Electrical and Instrumentation Superintendent


Last Updated: 12th March 2019 (over 3 years ago)

Address
Pattaya, Thailand

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
55 to 64

Qualification Level
Other Post Graduate

Languages
English

Summary

20+ Years Experience a dedicated Professional Electrical Construction Superintendent, a Senior Superintendent with substantial Technical and Management expertise and experience within the Oil & Gas , Power and Mining Industries, specializing in Substations and High Voltage Infrastructure and Maintenance ,construction , pre-commissioning and commissioning, Inspections and Electrical project management. I am an excellent communicator, motivator and have managed diverse staff from different nationalities and culture, seeing many projects through from the start to the end. My core Competencies are Electrical Construction and Electrical Project Management of major Oil and Gas, Power and Mining projects. Specialties: Engineering / construction, maintenance, manage multiple priorities, Interpersonal, leadership and management Skills, Planning, organizing and problem solving, Multicultural awareness, sensitivity and teamwork

Education

Durban Technical College
E+I Superintendent

   Jan 1980
— Nov 1983

N 4 Electrical Engineering

Experience

Black & Veatch
Electrical Engineer / Tagging Manager

   Sep 2018
— Feb 2019

Location: Chacheongsao 2 Substation Project, Chacheongsao Province Thailand

Verification that plant equipment is following project contract and specification requirements conforms to design operational feasibility, and is set up and tested per the supplier’s requirements, within the engineer’s discipline capacity. Provides functional direction to technicians and craft on staff. As Discipline Engineer, provides functional direction and supervision to other discipline engineers, technicians, and craft support on staff.

Cargill
E+I Superintendent

   Jul 2017
— Jun 2018

Providing Construction Supervision and management for Cargill Crush Plant Project Egypt:
•Follow work progress in the field for piping, insulation, E+I and civil construction works.
•Representing Client in the field and manage the local construction workers and sub-contractors.
•Align on weekly targets with Client project management team and reporting on progress.
•Coordination and providing inputs on work progress and planning to other Clients stakeholders
•Checking the quality of mechanical installed parts related to electrical works
•Checking the quality of E+I installations and assist with engineering issues in the field
•Expediting contractors and manages meetings and acting as Client’s representative.
•Support in the safety management on the construction site according Client HSE Standards

Technip FMC
E+I Superintendent

   Apr 2016
— Apr 2017

Managing the EPC contractor on the JSC Yamal LNG Project in the module fabrication yard in Batam, Indonesia. Review of project documents and detailed engineering drawings. MTO review as per drawing specifications, scope of work off the contractor. Start-up sequence for project, electrical and instrumentation. Review method statements and work packs produce by contractor, setting up of work shop for manufacturing of primary and secondary tray and ladder supports. Witness testing and calibration of instruments, megering of cables and connecting of space heaters of motors for preservation in warehouse be for installation. Daily coordination meeting with upper management and with contractor regarding Electrical and Instrumentation progress and issues on the project. Installation cable tray and ladders, lighting, installing main JB frames and JB’s, cable pulling in tray and ladder, instruments and instrument leak tests, telecommunication systems, fire and gas detectors and lots of heat tracing on module as this module will be going to Russia at sub temperature of -30 (Sabeta) Ensure that contractor prepare as build drawing for review Clearing of punch list after walk downs and signing of final document. Preservation of all electrical and instruments on module be for sail away.

Technip FMC
E+I Superintendent

   Apr 2016
— Apr 2017

Managing the EPC contractor on the JSC Yamal LNG Project in the module fabrication yard in Batam, Indonesia. Review of project documents and detailed engineering drawings. MTO review as per drawing specifications, scope of work off the contractor. Start-up sequence for project, electrical and instrumentation. Review method statements and work packs produce by contractor, setting up of work shop for manufacturing of primary and secondary tray and ladder supports. Witness testing and calibration of instruments, megering of cables and connecting of space heaters of motors for preservation in warehouse be for installation. Daily coordination meeting with upper management and with contractor regarding Electrical and Instrumentation progress and issues on the project. Installation cable tray and ladders, lighting, installing main JB frames and JB’s, cable pulling in tray and ladder, instruments and instrument leak tests, telecommunication systems, fire and gas detectors and lots of heat tracing on module as this module will be going to Russia at sub temperature of -30 (Sabeta) Ensure that contractor prepare as build drawing for review Clearing of punch list after walk downs and signing of final document. Preservation of all electrical and instruments on module be for sail away.

KBR
E+I Superintendent

   Jun 2013
— Jan 2016

Managing the EPC contractor in the new build “ICHTYS” Onshore LNG Facilities Project. Responsible for safety of all sub contractor’s, nominated as IIF Champion (Incident and Injury Free) for my work area. Responsibilities include engineering modifications, checking design and ensuring sub-contractors comply with specifications, attend contractor progress meetings, liaise with engineering to provide quick response to technical queries, provide mentoring in work process’s, inspect finished works, provide senior management construction reports, conducting meetings with sub-contractors and Client on a daily basis and ensuring that the project duration, inclusive of critical path milestones are completed on time. Preservation of equipment using vendor documentation as the basis of the task.

Ad
Ad
Ad