Civil engineer with 30 years’ experience in large infrastructure sites, in Italy and abroad
In the last 20 years I carried out my activity as Health Safety and Environment Manager in huge infrastructure projects reaching, with my staff, 3,500,000 SWH.
My working attitude is constructive, with a remarkable sense of adaptation, thanks to my dealing with multicultural and multi-ethnic environments, both for work and tourism, both in Italy and abroad.
In such a way I can develop and improve my interpersonal, communication and listening skills.
I always put at the base of my group's activity the "Team Work", which is fundamental for communication, management of possible conflicts, problems’ solving. To do this it is fundamental the empathy which is acknowledged to me by those I work with.
Team Working is fundamental because, with my team, I can carry out functional analysis and synthesis of the work done and to be done, giving space and appreciation to the creativity and previous experiences of each of the team members.
Mine and my staff's performance always keep in mind the phases of the "Deming Cycle" (PDCA - Plan, Do, Check, Act), with a view to "Continuous Improvement" of the Management System I am responsible of.
My business is always oriented towards demonstrating flexibility and leading the team with influence and example, rather than authority, in order to provide effective performance as a team leader.
Career Summary
30 years’ experience as manager or consultant in Heavy Infrastructural projects in Italy, Ethiopia, Kazakhstan, Kuwait, Qatar, Russia, and Dubai.
These projects are varying through
- Roads and Highways
- Railways, high speed railways, metro lines
- Dams and hydroelectric power plants
- Tunnels for highways, railways, dams; using techniques like cut & cover, TBM, drilling & blasting, traditional excavation
- Bridges; segment pre-casting, launching girder erection, pre-cast segmental balanced cantilever bridges, post tensioning, prestressed beams lifting, single and double deck launching and heavy lifting
- Diaphragm walls,
- Earthworks, rockworks, rock blasting,
- Utilities
- River embankment.
Many of these projects were located in environmentally-sensitive areas, in mountain areas and in urban areas with high traffic volumes requiring huge management of traffic and utilities.
I have experience in planning and implementing HSE management systems, projects' management, constructions' management, planning and scheduling, implementation and monitoring of health, safety, and environment management plans and work methods.

Education

Various
Teachings and conferences

   Jan 1997
— Current

• January 1997 teaching of the duration of 10 hours on "Prevention of accidents in the construction works", relevant to the specialization course post-diploma as “Environmental Technicians", conferred by the Commercial - Technical institute "F. Galiani" of Chieti.
• April 2002 teaching of six hours, managed by ISQ - Institute Safety and Quality of Savignano sul Rubicone (FC), within the course 494 organized for the College of the Surveyors of the Province of Forlì - Cesena, with object: "Safety of the works at height: carpentries and concreting of beams, pillars and slabs in concrete, assembling and dismantling of prefabricated structures in armed concrete, wood and steel; executive techniques and prevention and protection measures."
• October 2002 teaching for course "Safety and health in the civil construction" - Project INAIL prog. ISI 32000022 - Form "Risk in the execution of the excavations."
• January 2003 teaching for course "Earth Moving Operators ", training project n° 2002/130 in IIPLE Bologna - Form "Occupational Safety in earth moving"
• February 2003 teaching for course “OIKOS”, "the works direction in the restoration and urban rearrangement" P.A. 2002/0433/Rer FSEs Ob. 3E1; form "Fixed and mobile metal scaffoldings, the staircases"
• March 2003 teaching for course IIPLE - Institute "Crescenzi - Pacinotti" - "Technical management in building projects" P.A. 2002/0854/Rer; forms "Lifting Equipment” (four hours) and "Vehicles Directive" (four hours).
• March 2005 teaching for course, held by IIPLE Bologna, "Safety Manager D. Lgs. 626/94" BO - 1° and. - A. F. 2005 - 3 hours "Technical Norms for safety - Scaffoldings and staircases"
• April 2005 teaching for course, held by IIPLE Bologna, "Training/Awareness for the workers involved in the project for the construction of the highway A 1 between Bologna and Florence - Highway A1 Milano-Roma" - batch 6 "The risk of run over", for the workers on the lot 4.
• February 2006 teaching for course held by IIPLE Bologna, “Training/Awareness for the workers involved in the project for the construction of the highway A 1 between Bologna and Florence - Highway A1 Milano-Roma" - batch 5 "The emergency management system" and batch 6 "The risk of run over", for the workers on the lots 9 / 11.
• May 11th 2007: intervention "The organization of the Safety in the building works" during the seminar of updating in occupational safety subject "Safety in building works: an appointment for life" held, on the occasion of the month for the Occupational Safety - May 2007, organized, by Industrial Association of Chieti, in Lanciano (CH)

Various
Studies and specializations

   Feb 1988
— Current

In February 1988 I was awarded of a scholarship EEC (European Union) finalized to the training in "Project Management"
The course, of ten months duration, had been organized by the company "Società Italiana per Condotte d’Acqua S.p.A." of Rome in its own project sites and it was articulated as follows:
• 11 weeks of theoretical lessons (activity of training performed by the A.N.C.I.F.A.P.) on the following matters: works’ accounting, administration and management of the project, safety normative, technical legislation, occupational medicine and sociology;
• 26 weeks of operational stages in the above listed projects of the same company.
• In January 1989 scholarship IRI - FSE finalized to the specialization in "Project Management”. The course was developed through operational stages on the projects of the same company.
• May - October '97 Safety training course of 32 hours, with particular attention to the specific risks connected to the works in the refinery.
• March 15th 2000: achievement of the certificate of attendance to the habilitation course for Safety Coordinators "D. Lgs. 494/96: execution of the Directive EEC 92/57" of the duration of 64 hours, held in the I.I.P.L.E. Bologna.
• January 18th and 19th 2001: course "Occupational Safety - The Prevention and Protection Service Manager” held in Rome, by ITA S.r.l.
• May 8th 2001: course “Occupational Safety - The Relationship between contractor and monitoring institution", held in Milan by ITA S.r.l.
• September 25th and 26th 2001: course “Fire Prevention - The Emergency Plan“, held in Rome, by ITA S.r.l.
• September 27th and 28th 2001: 2nd "National Convention of the Hygiene, Safety and Environment Managers" held in Modena.
• October " 1st 2001: course "First aid" (7.12 hours) held, by RFI, in Bologna.
• October 2nd 2001: course "Training for Employers and Safety Managers" held by ITALFERR S.p.a., in Rome.
• October 3rd and 4th 2001: conference "The assessment of Environment and Safety Management Systems" held in Rome, by AIDII
• October 17th and 18th 2001: course "Maintenance" held in Rome, by ITA S.r.l.
• April 10th 2002: training course for the fire prevention, evacuation and fireproofing, for medium risk activities, held by the Regional Direction of Firefighting Brigade in Bologna.
• September 18th 2002: training on "Environment, Safety and Integrated Management Systems”
• November 11th -15th 2002: course "The Prevention and Protection Service Manager” - duration of 40 hours - held in Milan by A.I.A.S. - I.S.Fo.P.
• February 1st 2005: seminar "Safety Cases, points of view to comparison: the monitoring institution, the coordinator and the legislator", held by IIPLE in Bologna.
• June 21st 2005: Achieved, from the Police department of Bologna, the license for the exercise of the activity as blast man for fire and electric blasting.
• June 28th - July 6th 2005: course, of 16 hours ex D. M. 15 July 2003 n° 388, of "First Aid", held in the structures of the company “Todini Costruzioni Generali S.p.a.” in Castiglione de’ Pepoli (BO).
• September - October 2006: course, of 32 hours, "The psycho - social risk, working discomfort, mobbing, stress and abuse of alcohol in the infrastructural projects"; held by the AUSL FI 10 in Borgo S. Lorenzo (FI), within the project "EURIDICE."
• November 2006: Certification "Training for Safety Managers - R.S.P.P. - D. Lgs. 626/94 - Managerial step C" held in IIPLE in Bologna.
• February - March 2007: Certification "Training for Safety Managers - R.S.P.P. - D. Lgs. 626/94 - Managerial step B" held in the structures of BTP Spa.
• October 4th – 12th 2010: Training course “Roadside and Safety Design”, 30 hours of instruction, held by “U. S. Department of Transportation – Federal Highway Administration” and “NHI – National Highway Institute” on behalf of, and hosted by, the “Kuwait Ministry of Public Works” in Kuwait City.
• 29th Sept – 10th Oct 2013: Training course “NEBOSH – International General Certificate in Occupational Health and Safety”, held by “Wataniya Environmental Services CO. (WES)” in Kuwait City – Kuwait
• 17th Feb 2014: International Certification in Occupational Health and Safety – practical application - “NEBOSH”, certificate n° IGC3/00210251/557982
• 10th – 14th May 2014: Certification course “HSE Train the Trainer” conducted by “TÜV NORD – Middle East” (Ref. No. TÜVME/HSE/1154/14, 14 May 2014, UAE – Ref. No. TÜV/KWT/HSE/23/13 – Rev. 02) in Kuwait City – Kuwait.
• 14th May 2014: certified as HSE trainer for the levels Top Management, Middle Management, Work force (Toolbox Meetings) – Certification conducted by “TÜV Nord – Middle East” – Ref. No TÜVME/HSE/1181/14, 14th May 2014, UAE
• 2nd – 6th Nov 2014: Training course, IRCA certified, “ISO 14001:2004 Lead Auditor Training” conducted by “TÜV NORD – Middle East” (Ref. No. TÜVME/EM/54152 30th November 2014, UAE in Kuwait City – Kuwait.
• January 22nd 2015: certified as Lead Auditor, for Environment Management Systems (ISO 14001: 2004) - Certification body "TÜV NORD CERT GmbH" - Course A14479 - Certified according to the IRCA EMS auditor certification scheme - Registration No. 3515 3725 08.
• August 29th 2015: Leadership training course held by ENERTECH at Doha, Qatar

Various
Memberships

   May 1987
— Current

• Since May 1987 I am member of the Italian Engineers Association - Province of Chieti, n° of order 714
• Since May 2013 I am member of the “Kuwait Society of Engineers”, n° of order 23597

Libera Università dell'Aquila - L'Aquila
Master Degree in Civil Engineering

   Oct 1977
— Nov 1986

Civil Engineering
Specialization: Structural

Liceo Scientifico "F. Masci" Chieti
Scientific Secondary High School degree

   Oct 1972
— Jul 1977

Experience

Buil Ing Srl
HS Consultant

   Sep 2019
— Oct 2019

Reconstruction of the Polcevera Viaduct - A10 Motorway – Genoa
In charge, on behalf of "RINA Spa", of monitoring, analysis and verification of occupational safety and accident prevention in the execution of the reconstruction project of the "Polcevera" viaduct in Genoa.
It is a steel structure, a continuous girder, consisting of 20 spans, for a total length of 1100 meters. The project foresees elliptical-section reinforced concrete piers, positioned at a constant 50-meter pace, with the exception of the Polcevera torrent and the railway lines spans, 100 meters long.
Awarded Amount: 202 mln. Euro

Reporting line:
Report directly to the Safety Coordinator during execution works

Responsibilities:
• monitor the respect of contractual HS requirements and the correct implementation of the Project HS Management Plan and relevant procedures; report to the Safety Coordinator during execution works
• monitor the Occupational HS protection is granted to all of the employees, in accordance with laws, regulations, internal procedures and contractual requirements
• investigate the incidents and report to the Safety Coordinator during execution works

Build Ing Srl
HS Manager

   Sep 2019
— Oct 2019

Reconstruction of the Polcevera Viaduct - A10 Motorway – Genoa
In charge, on behalf of "RINA Spa", of monitoring, analysis and verification of occupational safety and accident prevention in the execution of the reconstruction project of the "Polcevera" viaduct in Genoa.
It is a steel structure, a continuous girder, consisting of 20 spans, for a total length of 1100 meters. The project foresees elliptical-section reinforced concrete piers, positioned at a constant 50-meter pace, with the exception of the Polcevera torrent and the railway lines spans, 100 meters long.
Awarded Amount: 202 mln. Euro

Reporting line:
Report directly to the Safety Coordinator during execution works

Responsibilities:
• monitor the respect of contractual HS requirements and the correct implementation of the Project HS Management Plan and relevant procedures; report to the Safety Coordinator during execution works
• monitor the Occupational HS protection is granted to all of the employees, in accordance with laws, regulations, internal procedures and contractual requirements
• investigate the incidents and report to the Safety Coordinator during execution works

Rizzani de Eccher
HSE Manager

   Feb 2017
— Apr 2018

HSE Manager for Rizzani de Eccher – Viaduct superstructures’ works for the EXPOLINK 2020 – Dubai Metro Project with segmental and cast in situ technologies.
EXPOLINK 2020 Metro Project – Dubai – UAE

This “Route 2020 Metro Project” consists in the extension of the Red Line to the EXPO 2020 area.
The total alignment of the project comprises 14.966 km, which is for 3.775 km underground (not part of our scope of work) and 11.191 km elevated (2 viaducts).
our Scope of Works consist in:
a. Design and construction of precast yard and precast yard facilities
b. Assembly of equipment for precast element production
c. Assembly of equipment for lifting and moving precast elements in the precast yard
d. Production of precast segments and pier cap shells
e. Assembly equipment for erection of precast segments into final position
f. Transportation of precast elements from precast yard to site
g. Erection and cast in situ (II stage) of pier caps
h. Erection of segments by means of launching girders, lifting frames or cranes and post tensioning
i. Cast in situ of deck construction
j. Supply and installation of bearings
k. Finishing of the superstructure of the viaducts

Reporting line:
As the HSE Manager I respond and report directly to the Project Manager and advise him on all matters regarding HSE planning and performance of the project, together with the Emergency and Rescue management issues.

Achievements:
In this project we reached more than 2,000,000 worked hours without LTI.
In house induction provided to above 70% of manpower.
Main Contractor’s induction provided to almost 100% of manpower.
In house and / or third-party training, as per legal requirements, 100% performed.
Hygiene and HSE inspections performed on all of the living camps, both ours and subcontractors’.

Responsibilities:
• establish, implement and maintain an HSE Management System conforming to all of the applicable laws, standards and regulations
• monitor the respect of contractual HSE requirements and the correct implementation of the Project HSE Management Plan and relevant procedures
• monitor the Occupational Health, Safety and Environment protection is granted to all of the employees, in accordance with laws, regulations, internal procedures and contractual requirements
• report, on the performance of the HSEMS, to the Top Management for review and as a basis to improve the system’s performance
• Plan, organize and manage health, first aid and rescue activities and team
• Plan, organize and carry on HSE training, awareness and induction for all of the employees and manpower, as per relevant qualifications
• Plan, organize and perform living camps’ inspections, and report to PM
• Investigate the incidents and report to the PM

CODEST - De Eccher Group
HSE Manager

   Apr 2016
— Oct 2016

HSE Manager for Rizzani de Eccher – Viaduct superstructures’ works for the EXPOLINK 2020 – Dubai Metro Project with segmental and cast in situ technologies.
EXPOLINK 2020 Metro Project – Dubai – UAE

This “Route 2020 Metro Project” consists in the extension of the Red Line to the EXPO 2020 area.
The total alignment of the project comprises 14.966 km, which is for 3.775 km underground (not part of our scope of work) and 11.191 km elevated (2 viaducts).
our Scope of Works consist in:
a. Design and construction of precast yard and precast yard facilities
b. Assembly of equipment for precast element production
c. Assembly of equipment for lifting and moving precast elements in the precast yard
d. Production of precast segments and pier cap shells
e. Assembly equipment for erection of precast segments into final position
f. Transportation of precast elements from precast yard to site
g. Erection and cast in situ (II stage) of pier caps
h. Erection of segments by means of launching girders, lifting frames or cranes and post tensioning
i. Cast in situ of deck construction
j. Supply and installation of bearings
k. Finishing of the superstructure of the viaducts

Reporting line:
As the HSE Manager I respond and report directly to the Project Manager and advise him on all matters regarding HSE planning and performance of the project, together with the Emergency and Rescue management issues.

Achievements:
In this project we reached more than 2,000,000 worked hours without LTI.
In house induction provided to above 70% of manpower.
Main Contractor’s induction provided to almost 100% of manpower.
In house and / or third-party training, as per legal requirements, 100% performed.
Hygiene and HSE inspections performed on all of the living camps, both ours and subcontractors’.

Responsibilities:
• establish, implement and maintain an HSE Management System conforming to all of the applicable laws, standards and regulations
• monitor the respect of contractual HSE requirements and the correct implementation of the Project HSE Management Plan and relevant procedures
• monitor the Occupational Health, Safety and Environment protection is granted to all of the employees, in accordance with laws, regulations, internal procedures and contractual requirements
• report, on the performance of the HSEMS, to the Top Management for review and as a basis to improve the system’s performance
• Plan, organize and manage health, first aid and rescue activities and team
• Plan, organize and carry on HSE training, awareness and induction for all of the employees and manpower, as per relevant qualifications
• Plan, organize and perform living camps’ inspections, and report to PM
• Investigate the incidents and report to the PM

Rizzani de Eccher
HS Manager

   Jan 2015
— Apr 2016

HS Manager for the RLR (Rizzani – Lotte – Redco) Joint Venture
Doha Metro Project "Red Line North - Elevated and At Grade" - Doha – Qatar
The Doha Metro is part of the Qatar Integrated Railways Program (QIRP).
The Site commences close to the Doha Golf Club entrance (where Red Line North Underground system – Lot 1.5 - ends) crossing the Qatar University over the planned campus and turns north-east approaching the Al Kohr highway where it continues along the alignment of the future P60 highway.
Red Line North Elevated and At Grade System has an overall length of 6.7 km with the following main features:
2.3 km elevated sections;
2.2 km at grade sections;
1.9 km in trough/tunnel sections;
one elevated station (Qatar University Station);
one at grade (sub-grade) station (Lusail Centre Station);
one pedestrian bridge at Lusail

Awarded Amount: QAR 2,219,802,901.00 – EUR 565,314,000

Reporting line:
As the HS Manager I respond and report directly to the Project Director and advise him on all matters regarding HS planning and performance of the project, together with the Emergency and Rescue management issues.

Achievements:
• In this project we reached more than 1,500,000 worked hours without LTI.
• In house induction provided to almost 100% of manpower.
• In house and / or third-party training, as per legal requirements, 100% performed.
• Hygiene and HSE inspections performed on all of the living camps, both ours and subcontractors’ in conformity with “Qatar Foundation Standard for Migrant Workers”.

Responsibilities:
• establish, implement and maintain an HSE Management System conforming to all of the applicable laws, standards and regulations
• monitor the respect of contractual HSE requirements and the correct implementation of the Project HSE Management Plan and relevant procedures
• monitor the Occupational Health, Safety and Environment protection are granted to all of the employees, in accordance with laws, regulations, internal procedures and contractual requirements
• report, on the performance of the HSEMS, to the Top Management for review and as a basis to improve the system’s performance
• Plan, organize and manage health, first aid and rescue activities and team
• Plan, organize and carry on HSE training, awareness and induction for all of the employees and manpower, as per relevant qualifications
• Plan, organize and perform living camps’ inspections, and report to PD
• Investigate the heavy incidents, and report to the PD

Rizzani de Eccher
HSSE Manager

   May 2011
— Jan 2015

HSSE Manager for the ROBT (Rizzani – OHL – Boodai - Trevi) Joint Venture
Motorway “Jamal Abdul Nasser Street Project” – Kuwait City – Kuwait
The Jamal Abdul Nasser Project (also known as RA 167) is one of the major infrastructure and road development projects taking place in the State of Kuwait and is part of the Ministry of Public Works strategic plans to enhance motorways and roads in the State of Kuwait. The Project will transform and upgrade the existing street into a motorway that adheres to international standards. The Project includes a series of complex bridge works and elevated highways throughout the length of the project.
Elevated structures include:
• 4 level interchange on Ghazali road (first in Kuwait)
• 7.2 km of elevated highway.
• 6 to 8 lanes wide elevated highway
• Depressed road with two roundabout bridges.
• 9 roundabouts
• 3 interchanges
• 8 pedestrian overpasses

In addition to transforming the Jamal Abdul Nasser into a unified highway, the project also includes a number of utilities' networks including electrical and communications cabling, sewerage and storm water drainage structures along the length of the project route which requires the relocation, protection, and refurbishment.
Utilities’ works include:
• Relocation of water lines
• Preservation works and relocation of gas lines
• Relocation of Telephone services
• Rainwater drainage system
• Relocation of sewage system
• Relocation of Low Voltage (LV) & High Voltage (HV) cables
• Irrigation and project location works

Awarded Amount: 859,671,775 US $ – EUR 797,750,000

Reporting line:
As the HSSE Manager I respond and report directly to the Project Director and advise him on all matters regarding HSSE planning and performance of the project, together with the Emergency and Rescue management issues.

Achievements:
In this project we reached more than 3,500,000 worked hours without LTI.
In house induction provided to almost 100% of manpower.
In house and / or third-party training, as per legal requirements, 100% performed.
Hygiene and HSE inspections performed on all of the living camps, both RdE’s and subcontractors’.

Responsibilities:
• Establish maintain and monitor a sound Security system at offices and site areas
• establish, implement and maintain an HSE Management System conforming to all of the applicable laws, standards and regulations
• monitor the respect of contractual HSE requirements and the correct implementation of the Project HSE Management Plan and relevant procedures
• monitor the Occupational Health, Safety and Environment protection are granted to all of the employees, in accordance with laws, regulations, internal procedures and contractual requirements
• report, on the performance of the HSEMS, to the Top Management for review and as a basis to improve the system’s performance
• Plan, organize and manage health, first aid and rescue activities and team
• Plan, organize and carry on HSE training, awareness and induction for all of the employees and manpower, as per relevant qualifications
• Plan, organize and perform living camps’ inspections, and report to PD
• Investigate the heavy incidents and fatalities and report to the PD

Rizzani de Eccher
HSE Manager

   Sep 2010
— Apr 2011

HSE Manager for the main contractor “The Arab Contractors – Cairo – Egypt” and the joint ventures:
• JV 1 – “The Arab Contractors” and “Kuwait Arab Contractors” - For the execution of the project; utilities diversions, foundations, elevations, pier heads, except for the bridges deck.
• JV 2 - “The Arab Contractors” – “INTERBRIDGE” (De Eccher group) - For the execution of the bridges’ decks.
Highway “Jahra Road Project” – Kuwait City – Kuwait
The Jahra development project is the upgrade of existing at-grade Jahra road located in the dynamic industrial area of Shuwaikh. It is one of the busiest places of Kuwait, as educational institutions, hospitals, industrials, offices, and the most important port of Kuwait, the Port of Shuwaikh, are situated in this area.
The project consists of 17.7 km of viaduct and aims to appease and accommodate the current traffic volume and its expected growth. The project is composed of a main viaduct and of several link bridges. The Jahra viaduct will provide an instant access to Kuwait city when arriving from the west. The link bridges will facilitate the traffic between the viaduct and other main transport infrastructures. Moreover, the Jahra development project will be connected to the Jamal Abdul Nasser project.

Awarded Amount: 264,000,000 KD – EUR 800,000,000

Reporting line:
As the HSE Manager I respond and report directly to the Project Director and advise him on all matters regarding HSE planning and performance of the project, together with the Emergency and Rescue management issues.
Responsibilities:
• establish, implement and maintain an HSE Management System conforming to all of the applicable laws, standards and regulations
• monitor the respect of contractual HSE requirements and the correct implementation of the Project HSE Management Plan and relevant procedures
• monitor the Occupational Health, Safety and Environment protection are granted to all of the employees, in accordance with laws, regulations, internal procedures and contractual requirements
• report, on the performance of the HSEMS, to the Top Management for review and as a basis to improve the system’s performance
• Plan health activities and team

Salini Costruttori
HSE Manager

   Mar 2010
— Aug 2010

HSE Manager
South Western Roads Project Western Europe - Western China International Transit Corridor - lots 1 - 5 (Salini Costruttori) and lots 9 - 14 (Todini Costruzioni Generali) in Kazakhstan
The South West Roads Project aims to increase transport efficiency along the road sections between Aktobe/Kyzylorda Oblast border and Shymkent and to improve road management and traffic safety in Kazakhstan.
Awarded Amount: 2.5 bn US $ – EUR 2.3 bn

Reporting line:
Report to the project manager, hierarchically, and to Corporate QHSE Manager, functionally.

Responsibilities:
• establish, implement and maintain an HSE Management System conforming to all of the applicable laws, standards and regulations
• monitor the respect of contractual HSE requirements and the correct implementation of the Project HSE Management Plan and relevant procedures
• monitor the Occupational Health, Safety and Environment protection are granted to all of the employees, in accordance with laws, regulations, internal procedures and contractual requirements
• report, on the performance of the HSEMS, to the Top Management for review and as a basis to improve the system’s performance
• Plan health activities and team

Salini Costruttori
HSE Manager

   Mar 2009
— Mar 2010

HSE Manager
Gilgel Gibe II Hydroelectric Power Plant in Ethiopia
The Gilgel Gibe II Hydropower Project is the second of the three plants included in the cascade.
It is situated 250 km south-west of Addis Ababa and 80 Km north-east of Jima.
The project includes a 50 m high, gravity, dam, with a crest length of 140 m., a power tunnel, a double penstock and a 420 MW power house.
The 26 Km power tunnel (D = 6 m) is excavated almost entirely using TBM technology.
The gross head of 505 m is created by a water way crossing the ridge between the Gilgel Gibe valley and the Omo valley by means of a 26 km power tunnel and 500 m long penstocks.
4 Pelton turbines in the outdoor power house provide 420 MW installed power producing 1650 GWh per year.

Reporting line:
Report to the project manager, hierarchically, and to Corporate QHSE Manager, functionally.

Responsibilities:
• establish, implement and maintain an HSE Management System conforming to all of the applicable laws, standards and regulations
• monitor the respect of contractual HSE requirements and the correct implementation of the Project HSE Management Plan and relevant procedures
• monitor the Occupational Health, Safety and Environment protection are granted to all of the employees, in accordance with laws, regulations, internal procedures and contractual requirements
• report, on the performance of the HSEMS, to the Top Management for review and as a basis to improve the system’s performance
• Manage health, first aid and rescue activities and team
• Investigate the heavy incidents and fatalities and report to the PM and to Corporate QHSE Manager

Salini Costruttori
HSE Manager

   Jul 2007
— Mar 2009

HSE Manager
Gibe III Hydroelectric Power Plant in Ethiopia
The works consist of the design and construction of a Roller Compacted Concrete (RCC) dam, and an open-air power plant with 10 Francis turbines with a total installed power of 1,870 MW and an expected energy output of 6,500 GWh per year.
The project also involves three diversion tunnels, one power tunnel, one gate shaft, one surge shaft, two intake structures, two horizontal tunnels, four vertical wells and two distributors.

MAIN TECHNICAL DATA:

Dam 246 m height, crest length 630 m:
Excavation: 4,000,000 m3
Roller Compacted Concrete: 6,114,000 m3

River Diversion:
Excavation of diversion tunnels (n.3): 1,270,000 m3
D/S Cofferdam (Embankment): 35,000 m3
U/S Cofferdam (Embankment): 600,000 m3

Powerhouse:
Excavation: 1,160,000 m3
Reinforced concrete: 200,000 m3

Power Waterways (Intake + Gate Shaft + Surge Shaft +Tunnel):
Excavation: 1,500,000 m3
Reinforced Concrete: 135,000 m3

Spillway:
Reinforced Concrete: 120,000 m3

Awarded Amount: € 2,00 bn

Reporting line:
Report to the project manager, hierarchically, and to Corporate QHSE Manager, functionally.

Achievements:
• Internal induction planned, organized and performed
• In house training, for different qualifications and hazards, planned, organized and performed.
• Hygiene and HSE inspections performed on all of the living camps, kitchens, canteens and sanitary structures in the project.

Responsibilities:
• establish, implement and maintain an HSE Management System conforming to all of the applicable laws, standards and regulations
• monitor the respect of contractual HSE requirements and the correct implementation of the Project HSE Management Plan and relevant procedures
• monitor the Occupational Health, Safety and Environment protection are granted to all of the employees, in accordance with laws, regulations, internal procedures and contractual requirements
• report, on the performance of the HSEMS, to the Top Management for review and as a basis to improve the system’s performance
• Plan, organize and manage health, first aid and rescue activities and team
• Investigate the heavy incidents and fatalities, in the project, and report to the Corporate Top Management
• Plan, organize and carry on HSE training and awareness for all of the employees and manpower, as per relevant qualifications
• Plan, organize and perform inspections in living camps’, kitchens, canteens and sanitary structures, and report to PM
• Investigate the heavy incidents and fatalities and report to the PM and to Corporate QHSE Manager

Baldassini Tognozzi Pontello
HS Consultant

   Jul 2006
— Jun 2007

Site HS in charge
“A 1 Motorway”: Milan Naples – Valico bypass BO FI - Lot 12" - Tunnels and viaducts
This project is a part of the largest project being constructed by Autostrade per l'Italia, consisting of the upgrading of the A1 Motorway by constructing the Valico Bypass on the 62.5 km Apennine section between Sasso Marconi and Barberino del Mugello.
“A 1 Motorway”: Milan / Naples - Enlargement to the third lane of the “Highway A 1- Barberino del Mugello / Incisa Valdarno - Lots 4, 5, 6" - Tunnels and viaducts

Reporting line:
report to the project manager, hierarchically, and to Corporate QHSE Manager, functionally.

Responsibilities:
• Control of Gas emissions in the tunnels and evacuation (automatic gas detection and alarm systems, training, readiness, mock drills) preparation.
• Planning and implementation of emergency communications form/to the tunnels
• Study of exhaust gas emissions in tunnels, planning of fuels and equipment to be used
• Planning of the forced ventilation plants in the tunnels
• establish, implement and maintain an HS Management System conforming to all of the applicable laws, standards and regulations
• monitor the respect of contractual HS requirements and the correct implementation of the Project HS Management Plan and relevant procedures
• monitor the Occupational Health, Safety and Environment protection are granted to all of the employees, in accordance with laws, regulations, internal procedures and contractual requirements
• report, on the performance of the HSMS, to the Top Management for review and as a basis to improve the system’s performance
• Manage health activities and team
• Plan, organize and carry on HSE training and awareness for the employees

RI.SAL.TO. Joint Venture
HS Manager

   May 2004
— Jun 2006

- Mar 2006 - Jun 2006: Health & Safety Manager for the external works
- Dic 2005 - Mar 2006: Health & Safety Manager
- Lug 2005 - Dec 2005: Health & Safety Manager TODINI
- May 2004 - Dic 2005: Health & Safety Manager RISALTO
“A 1 Motorway”: Milan Naples – Valico bypass BO FI - Lots 9 / 10 / 11".
This project is a part of the widest project being constructed by Autostrade per l'Italia, consisting of the upgrading of the A1 Motorway by constructing the Valico Bypass on the 62.5 km Apennine section between Sasso Marconi and Barberino del Mugello.
The construction mainly consists of the work symbolising the Valico Bypass, i.e., the Base Tunnel. This is a double tunnel with split carriageways about 8.6 km long with an average section of 180 m2. The entire section is 11.2 km long overall and entails the construction of the Base Tunnels as well as double 300 m. long tunnel (Poggio Civitella) and three viaducts with a mixed steel and concrete structure (Badia Nuova Viaduct, Setta I Viaduct and Casaglia Viaduct).
In addition, the Badia interchange is being built with an additional four on / off-ramps and related works for the toll booth; the Poggiolino interchange and snow area.

MAIN TECHNICAL DATA:
Motorway surface works in tunnels:

Length of two tunnels and adit: 17,800 m
Excavation: 3,304,218 m³
Concrete lining: 1,040,447 m3
Steel for supporting structures: 32,295,115 kg

External motorway surface works:

Motorway: 11,220 m
Secondary roads: 24,856 m
3 motorway viaducts: 1,355 m
Excavations: 1,559,075 m³
Embankments: 4,926,145 m3
Reinforced concrete: 396,670 m3

Awarded Amount: € 600 million

Reporting line:
report to the project manager

Achievements:
In house and / or third-party training, as per legal requirements, 100% performed.

Responsibilities:
• Plan and monitor the communication systems (inside – outside) in the tunnels
• Control of Gas emissions in the tunnels and evacuation (automatic gas detection and alarm systems, training, readiness, mock drills) preparation.
• Planning and implementation of emergency communications form/to the tunnels
• Study of exhaust gas emissions in tunnels, planning of fuels and equipment to be used
• Planning of the forced ventilation plants in the tunnels
• establish, implement and maintain an HS Management System conforming to all of the applicable laws, standards and regulations
• monitor the respect of contractual HSE requirements and the correct implementation of the Project HS Management Plan and relevant procedures
• Plan, organize and carry on HSE training, awareness and induction for all of the employees and manpower, as per relevant qualifications

ITALFERR SPA - Italian railway group
HS Manager

   Oct 2000
— Apr 2004

HS Manager – Safety expert
Safety Expert, in the staff of the Construction Manager, in the activity of supervision on the works for construction of the High-Speed railway line Venice - Turin, line Turin - Milan, subline Turin – Novara
The line runs for 125 km (86.4 km from Turin to Novara and 38.3 km from Novara to Milano) with 121 km above ground (embankments, bridges and viaducts) and 4 km in bored tunnel and cut-and cover tunnel sections. 4/5 of the line goes through Piedmont (in the provinces of Turin, Vercelli and Novara) whilst 1/5 passes though Lombardy (in the province of Milan). The various operations scheduled in the local area include: 58 km of noise barriers, 580 hectares of landscaping, about 75 km of road systems serving sites and 23 archaeological investigations. There are five interconnections between the High Speed/High Capacity line and the existing one, with a total length of about 15 km.
Health & Safety Manager for the “Operational Direction - Rome” unit.
The charge is extended to the Italferr units in Bologna, Florence and Arezzo and the High-Speed railway projects Bologna - Naples, of competence of the “Operational Direction Rome”.
Health & Safety Manager for the Production Unit 2. The charge is extended to the whole area of influence of the P. U. 2, that is Tuscany, Emilia-Romagna, Veneto, Friuli-Venezia-Giulia and Trentino – Alto Adige, with a main office (Bologna), and peripheral units (Arezzo, Florence, Pisa, Verona, Mestre, Udine) and the relevant railway projects.
Centre - Northern Italy area safety expert
Safety Coordinator in construction phase on the following projects relevant to the construction of the high-speed railway by-pass of Bologna:
Project 19 (basic amount It £ 16.980.000.000).
Project 20 A (basic amount It £ 7.300.000.000).

Reporting line:
report to the Area / Production Unit, hierarchically, and to Corporate HS Manager, functionally.
Responsibilities:
• ITALFERR, as an engineering firm, is involved in railway projects as designer and consultant and, as HS department, my main responsibilities are to supervise and monitor (through audits and inspections) the construction activities held by the Contractors and report to my top management; as HS manager my activity is to take care of the Health and Safety of our employees during their activities, both at office and site;
• Assist ITALFERR project directors (on consultant side) on all of the HS related matters of the projects;
• establish, implement and maintain an HS Management System conforming to all of the applicable laws, standards and regulations
• monitor the respect of contractual HS requirements and the correct implementation of the Project HS Management Plan and relevant procedures
• monitor the Occupational Health and Safety protection are granted to all of the employees, in accordance with laws, regulations, internal procedures and contractual requirements
• report, on the performance of the HSMS, to the Top Management for review and as a basis to improve the system’s performance
• Manage health activities and team
• Investigate the heavy incidents and fatalities along the railway projects in my areas, and report to the Corporate Top Management and Public Relations Department

NOVACONSULT Safety and Environment
HS Senior Advisor

   Oct 1998
— Sep 2000

Health and Safety senior advisor
In charge, on behalf of "ITALFERR S.p.A." (Italian railway group), of the monitoring, analysis and check in occupational safety and prevention of accidents, within the project "High speed railway Bologna - Florence"
About 78.5 Km long of which over 93% tunnels, this line stretches out partially into the region of Emilia and partially into Tuscany, passing through 12 different municipalities - 6 in the province of Bologna and 6 in the province of Florence.
Out of the tunnels crossing the mountainous and upland terrain of the Apennines (and many are over 10 km in length) the longest is the Vaglia tunnel, measuring over 18 km.
The characteristics of the project are the complicate geographical location, and the massive presence, possible or probable, of gas (mainly methane) along the excavation of almost all of the tunnels.
The activities for the new infrastructure include: over 8 km of noise barriers, 140 km of new road systems serving the sites and 13 archaeological operations. The new and existing lines were linked up by means of an interconnection at S. Ruffillo situated in the Bologna area and measuring about 5 km.
Moreover, to ensure tight safety conditions during operations (bearing in mind the strict safety requirements necessary for hazardous tunnel work), cutting-edge and high performing technology systems and installations were developed and used for the job.

Reporting line:
report to the project manager, hierarchically, and to Corporate HS Manager, functionally.

Responsibilities:
• ITALFERR, as an engineering firm, is involved in railway projects as designer and consultant and, as HS department, my main responsibilities are to supervise and monitor (through audits and inspections) the construction activities held by the Contractors and report to my top management;
• Assist ITALFERR project directors (on consultant side), in the area of Bologna, on all of the HS related matters of the projects;
• Monitoring of control of Gas emissions in the tunnels and evacuation (automatic gas detection and alarm systems, training, readiness, mock drills) readiness.
• Monitoring of emergency communications form/to the tunnels
• monitor the respect of contractual HS requirements and the correct implementation of the Project HS Management Plan and relevant procedures
• monitor the Occupational Health and Safety protection are granted to all of the employees, in accordance with laws, regulations, internal procedures and contractual requirements
• Hygiene and HSE inspections performed on all of the living camps in the project.
• report, on the performance of the HSMS, to the Top Management for review and as a basis to improve the system’s performance
• Investigate the heavy incidents and fatalities, along the project, and report to ITALFERR’s Corporate Top Management and Public Relations Department

Germano Belli Costruzioni
Production Manager

   Mar 1997
— Sep 1998

Production Manager and Safety & Quality manager
Production Manager and Safety manager on the project for “The extension of the Box B and construction of the cable line Box B - Box D”, inside the API refinery, to interconnect them with the “Integrated Gasification Combined Cycle” (I.G.C.C.) turbogas power plant.
Production Manager and Safety & Quality manager on the project for the execution of the civil works of the new I.G.C.C. turbogas plant, inside the API refinery in Falconara Marittima (AN), as subcontractor for the company "ABB - SAE SADELMI" of Milan.
Included in the project are the civil works and installation of rack ways for the construction of:
1. Gasification area
2. Gas cooling area
3. Sulphur recovery area
4. Gas turbine
5. Steam turbine
6. # 2 satellite buildings
7. 132 KV cable way
8. Electric power station
Safety coordinator in the works of “Maintenance” and of “Construction”, inside the aforesaid refinery.
Coordinator of the “Safety ‘97 Project” for the safety training of the employees (workers, foremen and subcontractors) working within the refinery.

Reporting line
Reporting to the company’s owner
Achievements:
In house and / or third-party training, as per legal requirements, 100% performed

Rocco e Domenico Di Marzio
Project Manager

   Aug 1992
— Jul 1996

Project manager and Safety manager on the project of construction and completion of the roads and urbanization infrastructures of the northern agglomeration of Città Sant'Angelo (PE).
The project includes the urbanization works (utilities and ancillary roads) and the construction of the road connecting the industrial area to the A 14 highway (embankments, 1 trough and one 8 spans bridge).
Saline river - Città Sant'Angelo (PE) - Cleanup of the riverbed of the river and reconstruction of the left bank of the river.

Reporting line
Reporting to the general manager

Todini Spa Costruzioni Generali
Project Manager

   Jan 1991
— Jul 1992

Project manager
“Safeguard of Venice from high water” project - During such jobs we have executed:
1. Opening of the passages of water on the S.S. 309 "Romea", in the tract in lagoon, for the restoration of the hydraulic balance within the lagoons of Venice and the "Brenta" river one (reshaping of the road embankment and construction of four viaducts in substitution of the pre-existing road embankment).
2. Anti-siphon works of the “San Giorgio” island (underground curtain with Jet Grouting technology) and Consolidation of “Palazzo Cini”, in S. Giorgio Island.
3. Execution of improvement and strengthening of the shore of Pellestrina Island (reshaping of the reef), construction of anti-siphon works (underground hydraulic double barriers, 30 and 15 m. deep, propaedeutic to the installation of the floating dams – “MOSE”) and consolidation of the historical wall called "Murazzi di Ca’ Roman".

Reporting line
Reporting to the North Eastern area manager

Todini Spa Costruzioni Generali
Site Engineer

   May 1989
— Jan 1991

Site engineer
Consortium BA.TA. - Double track railway project "Bari – Taranto”. In the project we proceeded to the construction of the tunnel "Madonna of the Carmine" (4000 meters) and of the viaduct "Renella" (1500 meters) in territory of Castellaneta (TA).

Reporting line
Reporting to the Project Manager

European Union - FSE - IRI - Soc. Italiana Condotte d'Acqua
Scholarship Holder

   Mar 1988
— May 1989

Holder of two scholarships (the first one disbursed by the EEC, the second by the IRI-FSE) managed by the company "Società Italiana per Condotte d’Acqua S.p.A." of Rome.
Scope of the scholarships was the training and the specialization in “Project Management”
Operational Stages in Fadalto (TV) on the project for the execution of the tunnel "Fadalto", of around 2000 meters, on the highway "Mestre - Vittorio Veneto - Pian di Vedoia."
Operational Stages in Trevi (PG), on the project for the construction of the double track of the high-speed railway on the line FF.S. "Orte - Falconara" on behalf of the consortium "CO.MA.VI.".
Both the scholarships were divided into site stage phases alternated with weeks of class, theoretical, lessons.

Reporting line
Reporting to the Project Manager and corporate HR Dept.

Responsibilities:
• attendance to theoretical lessons
• design study of the bidirectional exit of "Fadalto"
• quality controls of consolidation works at the North side of the "Fadalto" tunnel
• activities, on site, to support the site manager
• executive design of parts of the works (waterproofing, underpasses, hydraulic arrangements)
• quantity survey and orders for building materials

Ad
Ad
Ad