CONSTRUCTION MANAGER ( OIL & GAS industry )


Last Updated: 2nd August 2017 (over 5 years ago)

Address
France

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Degree

Languages
English, French, Portuguese

Summary

PROFILE
• Skilled in leadership and management of site construction activities with proven ability to manage the interfaces with various stakeholders during project execution.
• Ability to lead, motivates, coach and develops the technical and management skills of site construction team.
• Good skill in inspection department.
• Shutdown coordinator and preparation manager.
• Lead the safe and efficient pre-commissioning and commissioning activities
• Coordinate site Daily, Weekly and Monthly Project Progress Reports.
• Manage permit to work , installation procedure and risk assessments
• Good knowledge and analyze on ISO, PID, and general company specification.
• Ability to communicate effectively at all levels.
• Active participant in company HSE policy and the ability to lead by example in this area.
• Capable of managing projects in a multi-cultural and multi-disciplinary team setting.
• Good English Language communication skills.

LANGUAGES

• French, English, Portuguese.

TRAINING

• Offshore survival certificate (BOSIET Valid until 2019).
• H2S Course.
• Hydratight torquing and bolt tensioning certificate.

QUALIFICATION

• 2000/2002 : BTS in Mechanical and Construction Works at lycée Paul Constant, Montluçon.
• 1998/2000 : BAC in Mechanics, specialisation: metal-works at lycée Paul Constant, Montluçon.
• 1996/1998 : BEP and CAP in metal-sheets production, automotive industry at lycée Albert Einstein, Montluçon.

PROFESSIONAL CAREER

April 2012 to present :
SONANGOL/ PONTICELLI, Block 3/05 Revamping campaign Angola

CONTRACT SITE REPRESENTATIVE (4x4 Offshore)

 Manage a team of 50 peoples composed of structural and pipe fitters, welders on 15 different
platforms around the field.
 In charge of surveyor team for spools and structural survey, to be able to launch the
prefabrication onshore or offshore. I'm in close collaboration with the client and the inspection department, in order to localize and plan the replacement like to like of all corroded pipe or structure, but also for new project installation.
 Manage Shutdown preparation and coordination. Every year during a period of 15 to 30 days, with
a team of 200 workers around the field.
 In charge of the QA/QC reporting and HSE policy application.
 Manage the permits to work, risk assessment and Installation procedure. Organize meeting prior to
launch activities.

January 2010 to April 2012 :
EXXON MOBIL / PONTICELLI, KIZOMBA Satellite Project. KIZ B FPSO Angola

CONTRUCTION MANAGER (4x4 Offshore)

 In charge of the top side installation on FPSO B. Managing all discipline : mechanical, rigging,
Scaffolding, painting, electrical and instrument. Around 1 000 000 of man hour with 2200 t of piping and structure installed.
 In close collaboration with the client for the planning coordination, the progress follow up
and the application of the HSE policy.
 In charge of the Preparation, organization and follow up of all components concerning the Pre-
commissioning and the Commissioning.
 Manage the QA/QC reporting and HSE policy application.
 Manage the permits to work, risk assessment and Installation procedure
 Responsible for managing the materiel supply on field.

September 2008 to January 2010 :
EXXON MOBIL / PONTICELLI, Gas Gathering Project. KIZ B FPSO Angola

CONTRUCTION MANAGER (4x4 Offshore)

 In charge on FPSO B of top side installation of, new pig launcher and deck extension with pipe
support, pipe spool and valves. Managing all discipline: mechanical, rigging, scaffolding, painting, electrical and instrument. Around 150 000 man hours. 30t structure and 30t of piping.
 In close collaboration with the client for the coordination of the planning, the progress follow up
and the application of the HSE policy.
 In charge of the Preparation, organization and follow up of all components concerning the Pre-
commissioning and the Commissioning.
 Manage the QA/QC reporting and HSE policy application.
 Manage the permits to work, risk assessment and Installation procedure
 Responsible for managing the materiel supply on field.

June 2006 to September 2008 :
SONANGOL / SAIPEM, Block 2 Angola

CONSTRUCTION MANAGER (4x4 Offshore)

 In charge of survey and drawings preparation, for replacement like to like of all corroded pipe or
structure, but also for new project installation.
 Responsible for managing the materiel supply on field.
 Manage onshore prefabrication progress and all quality control.
 In close collaboration with the client for the planning coordination, the progress follow up and the
application of the HSE policy.

December 2005 to June 2006 :
TOTAL / SAIPEM-SA, DALIA project Angola

CONSTRUCTION SUPERINTENDENT (10x4 Onshore)

 Fabrication Superintendent for the construction and FAT’s of Technip production jumpers.
 In charge of dressing, fit up, rigging, and sea-fastening with a full autonomy.
 In direct contact with the customer and the contractor for any change and improvement.
 In close collaboration with the store for any follow-up and material supply.

April 2005 to December2005 :
TOTAL / SAIPEM-SA, ROSA FMC Project Angola

CONSTRUCTION SUPERVISOR (10x4 Onshore)

 Construction supervisor of five FMC manifold.Full autonomy on the methods of assembling,
manufacturing and testing. In close collaboration with the client for any change and improvement.

March 2004 to April2005 :
EXXON MOBIL / SAIPEM-SA, KIZOMBA B Project Angola

CONSTRUCTION SUPERVISOR (10x4 Onshore)

 November 2004 to April 2005 : Supervisor for the construction and FAT’s of Cameron well and
production jumpers on ExxonMobil project, ( Duplex 22%Cr and X70 ).
In charge of dressing, fit up, rigging, and sea fastening with a full autonomy.
 May 2004 to November 2004 : supervisor for five Gravity foundation building
In charge of the whole building part and the assembling methods.
 March 2004 to may 2004 :Piping works for the setting of the water line and the air line for the
production shop.

August 2002 to march 2004 :
SHELL / BOUYGUE OFFSHORE, COWTHORNE Channel Project Nigeria

CONSTRUCTION SUPERVISOR (6x3 Onshore/Offshore)

 Setting of 90 km of pipelines for the gas transport in the swamp (mangrove).
 Welder and fitter supervisor for the realization of 9 km pipe chrome.
 Supervisor for the whole prefabrication and logistic part.
 In charge of the building of all the structures necessary for the pipe setting
 Deputy of construction manager for a good working of the production barge.

Ad
Ad
Ad