and coordinate with QAQC with ongoing inspection at site
 Manage the Commissioning System (CMS) for preparation, execution and
progress analysis of commissioning and start-up activities
Participate in preparing check sheets and reports on testing activity and sign off check sheets and reports
 Participate in joint walk downs with Client and Construction for punch lists and
safety reviews
 Prepare Completions Packages Commissioning Work Packages, and Turnover
Packages according to instructions and project specifications

Spiecapag Entrepose
Commissioning and Completions Engineer

   Feb 2015
— Nov 2016

Carry out technical data, drawing, and layout reviews
 Review the Engineering Registers against P&ID, Electrical & Instrument
drawings
 Review vendor commissioning, operating and maintenance manuals
 Mark-ups on P&ID, SLD, Plot Plan.
 Reviews the test pack Documentation relevant to the systems and ensures the
systems are constructed in accordance with the prescribed information –
drawings, specifications and vendor information.
 Updating all the registers in ICAPS to generate the check sheets & progress
reports for both pre-commissioning & Commissioning activities
 Interfaces with the Discipline Planning Teams to understand the construction
schedule
 Coordinates and monitors the hydro tests and reports on the completion of
hydro tests
 Review all the engineering documents and commenting as required to meet
the project specifications and preparing the electrical, instrument cable
schedule and instrument items as per drawing.
 Red line the engineering documents as per changes done in site
Carry out equipment inspections against specifications
 Participate in preparing check sheets and reports on testing activity and sign
off check sheets and reports
 Participate in joint walk downs with Client and Construction for punch lists and
safety reviews
 Participation & Presentation in weekly progress meeting highlighting ongoing
activities, planned activities & areas of concern.
 Preparation of Daily, Weekly, Monthly Progress Reports
 During Tests, ensure all personal including vendor representatives operate
equipment and facilities within allowed/design function envelope in accordance
with specification
 Prepare Completions Packages for Mechanical Completion, Commissioning
Work Packages, and Turnover Packages according to instructions and project
specifications

Spiecapag
Commissioning Planning /Spare part Coordinator

   Mar 2013
— Dec 2014

Monthly preparation of measurement sheets for Sub-Contractor Bills
 Planning and preparing Material Request as per the Site requirement
 Updating the Commissioning Start up and 2 years Spares and following up
 Preparation of Daily, Weekly, Monthly Progress Reports
 Resource allocation and follow up for Material procurement for timely
execution
 Preparation of Daily, Weekly, Monthly Follow up material reports for easy and
proper tracking of materials
 Maintaining and Controlling all the Spare parts which needs to be finally
handover to Clients
 Maintaining the Proper inventory so as to maintain the stock of Materials.
Knowledge of current document control standards as per company’s
specification and document numbering system.
 Prepare the Hazardous Area Verification Dossiers for all MLV, Metering
stations, Cranes
 Prepare Completions Packages for Mechanical Completion, Commissioning
Work Packages, and Turnover Packages according to instructions and project
specifications
 Checking/validation/verification of all documentation, including correct
numbering, revisions, status, format, title and legibility ,Processing and
recording incoming and outgoing vendor data and engineering design
drawings – Alignments Drawing.
 Preparation of Documentation for Final Operation (DFO) such as Turnover &
Completion Package (TCP), Mechanical Completion Package (MCP),as per the
client requirements
Participated in SPID (Spare Parts Inventory Development) Training conducted
by Riversand. (Riversand SPID Datacenter is the software used by prestigious
companies like ExxonMobil, Chiyoda etc... for inventory development)

Larsen & Toubro
Execution Planning Engineer

   Jan 2010
— Feb 2013

Execution Planning and Progress Monitoring of Piping works
 Brief Idea on Chemical Cleaning of Compressor Inlets
 Preparation of Daily, Weekly, Monthly Progress Reports
 E-Alps coordinator( Engineering Activity level Planning System)
 Final Boxing up of all the Systems According to its Torque value
 Monthly preparation of measurement sheets for Sub-Contractor Bills
 Execution and mechanical Clearance of Steam Tracing Lines
Hydro testing on Fire Fighting lines and Steam Tracing Lines
 Hydro Testing of loops as per Specified pressure conditions
 Joint Marking and Spool Marking of Piping Isometrics, then uploading it to EALPS
( Activity Level Planning System) for tracking and monitoring the
progress
 Documentation Control
Procuring the Materials as per the site requirement and followup of the
materials
 Coordinating with clients in Clearing the Punch lists of Steam Tracing Activity
and Accordingly taking action on the Punch list
 Preparation of As-built on the Modifications done at site.
 Planning and preparations of Material List as per site requirements with
respect to the drawings MTO
 Planning and preparation of Total scope of Project with reference to Isometrics
so as to know the status of the project.